Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Plan and cost flooring technology work
Plan and cost flooring technology work
Unit of competency
National Code
MSFFL3001
MSFFL3001
State Code
WI359
WI359
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
19/06/2014
Field of Education
040321 - Floor Coverings
Original Release Date
19/06/2014
Nominal Hours
20
Description
This unit of competency covers identifying and analysing work requirements to plan a wide range of flooring work, including identification of all resources, and to cost the work as a part of a tender or quotation.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Identify and analyse work requirements
- 1.1 Applicable work health and safety (WHS), legislative and organisational requirements and Australian Standards relevant to the planning and costing of flooring technology work are verified and complied with
- 1.2 Details of customer requirements are obtained through discussion with customer or from information required
- 1.3 Details of the site conditions are confirmed from reports or physical inspection
- 1.4 Details of products and/or services required for the work are identified, developed and quantified
- 1.5 Delivery point and methods of transportation are determined
- 1.6 Details are recorded in accordance with enterprise practice
2 Develop a work plan
- 2.1 The technical and material options for completing the work are identified and considered
- 2.2 The outline work proposal is confirmed with the client and amended as necessary
- 2.3 A detailed work plan is developed and recorded
3 Estimate materials, time and labour
- 3.1 Types and quantities of materials required for the work plan are calculated
- 3.2 Types and duration of usage of major tools and equipment required to support the work plan are calculated
- 3.3 Labour requirements to support the preparation for and implementation of the work plan are calculated
- 3.4 Time requirements to complete the work plan are estimated
4 Calculate costs
- 4.1 Total materials, labour and equipment costs are calculated in accordance with enterprise procedures
- 4.2 Total job cost is calculated, including overheads and mark-up percentages
- 4.3 Final cost to customer is calculated
5 Document details and verify, where necessary
- 5.1 Details of job costs and charges are documented in accordance with enterprise practice
- 5.2 Calculations, costs or other details are verified in accordance with enterprise practice
- 5.3 Customer quotation is prepared
- 5.4 Details are documented for future reference in accordance with enterprise practice
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| W8524 | LMFFL2001A | Use flooring technology sector hand and power tools | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| OAJ77 | MSFFL3052 | Plan and cost flooring technology work | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| J736 | MSF30813 | Certificate III in Flooring Technology | Qualification |
| J738 | MSF31013 | Certificate III in Interior Decoration Retail Services | Qualification |