Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Install and maintain emergency lighting systems
Install and maintain emergency lighting systems
Unit of competency
National Code
UEEEL0048
UEEEL0048
State Code
OBZ92
OBZ92
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
12/07/2021
Field of Education
031313 - Electrical Fitting, Electrical Mechanics
Original Release Date
12/07/2021
Nominal Hours
36
Description
This unit involves the skills and knowledge required to install and maintain emergency lighting systems in buildings and premises. It includes preparing, installing and maintaining emergency systems by working safely, using installation and maintenance industry standards, and completing required documentation.The skills and knowledge described in this unit require a licence or permit to practice in the workplace where work is carried out on electrical installations which are designed to operate at voltages greater than 50 volt (V) alternating current (a.c.) or 120 V direct current (d.c.). Competency development activities in this unit are subject to regulations directly related to licensing. Where a licence or permit to practice is not held, a relevant contract of training, such as an Australian Apprenticeship, may be required. Additional and/or other conditions may apply in some jurisdictions subject to regulations related to electrical work. Practice in the workplace and during training is also subject to work health and safety (WHS)/occupational health and safety (OHS) regulations.
Notes
Elements and Performance Criteria
1 Prepare to install and maintain emergency lightingsystem
- 1.1 WHS/OHS requirements and workplace procedures for a given work area are identified and applied
- 1.2 Hazards are identified, risks assessed and control measures implemented
- 1.3 Safety hazards not previously identified are noted on job safety sheet and risk control measures are implemented
- 1.4 Installation/maintenance is prepared in consultation with others affected by work and sequenced appropriately
- 1.5 Nature and location of work is determined from documentation and/or appropriate person/s
- 1.6 Location of apparatus and associated equipment is planned within the constraints of the building structure, significants and regulations
- 1.7 Advice is sought from appropriate person/s to ensure work is coordinated effectively with others
- 1.8 Material needed for the installation work is obtained in accordance with workplace procedures and checked against job requirements
- 1.9 Tools, equipment and testing devices needed for installation work are obtained in accordance with workplace procedures and checked for correct operation and safety
- 1.10 Preparatory work is checked to ensure no damage has occurred and complies with job requirements and specifications
2 Install and maintain emergency lighting system
- 2.1 WHS/OHS risk control measures and workplace procedures for carrying out the work are followed
- 2.2 Need to test or measure live electrical work is determined in accordance with WHS/OHS workplace procedures
- 2.3 Circuits/machines/plants are checked and isolated in accordance with workplace procedures
- 2.4 Emergency lighting systems and associated equipment are installed and maintained to comply with technical industry standards, job specifications and requirements with sufficient access to affect terminations, adjustment and maintenance
- 2.5 Wiring is terminated at apparatus and associated equipment in accordance with manufacturer specifications and functional and regulatory requirements
- 2.6 Methods for dealing with unplanned situations are discussed with appropriate person/s and documented
- 2.7 Unplanned situations are responded to safely and with the approval of authorised person/s
- 2.8 Quality inspections and checks of installed apparatus are undertaken in accordance with workplace procedures
- 2.9 Problems are solved using sustainable energy principles and without damaging apparatus, the surrounding environment or services in accordance with workplace procedures
3 Complete and report installation and maintenance activities
- 3.1 WHS/OHS work completion risk control measures and procedures are followed
- 3.2 Worksite is cleaned and made safe in accordance with workplace procedures
- 3.3 Final checks are made to ensure installed and maintained apparatus conforms to job requirements and specifications
- 3.4 Completed work is documented and appropriate person/s notified in accordance with workplace procedures
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| WC527 | UEENEEG189A | Install and maintain emergency lighting systems | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| ODP04 | UEEEL0076 | Inspect, test and maintain emergency lighting systems | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BFM8 | UEE62220 | Advanced Diploma of Electrical - Engineering | Qualification |
| BFK5 | UEE50420 | Diploma of Electrical Engineering | Qualification |
| BFK9 | UEE63020 | Advanced Diploma of Electrical Systems Engineering | Qualification |
| BFJ2 | UEE42120 | Certificate IV in Electrotechnology - Electrical Contracting | Qualification |
| BFN2 | UEE40620 | Certificate IV in Electrotechnology - Systems Electrician | Qualification |
| BFN0 | UEE30820 | Certificate III in Electrotechnology Electrician | Qualification |
| BFL6 | UEE41020 | Certificate IV in Energy Management and Control | Qualification |