Unit of competency Outline

Date retreived
23/07/2026 2:00 AM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Perform field support duties in concrete construction

Perform field support duties in concrete construction

Unit of competency
National Code
LGAWORK210A
State Code
C5851
TGA Status
Deleted
DTWD Status
Deleted
Current Release Number
2.00
Current Release Date
11/09/2012
State Implementation and Classification
Approved Date
30/06/2011
Field of Education
040399 - Building, N.e.c.
Original Release Date
30/06/2011
Nominal Hours
20
Description
This unit covers providing support activity in the construction of concrete works.
Notes
Elements and Performance Criteria
1 Establish facilities for concrete construction
  • 1.1 Work is planned and programmed to be undertaken in accordance with drawings, specifications and other documentation.
  • 1.2 Work site is prepared and maintained in a safe condition in accordance with the occupational health and safety requirements (OHS) and regulations of other accredited authorities.
  • 1.3 Traffic control is signed in accordance with relevant Australian standards.
  • 1.4 Underground and overhead obstructions and other utility services are identified.
  • 1.5 Environmental protection devices are installed as required to meet environmental regulations.
2 Carry out basic concreting operations
  • 2.1 Aggregates and cement are handled to maintain quality of materials.
  • 2.2 Concrete components are mixed and batched to achieve specified requirements.
  • 2.3 Correct concreting tools and equipment are selected for specific operators to achieve the specified finish.
  • 2.4 Concrete is transported, placed and finished.
  • 2.5 Correct materials for expansion joints and installation are selected in accordance with the manufacturers' instructions and/or drawings.
  • 2.6 Pre-cast sections are installed in accordance with specifications.
3 Select and install steel reinforcing when required
  • 3.1 Correct reinforcement is selected and installed when required or as shown in the drawings.
4 Set up formwork and falsework when required
  • 4.1 Materials for formwork and falsework are selected.
  • 4.2 Approved procedures and methods for erection and dismantling of falsework are followed.
  • 4.3 Approved procedures and methods for erection and dismantling of formwork are followed.
5 Maintain records of concrete structures
  • 5.1 Information is recorded in accordance with council and legislative requirements.
  • 5.2 Details are recorded clearly, accurately and legibly.
  • 5.3 Records are secured, accessible and up to date.
The Range Statement relates to the Unit of Competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording in the Performance Criteria is detailed below.
Relevant standards may include:
Australian standards, codes of practice and other relevant standards associated with concrete construction

Types of construction materials may include:
reinforcing steel
steel mesh
timber
ply boards
geofabrics
cement
pre-cast concrete components
ready-mix concrete
concrete
mortars
Formwork and falsework may include:
timber
steel
ply boards
scaffolding and fittings
propriety steel and timber forms
falsework foundations
form sealant and oils
boxing
slip form
Concrete structures may include:
kerb and channel (pre-cast or cast in situ)
concrete slabs
concrete foundations
retaining walls
manholes (pre-cast or cast in situ)
gully inlets
footpaths
bikeways
Concrete may include:
basket box
wheelbarrow
concrete mixer
pumping
crane kibble
boom
hand screeds
wooden floats
aluminium floats
edging tools
Records may include:
test reports
job diaries
instructions
correspondence
time sheets
accident reports
costing sheets
Overview of assessment requirements
A person who demonstrates competency in this unit will be able to perform the outcomes described in the Elements to the required performance level detailed in the Performance Criteria. The knowledge and skill requirements described in the Range Statement must also be demonstrated. For example, knowledge of the legislative framework and safe work practices that underpin the performance of the unit must be demonstrated.
Critical aspects of evidence to be considered
Appropriate materials, construction methods and processes are used in the construction and maintenance of concrete structures.
Plans and specifications are adhered to.
Safety on work sites is ensured.
Australian standards, codes of practice and advisory standards are met.
Context of assessment
May be assessed:
on the job
simulated workplace environment
written assignment
short-answer test
oral questioning
observation
or any combination of the above
Relationship to other units(prerequisite or co-requisite units)
To enable holistic assessment this unit may be assessed with other units that form part of the job role.
Method of assessment
The following assessment methods are suggested:
observation of the learner performing a range of workplace tasks over sufficient time to demonstrate handling of a range of contingencies
written and/or oral questioning to assess knowledge and understanding
completion of workplace documentation
third-party reports from experienced practitioners
completion of self-paced learning materials including personal reflection and feedback from trainer, coach or supervisor
Evidence required for demonstration of consistent performance
Evidence will need to be gathered over time across a range of variables.
Resource implications
In accordance with a range of variable requirements.
No information
State Code National Code Title Type
C747 LGA20204 Certificate II in Local Government (Operational Works) Qualification