Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Select and install roof sheeting and wall cladding
Select and install roof sheeting and wall cladding
Unit of competency
National Code
CPCPRF2022A
CPCPRF2022A
State Code
WF947
WF947
TGA Status
Replaced
Replaced
DTWD Status
Transition (Replaced)
Transition (Replaced)
State Implementation and Classification
Approved Date
20/06/2014
Field of Education
040315 - Roof Fixing
Original Release Date
20/06/2014
Nominal Hours
38
Description
This unit of competency specifies the outcomes required to select and install roof sheeting, steel battens and wall cladding for roofs. It includes the selection and installation of non-metallic roof materials associated with metal roofing (excluding roof tiles and slate) and of insulation materials.
Notes
Elements and Performance Criteria
1 Prepare for work.
- 1.1 Plans and specifications are obtained from site inspection.
- 1.2 Work health and safety (WHS) and environmental requirements selecting and installing roof sheeting and wall cladding are adhered to throughout the work.
- 1.3 Quality assurance requirements are identified and adhered to according to workplace requirements.
- 1.4 Tasks are planned and sequenced in conjunction with others involved in or affected by the work and statutory and regulatory authorities’ requirements.
- 1.5 Tools and equipment, including personal protective equipment, are selected and checked for serviceability.
- 1.6 Work area is prepared to support efficient selection and installation of roof sheeting and wall cladding.
2 Identify insulation requirements.
- 2.1 Level of insulation from rain and other noise, condensation control and heat transfer reduction is determined.
- 2.2 Installationmethod, insulation supports and insulation materials are identified to meet performance requirements, plans, specifications, regulatory authorities' requirements and relevant information.
- 2.3 Quantity and type of insulation materials required are calculated from design drawings and specifications in compliance with local authorities' requirements.
3 Select sheeting, cladding and non-metallic materials.
- 3.1 Appropriate roof sheeting and wall cladding are identified to comply with design specifications.
- 3.2 Quantity and type of manufactured roof coverings and/or fittings required are calculated from design drawings and specifications in compliance with local authorities' requirements.
- 3.3 Manufactured non-metallic roof materials are identified from plans and specifications and verified as compliant with design requirements and regulatory authorities' requirements.
- 3.4 Proposed roof and wall coverings, sealant, non-metallic materials, fixing materials, roofing and catchments are selected and checked for compatibility.
- 3.5 Materials, including insulation, are identified, ordered and collected according to workplace procedures.
- 3.6 Materials and equipment are checked for compliance with docket and order form and for acceptable condition, and faults are reported.
4 Install roof sheeting or wall cladding.
- 4.1 Safety mesh and thermal insulation are fixed according to relevant Australian standards, job specification and manufacturer requirements.
- 4.2 Sheets are marked and trimmed prior to fixing and cut edges are treated according to manufacturer specifications.
- 4.3 Sheets, cladding and non-metallic materials are fixed in compliance with relevant Australian standards and manufacturer specifications.
- 4.4 Sustainability principles and concepts are applied throughout the installation.
5 Clean up.
- 5.1 Work area is cleared and materials disposed of, reused or recycled according to legislation, regulations, codes of practice and job specification.
- 5.2 Tools and equipment are cleaned, checked, maintained and stored according to manufacturer recommendations and workplace procedures.
- 5.3 Documentation is completed according to workplace requirements.
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Work health and safety is to be according to commonwealth, state and territory legislation and regulations and may include:
handling of materials
hazard control
personal protective clothing and equipment prescribed under legislation, regulations and workplace policies and practices
safe operating procedures, including recognising and preventing hazards associated with:
electricity
hazardous materials and substances
service lines
surrounding structures and facilities
trip hazards
use of tools and equipment
work site visitors and the public
working at heights
working in proximity to others
use of firefighting equipment
use of first aid equipment
workplace environment and safety.
Environmental requirements cover water quality management and may include:
clean-up protection
stormwater protection
waste management.
Quality assurance requirements may include:
environment policy
Environment Protection Authority (EPA)
internal company quality assurance policy and risk management strategy
International Standards Organisation
site safety plan
workplace operations and procedures.
Statutory and regulatory authorities include:
commonwealth, state or territory, and local authorities administering applicable Acts, regulations and codes of practice.
Tools and equipment may include:
elevated work platforms
fall protection equipment
hand and power tools
ladders
lifting and load shifting equipment, including:
chain blocks
cranes
forklifts
hand trolleys
hoists and jacks
restricted height scaffolds
rollers
measuring equipment.
Roof sheeting may include:
metal and non-metallic (clear and coloured) sheets
other approved materials.
Installation may include:
fitting safety mesh and rainwater fittings.
Information may include:
charts and hand drawings
instructions issued by authorised organisational or external personnel
manufacturer specifications and instructions
material safety data sheets (MSDS)
memos
organisation work specifications and requirements
plans and sketches
regulatory and legislative requirements, particularly those pertaining to:
building codes
WHS and environmental requirements
plumbing regulations
relevant Australian standards
safe work procedures relating to selecting and installing roof sheeting and wall cladding
signage
verbal, written and graphical instructions
work bulletins
work schedules, plans and specifications.
Insulation materials may include:
batts
interlocking sections
loose fill
rolls.
Materials for selecting and installing roof sheeting and wall cladding may include:
approved roof battens
cappings
fixings and fasteners
flashings
insulation, including:
fibreglass
laminate
polyethylene
reflective foil
straw
wool
insulation supports, including:
plaster board
timber board
wire mesh
metal roof covers of concealed or pierce fixed types
moulds
plastic building sheets for walls and roofs
rain water goods, including:
aluminium
copper
fibreglass
polycarbonate
stainless steel
steel
zincalume
rivets and sealants
self drilling and tapping screws
trims
other approved materials.
Fault reporting:
may be written or verbal
is to be according to company's workplace procedures.
Sustainability principles and concepts:
cover the current and future social, economic and environmental use of resources
may include:
efficient energy use
efficient use and recycling of material
disposing of waste material to ensure minimal environmental impact
selecting appropriate components to ensure minimal environmental impact.
Work health and safety is to be according to commonwealth, state and territory legislation and regulations and may include:
handling of materials
hazard control
personal protective clothing and equipment prescribed under legislation, regulations and workplace policies and practices
safe operating procedures, including recognising and preventing hazards associated with:
electricity
hazardous materials and substances
service lines
surrounding structures and facilities
trip hazards
use of tools and equipment
work site visitors and the public
working at heights
working in proximity to others
use of firefighting equipment
use of first aid equipment
workplace environment and safety.
Environmental requirements cover water quality management and may include:
clean-up protection
stormwater protection
waste management.
Quality assurance requirements may include:
environment policy
Environment Protection Authority (EPA)
internal company quality assurance policy and risk management strategy
International Standards Organisation
site safety plan
workplace operations and procedures.
Statutory and regulatory authorities include:
commonwealth, state or territory, and local authorities administering applicable Acts, regulations and codes of practice.
Tools and equipment may include:
elevated work platforms
fall protection equipment
hand and power tools
ladders
lifting and load shifting equipment, including:
chain blocks
cranes
forklifts
hand trolleys
hoists and jacks
restricted height scaffolds
rollers
measuring equipment.
Roof sheeting may include:
metal and non-metallic (clear and coloured) sheets
other approved materials.
Installation may include:
fitting safety mesh and rainwater fittings.
Information may include:
charts and hand drawings
instructions issued by authorised organisational or external personnel
manufacturer specifications and instructions
material safety data sheets (MSDS)
memos
organisation work specifications and requirements
plans and sketches
regulatory and legislative requirements, particularly those pertaining to:
building codes
WHS and environmental requirements
plumbing regulations
relevant Australian standards
safe work procedures relating to selecting and installing roof sheeting and wall cladding
signage
verbal, written and graphical instructions
work bulletins
work schedules, plans and specifications.
Insulation materials may include:
batts
interlocking sections
loose fill
rolls.
Materials for selecting and installing roof sheeting and wall cladding may include:
approved roof battens
cappings
fixings and fasteners
flashings
insulation, including:
fibreglass
laminate
polyethylene
reflective foil
straw
wool
insulation supports, including:
plaster board
timber board
wire mesh
metal roof covers of concealed or pierce fixed types
moulds
plastic building sheets for walls and roofs
rain water goods, including:
aluminium
copper
fibreglass
polycarbonate
stainless steel
steel
zincalume
rivets and sealants
self drilling and tapping screws
trims
other approved materials.
Fault reporting:
may be written or verbal
is to be according to company's workplace procedures.
Sustainability principles and concepts:
cover the current and future social, economic and environmental use of resources
may include:
efficient energy use
efficient use and recycling of material
disposing of waste material to ensure minimal environmental impact
selecting appropriate components to ensure minimal environmental impact.
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
This unit of competency could be assessed in the workplace or a close simulation of the workplace environment providing that simulated or project-based assessment techniques fully replicate plumbing and services workplace conditions, materials, activities, responsibilities and procedures.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of:
locating, interpreting and applying relevant information, relevant Australian standards and specifications to selecting and installing roof coverings and wall cladding
applying safety requirements throughout the work sequence, including electrical safety requirements and the use of personal protective clothing and equipment
given the plans and specifications, calculating the requirements and selecting and installing roof sheeting, wall cladding and insulation for two roof structures, each roof structure being a minimum of 4 square metres area, one of which incorporates 2 square metres of non-metallic roof sheeting
both installations may include insulation, flashings and cappings, using the pierced and concealed fastening methods, ensuring:
application of sustainability principles and concepts throughout the installation
correct identification of requirements and details of proposed installation
correct fit of the completed installation
correct selection and use of appropriate processes, tools and equipment
completing all work to specification
compliance with regulations, relevant Australian standards and organisational quality procedures and processes
communicating and working effectively and safely with others.
Context of and specific resources for assessment
This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.
Assessment of essential underpinning knowledge will usually be conducted in an off-site context.
Assessment is to comply with relevant regulatory or Australian standards’ requirements.
Resource implications for assessment include:
an induction procedure and requirement
realistic tasks or simulated tasks covering the minimum task requirements
relevant specifications and work instructions
tools and equipment appropriate to applying safe work practices
support materials appropriate to activity
workplace instructions relating to safe working practices and addressing hazards and emergencies
material safety data sheets
research resources, including industry-related systems information.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Method of assessment
Assessment methods must:
satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package
include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
reinforce the integration of employability skills with workplace tasks and job roles
confirm that competency is verified and able to be transferred to other circumstances and environments.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice, with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.
Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
Overview of assessment
This unit of competency could be assessed in the workplace or a close simulation of the workplace environment providing that simulated or project-based assessment techniques fully replicate plumbing and services workplace conditions, materials, activities, responsibilities and procedures.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of:
locating, interpreting and applying relevant information, relevant Australian standards and specifications to selecting and installing roof coverings and wall cladding
applying safety requirements throughout the work sequence, including electrical safety requirements and the use of personal protective clothing and equipment
given the plans and specifications, calculating the requirements and selecting and installing roof sheeting, wall cladding and insulation for two roof structures, each roof structure being a minimum of 4 square metres area, one of which incorporates 2 square metres of non-metallic roof sheeting
both installations may include insulation, flashings and cappings, using the pierced and concealed fastening methods, ensuring:
application of sustainability principles and concepts throughout the installation
correct identification of requirements and details of proposed installation
correct fit of the completed installation
correct selection and use of appropriate processes, tools and equipment
completing all work to specification
compliance with regulations, relevant Australian standards and organisational quality procedures and processes
communicating and working effectively and safely with others.
Context of and specific resources for assessment
This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.
Assessment of essential underpinning knowledge will usually be conducted in an off-site context.
Assessment is to comply with relevant regulatory or Australian standards’ requirements.
Resource implications for assessment include:
an induction procedure and requirement
realistic tasks or simulated tasks covering the minimum task requirements
relevant specifications and work instructions
tools and equipment appropriate to applying safe work practices
support materials appropriate to activity
workplace instructions relating to safe working practices and addressing hazards and emergencies
material safety data sheets
research resources, including industry-related systems information.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Method of assessment
Assessment methods must:
satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package
include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
reinforce the integration of employability skills with workplace tasks and job roles
confirm that competency is verified and able to be transferred to other circumstances and environments.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice, with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.
Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| D7481 | CPCPRF2012A | Select and install roof sheeting and wall cladding | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| OCN08 | CPCPRF2022 | Select and install roof sheeting and wall cladding | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| J485 | CPC20812 | Certificate II in Metal Roofing and Cladding | Qualification |
| J787 | CPC32413 | Certificate III in Plumbing | Qualification |
| J788 | CPC32513 | Certificate III in Plumbing (Mechanical Services) | Qualification |
| J493 | CPC32612 | Certificate III in Roof Plumbing | Qualification |