Unit of competency Outline
Date retreived
22/07/2026 11:28 PM AWST
22/07/2026 11:28 PM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Respond to discrete and interdependent protection operations
Respond to discrete and interdependent protection operations
Unit of competency
National Code
UETTDRSO48
UETTDRSO48
State Code
OBG75
OBG75
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
04/12/2019
Field of Education
031301 - Electrical Engineering
Original Release Date
04/12/2019
Nominal Hours
135
Description
This unit covers the coordination of response to discrete and interdependent protection operations due to system faults.The application of the skills and knowledge described in this unit may require a licence/registration to practice in the workplace subject to regulations for undertaking of electrical work. Other conditions may apply under state and territory legislative and regulatory licencing requirements which must be confirmed prior to commencing this unit.
Notes
Elements and Performance Criteria
1 Plan response to discrete/interdependent protection operations
- 1.1 Work health and safety (WHS)/occupational health and safety (OHS) practices/procedures and environmental and sustainable energy procedures, which may influence the preparation of the switching program, are reviewed and determined
- 1.2 Purpose of the response is established after data is analysed and expected outcomes of the work are confirmed with appropriate personnel
- 1.3 Established policies, procedures and specifications for the response are obtained or established with appropriate personnel
- 1.4 Response to discrete/interdependent protection operations are discussed with and/or directed to appropriate personnel in order to ascertain the scope of the work/testing required
- 1.5 Testing parameters are ascertained from established policies, procedures and specifications
- 1.6 Equipment/tools and personal protective equipment (PPE) are selected based on specified performance criteria and established procedures
- 1.7 Work roles and tasks are allocated according to requirements and individual competencies
- 1.8 Work is prioritised and sequenced for the most efficient/effective outcome, completed within an acceptable timeframe, to a quality standard and in accordance with established procedures
- 1.9 Liaison and communication issues with others/authorised personnel, authorities and clients are resolved and activities coordinated to carry out work
- 1.10 Risk control measures are identified, prioritised and evaluated against the work schedule
- 1.11 Need for relevant work permits is identified to coordinate the performance of work according to requirements and/or established procedures
- 1.12 Circuit/systems modelling is used to evaluate alternative proposals in accordance with established procedures
- 1.13 Strategic plans are developed incorporating organisational initiatives in accordance with established procedures
2 Carry out response to discrete/interdependent protection operations
- 2.1 WHS/OHS and sustainable energy principles, functionality and practices to reduce the incidents of accidents and minimise waste are incorporated into the project in accordance with requirements and/or established procedures
- 2.2 Decisions concerning the response to protection operations are made on the basis of safety and effective outcomes according to requirements and/or established procedures
- 2.3 Stakeholders/customers are kept informed of current status regarding plan progress and recent developments
- 2.4 Technical advice is given regarding potential hazards, safety risks and control measures so that monitoring and preventative action can be undertaken and/or appropriate authorities consulted, where necessary, in accordance with requirements and established procedures
- 2.5 Essential knowledge and associated skills are applied to analyse specific data and compare it with compliance specifications to ensure completion of the work within an agreed timeframe according to requirements
- 2.6 Testing of the decision to be implemented is undertaken according to requirements and established procedures
- 2.7 Work teams/groups are arranged/coordinated/evaluated to ensure planned goals are met according to established procedures
- 2.8 Solutions to non-routine problems are identified and actioned, using acquired essential knowledge and associated skills, according to requirements
- 2.9 Quality of work is monitored against personal performance agreement and/or established organisational and professional standards
3 Complete the response to discrete/interdependent protection operations
- 3.1 Final review of the switching program is undertaken to ensure it complies with all requirements and includes all specifications and documentations needed to complete the work
- 3.2 Appropriate personnel are notified of completion and reports and/or completion documents (electronic/paper) are finalised/commissioned
- 3.3 Reports and/or completion documents (electronic/paper) are submitted to relevant personnel/organisations for approval and, where applicable, statutory or regulatory approval
- 3.4 Approved copies of switching program documents (electronic/paper) are issued and records are updated in accordance with established procedures
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| WD765 | UETTDRSO48A | Respond to discrete and interdependent protection operations | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| ODN64 | UETDRSO011 | Respond to discrete and interdependent protection operations | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BEW7 | UET60219 | Advanced Diploma of ESI - Power Systems | Qualification |
| BEW6 | UET50219 | Diploma of ESI - Power Systems | Qualification |
| BEW1 | UET50319 | Diploma of ESI - Power Systems Operations | Qualification |
| BEV7 | UET60319 | Advanced Diploma of ESI - Power Systems Operations | Qualification |