Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Organise marshalling and shunting operations
Organise marshalling and shunting operations
Unit of competency
National Code
TLIL4038
TLIL4038
State Code
AVI59
AVI59
TGA Status
Current
Current
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
23/02/2016
Field of Education
039907 - Rail Operations
Original Release Date
23/02/2016
Nominal Hours
40
Description
This unit involves the skills and knowledge required to organise marshalling and shunting operations in accordance with workplace procedures and the requirements of relevant safeworking regulations and codes of practice.It includes identifying marshalling and shunting requirements, identifying required rolling stock movements, and planning rolling stock movements in accordance with workplace requirements.People achieving competence in this unit will need to fulfil the applicable state/territory legislated rail safety requirements and to comply with relevant codes of practice and/or guidelines.Work is performed under some supervision, generally within a team environment.It involves the application of routine operational principles and procedures when marshalling and shunting operations across a variety of operational workplace contexts within the Australian rail system.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Identify marshalling and shunting requirements
- 1.1 Track and siding requirements are established based on customer needs and safe work practices
- 1.2 Dangerous goods or other special transportation requirements are established
- 1.3 Destinations, arrival times and departure times are established that are consistent with timetable requirements
- 1.4 Relevant safe working systems are identified
- 1.5 Hazards are identified, risks are assessed and control measures are implemented
2 Identify required rolling stock movements
- 2.1 Rolling stock types required are determined from available documentation
- 2.2 Rolling stock locations are identified, and track and siding availabilities are established to facilitate the marshalling and shunting operation
- 2.3 Rolling stock priorities and sequences are sorted in accordance with workplace procedures
3 Plan rolling stock movements
- 3.1 Marshalling strategy is identified to achieve safe and efficient loading and unloading
- 3.2 Resources required to carry out marshalling strategy are identified
- 3.3 Appropriate motive power is determined to enable completion of shunting operations
- 3.4 Track and siding access and options for wagon movements are identified from marshalling strategy
- 3.5 Contingency strategy is identified or prepared
- 3.6 Shunting and marshalling plan and train consist are documented, filed and distributed in accordance with operational requirements
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| D5223 | TLIL4038A | Organise marshalling and shunting operations | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| AWV7 | TLI42215 | Certificate IV in Rail Network Control | Qualification |
| BHH3 | TLI32821 | Certificate III in Rail Operations | Qualification |
| BGM9 | TLI32820 | Certificate III in Rail Yard Coordination | Qualification |
| AWQ3 | TLI32815 | Certificate III in Rail Yard Coordination | Qualification |
| AWQ8 | TLI42715 | Certificate IV in Tram/Light Rail Control | Qualification |