Unit of competency Outline
Date retreived
22/07/2026 9:29 PM AWST
22/07/2026 9:29 PM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Carry out high performance concreting
Carry out high performance concreting
Unit of competency
National Code
CPCCCO3050A
CPCCCO3050A
State Code
WI735
WI735
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
20/06/2014
Field of Education
040399 - Building, N.e.c.
Original Release Date
20/06/2014
Nominal Hours
16
Description
This unit of competency specifies the outcomes required to plan, prepare and place high performance concrete onto structures requiring high strength attributes and durability. The unit includes the finish of high performance concrete. It may also include working with others and as a member of a team.
Notes
Elements and Performance Criteria
1 Plan and prepare.
- 1.1 Work instructions, work health and safety (WHS) requirements and other information relevant to the work are identified, confirmed and applied for planning and preparation purposes.
- 1.2 Plant, tools and equipment consistent with job requirements are selected and checked for serviceability, and faults are rectified and reported before work begins.
- 1.3 Material quantity requirements are identified and calculated according to plans, specifications and quality requirements.
- 1.4 Materials appropriate to the work application are obtained, prepared, safely handled and located ready for use.
- 1.5 Environmental requirements are identified for the project according to environmental plans and regulatory requirements.
2 Place high performance concrete.
- 2.1 Concrete tests for each specified performance property are performed according to specifications and associated testing standards.
- 2.2 Once transported, high performance concrete is discharged correctly into formwork, using correct mechanical or manual handling techniques and processes.
- 2.3 High performance concrete is placed by technique nominated in specifications to ensure timely placement and to avoid material segregation.
- 2.4 High performance concrete is compacted/vibrated and screeded to the nominated criteria into designated formwork according to specifications and supporting drawings.
- 2.5 High performance concrete is finished to specified thickness and height.
- 2.6 High performance concrete curing regime is applied as per specifications to include a selection of curing methods, which are then documented.
- 2.7 Concrete is protected from damage and pollution during construction using a plastic membrane.
3 Clean up.
- 3.1 Work area is cleared and materials disposed of, reused or recycled according to regulations, codes of practice and job specification.
- 3.2 Plant, tools and equipment are cleaned, checked, maintained and stored according to manufacturer recommendations and standard work practices.
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Work health and safety requirements must comply with state and territory legislation and regulations and project safety plan, and may include:
assistance of others or the use of manual or mechanical lifting devices with handling activities where size, weight or other issues, such as disability, are a factor
emergency procedures, including extinguishing fires, organisational first aid requirements, and evacuation procedures
hazard control
hazardous materials and substances
personal protective equipment (PPE) prescribed under legislation, regulations and workplace policies and practices
safe operating procedures, including the conduct of operational risk assessment and treatments associated with:
earth leakage boxes
lighting
power cables, including overhead service trays, cables and conduits
restricted access barriers
surrounding structures
traffic control
trip hazards
work site visitors and the public
working at heights
working in confined spaces
working in proximity to others
working outdoors in warm climates
use of firefighting equipment
use of tools and equipment
workplace environmental requirements and safety.
Information may include:
instructions issued by authorised organisational and external personnel
memos
regulatory and legislative requirements relating to carrying out high performance concreting, including relevant Australian standards
safe work procedures relating to carrying out high performance concreting
safety data sheets
signage
verbal, written and diagrammatical instructions, including manufacturer specifications and instructions where specified
work bulletins
work schedules, plans and specifications.
Planning and preparation must include:
assessing conditions and hazards
determining work requirements and safety plans and procedures
identifying and rectifying equipment defects
inspecting work sites.
Tools and equipment:
must include:
bull floats
composite floats
immersion vibrators
magnesium floats
power floats
rakes
screed boards
shovels
steel trowels
vibrating screeds
may include:
bolt cutters
brooms
concrete kibbles
curing compounds applicators
edging tools
measuring tapes
nips
tarpaulins and covers
tremmies
wheelbarrows
wooden floats.
Quality requirements must include:
internal organisational quality policy and standards
manufacturer specifications where specified
relevant regulations and Australian standards
workplace operations and procedures.
Materials:
must include high performance concrete
may include:
curing compounds
a range of specialist additives.
Environmental requirements may include:
clean-up management
dust and noise control
vibration management
waste management.
High performance concrete includes the following applications:
airport runways
bridges
columns
cooling towers
dams
foundation supports for high rise facilities
foundations
gutters
hardstands
kerbs
pathways
pits
plinths
roadways
slabs
stairs
tunnels
walls.
Concrete placing methods may include:
kibble
pumping equipment
shovelling
tremmies
truck-placed
vibrating
wheelbarrows.
Screeding:
must include a hand screed
may include:
a mechanical vibrating screed
magic screeds.
Finishing techniques may include:
broom finished
brushed
bull float
mechanical trowelling machine
steel trowel
wood float.
Work health and safety requirements must comply with state and territory legislation and regulations and project safety plan, and may include:
assistance of others or the use of manual or mechanical lifting devices with handling activities where size, weight or other issues, such as disability, are a factor
emergency procedures, including extinguishing fires, organisational first aid requirements, and evacuation procedures
hazard control
hazardous materials and substances
personal protective equipment (PPE) prescribed under legislation, regulations and workplace policies and practices
safe operating procedures, including the conduct of operational risk assessment and treatments associated with:
earth leakage boxes
lighting
power cables, including overhead service trays, cables and conduits
restricted access barriers
surrounding structures
traffic control
trip hazards
work site visitors and the public
working at heights
working in confined spaces
working in proximity to others
working outdoors in warm climates
use of firefighting equipment
use of tools and equipment
workplace environmental requirements and safety.
Information may include:
instructions issued by authorised organisational and external personnel
memos
regulatory and legislative requirements relating to carrying out high performance concreting, including relevant Australian standards
safe work procedures relating to carrying out high performance concreting
safety data sheets
signage
verbal, written and diagrammatical instructions, including manufacturer specifications and instructions where specified
work bulletins
work schedules, plans and specifications.
Planning and preparation must include:
assessing conditions and hazards
determining work requirements and safety plans and procedures
identifying and rectifying equipment defects
inspecting work sites.
Tools and equipment:
must include:
bull floats
composite floats
immersion vibrators
magnesium floats
power floats
rakes
screed boards
shovels
steel trowels
vibrating screeds
may include:
bolt cutters
brooms
concrete kibbles
curing compounds applicators
edging tools
measuring tapes
nips
tarpaulins and covers
tremmies
wheelbarrows
wooden floats.
Quality requirements must include:
internal organisational quality policy and standards
manufacturer specifications where specified
relevant regulations and Australian standards
workplace operations and procedures.
Materials:
must include high performance concrete
may include:
curing compounds
a range of specialist additives.
Environmental requirements may include:
clean-up management
dust and noise control
vibration management
waste management.
High performance concrete includes the following applications:
airport runways
bridges
columns
cooling towers
dams
foundation supports for high rise facilities
foundations
gutters
hardstands
kerbs
pathways
pits
plinths
roadways
slabs
stairs
tunnels
walls.
Concrete placing methods may include:
kibble
pumping equipment
shovelling
tremmies
truck-placed
vibrating
wheelbarrows.
Screeding:
must include a hand screed
may include:
a mechanical vibrating screed
magic screeds.
Finishing techniques may include:
broom finished
brushed
bull float
mechanical trowelling machine
steel trowel
wood float.
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
This unit of competency could be assessed by undertaking a range of tasks in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person should demonstrate the ability to:
complete planning, preparation, placement, finishing and curing of 10 square metres of high performance concrete to engineer’s specifications
locate, interpret and apply relevant information, standards and specifications relating to carrying out high performance concreting
comply with site safety plans and procedures
comply with organisational policies and procedures relating to carrying out high performance concreting while maintaining quality requirements outlined in job specifications
safely and effectively operate and use plant, tools and equipment required to carry out high performance concreting
communicate and work effectively and safely with others.
Context of and specific resources for assessment
Assessment of this unit:
must be in the context of the work environment
may be conducted in an off-site context, provided it is realistic and sufficiently rigorous to cover all aspects of workplace performance, including task skills, task management skills, contingency management skills and job role environment skills
must meet relevant compliance requirements.
Resource implications for assessment include:
an induction procedure
realistic tasks or simulated tasks covering the mandatory task requirements
tools and equipment appropriate to applying safe work practices
support materials appropriate to activity
workplace instructions relating to safe work practices and addressing hazards and emergencies
research resources and industry-related systems information
safety data sheets.
Method of assessment
Assessment for this unit must verify the practical application of the required skills and knowledge, using a combination of the following methods:
direct observation of tasks in real or simulated work conditions
questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
review of relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
Guidance information for assessment
This unit could be assessed on its own or in combination with other units relevant to the job function.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Assessment processes and techniques should, as far as is practical, take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Overview of assessment
This unit of competency could be assessed by undertaking a range of tasks in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person should demonstrate the ability to:
complete planning, preparation, placement, finishing and curing of 10 square metres of high performance concrete to engineer’s specifications
locate, interpret and apply relevant information, standards and specifications relating to carrying out high performance concreting
comply with site safety plans and procedures
comply with organisational policies and procedures relating to carrying out high performance concreting while maintaining quality requirements outlined in job specifications
safely and effectively operate and use plant, tools and equipment required to carry out high performance concreting
communicate and work effectively and safely with others.
Context of and specific resources for assessment
Assessment of this unit:
must be in the context of the work environment
may be conducted in an off-site context, provided it is realistic and sufficiently rigorous to cover all aspects of workplace performance, including task skills, task management skills, contingency management skills and job role environment skills
must meet relevant compliance requirements.
Resource implications for assessment include:
an induction procedure
realistic tasks or simulated tasks covering the mandatory task requirements
tools and equipment appropriate to applying safe work practices
support materials appropriate to activity
workplace instructions relating to safe work practices and addressing hazards and emergencies
research resources and industry-related systems information
safety data sheets.
Method of assessment
Assessment for this unit must verify the practical application of the required skills and knowledge, using a combination of the following methods:
direct observation of tasks in real or simulated work conditions
questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
review of relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
Guidance information for assessment
This unit could be assessed on its own or in combination with other units relevant to the job function.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Assessment processes and techniques should, as far as is practical, take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| D7368 | CPCCCO3030A | Carry out high performance concreting | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| OAP16 | CPCCCO3050 | Carry out high performance concreting | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| J784 | CPC30313 | Certificate III in Concreting | Qualification |