Unit of competency Outline

Date retreived
22/07/2026 9:05 PM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Finish concrete pavements

Finish concrete pavements

Unit of competency
National Code
RIICRC317D
State Code
WH133
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
2.00
Current Release Date
07/12/2014
State Implementation and Classification
Approved Date
27/05/2014
Field of Education
030901 - Construction Engineering
Original Release Date
27/05/2014
Nominal Hours
40
Description
This unit describes a participant’s skills and knowledge required to finish concrete pavements in Civil Construction.This unit is appropriate for those working in operational roles. Licensing, legislative, regulatory and certification requirements that apply to this unit can vary between states, territories and Industry sectors. Relevant information must be sourced prior to application of the unit.
Notes
Elements and Performance Criteria
1. Plan and prepare to finish concrete pavements
  • 1.1 Access, interpret and apply concrete pavement finishing documentation and ensure the work activity is compliant
  • 1.2 Obtain, read, interpret, clarify and confirm work requirements
  • 1.3 Identify and address potential risks, hazards and environmental issues, and implement control measures
  • 1.4 Select and wear correct personal protective equipment appropriate for work activities
  • 1.5 Identify, address and report potential hazards and risks and implement control measures
  • 1.6 Identify, obtain, confirm and implement signage requirements
  • 1.7 Select and check for faults to plant, tools and equipment
  • 1.8 Identify, address and report environmental issues and ground conditions
2. Finish concrete
  • 2.1 Apply float and trowel after initial screeding to assist in maintaining a level surface and to remove screeding inaccuracies
  • 2.2 Apply mechanical trowelling to consolidate and densify the setting concrete surface
  • 2.3 Install control joints, edges finished and concrete trowelled to specifications
  • 2.4 Apply texture according to client requirements
  • 2.5 Apply final trowel finish to concrete surface to specifications
  • 2.6 Monitor movements and hazards and identify and communicate changes to the work environment during the work process
3. Clean up
  • 3.1 Clear work area and dispose of, reuse or recycle material
  • 3.2 Clean, check, maintain and store plant, tools and equipment in accordance with manufacturer recommendations and standard work practices
No information
No information
Replaces
State Code National Code Title Type
WC336 RIICRC317 Finish concrete pavements Unit of competency
Replaced By
State Code National Code Title Type
OCX10 RIICRC317E Finish concrete pavements Unit of competency