Unit of competency Outline
Date retreived
22/07/2026 5:08 PM AWST
22/07/2026 5:08 PM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Produce technical drawings
Produce technical drawings
Unit of competency
National Code
CUAACD313
CUAACD313
State Code
ODF74
ODF74
TGA Status
Current
Current
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
26/11/2021
Field of Education
100501 - Graphic Arts And Design Studies
Original Release Date
26/11/2021
Nominal Hours
70
Description
This unit describes the skills and knowledge required to apply different techniques to produce technical drawings that meet required standards and conventions. It involves planning and preparing for technical drawing activities, creating technical drawings and finalising them according to project requirements.The unit applies to those who use technical drawings in different contexts to meet project requirementsNo licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1. Plan and prepare for technical drawing work
- 1.1 Identify drawing requirements with reference to project documentation in consultation with required personnel
- 1.2 Identify factors that may impact on technical drawing work
- 1.3 Select techniques to fit the purpose of drawings
- 1.4 Prepare equipment and materials according to workplace procedures and safety requirements
2. Create technical drawings
- 2.1 Produce and review preliminary drawings according to drawing requirements
- 2.2 Apply applicable conventions and standards to technical drawings
- 2.3 Discuss drawings with required personnel and confirm required amendments
- 2.4 Amend drawings according to drawing requirements
3. Finalise technical drawings
- 3.1 Check drawings against project objectives and drawing requirements according to organisational procedures
- 3.2 Finalise and submit technical drawings within agreed timeframes
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| AWK33 | CUAACD303 | Produce technical drawings | Unit of competency |