Unit of competency Outline

Date retreived
22/07/2026 11:41 PM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Manage energy efficient building methods and strategies

Manage energy efficient building methods and strategies

Unit of competency
National Code
CPCSUS5003A
State Code
WI780
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
17/01/2014
State Implementation and Classification
Approved Date
20/06/2014
Field of Education
030905 - Building Services Engineering
Original Release Date
20/06/2014
Nominal Hours
60
Description
This unit of competency specifies the outcomes required to ensure that energy efficient building methods and strategies are supported by employees and contractors working on a new or existing residential or commercial building designed to satisfy energy efficiency ratings and requirements. The unit provides the skills required to ensure that work undertaken to construct an energy efficient building or to retrofit an existing building for improved energy efficiency is performed as designed and reflects energy efficient specifications.The unit covers developing a culture of energy efficient work practices.
Notes
Elements and Performance Criteria
1 Plan and prepare to construct an energy efficient building.
  • 1.1 Relevant stakeholders are consulted to identify the purpose for which the building is to be used and the energy efficiency expectations of its owners or occupiers.
  • 1.2 Plans, drawings and specifications are reviewed to identify energy efficient requirements of finished building or works.
  • 1.3 Project is resourced with appropriately skilled tradespeople with energy efficiency competency.
  • 1.4 Works to be undertaken are scheduled to support energy efficient building strategy.
  • 1.5 Construction materials and products are costed, selected and sourced to conform to and meet energy efficiency expectations of the building or works.
  • 1.6 Strategies for the disposal or reuse of waste materials are developed for the project.
  • 1.7 Impact of energy efficient project on timelines and budget is communicated to owner or occupier and other stakeholders.
2 Communicate and monitor energy efficiency awareness among tradespeople.
  • 2.1 Trades and other works on the building project are briefed with expectations for techniques to be used, quality of works to be undertaken, and energy efficiency outcomes required.
  • 2.2 Sealing of building envelope is assessed for capacity to maximise energy efficiency and improvements are made in sealing the building envelope before other works continue.
  • 2.3 Requirements to maintain energy efficient techniques are communicated to subsequent trades to ensure benefits of the work are not lost.
  • 2.4 Alterations to works, construction methods and selected materials are evaluated against project energy efficiency expectations, and impact on energy efficiency is quantified to assist in decision-making processes.
3 Evaluate and communicate energy efficiency outcomes.
  • 3.1 Works undertaken are assessed for adherence to energy efficiency processes.
  • 3.2 Hand held thermal imaging assessment of building or works is conducted to determine presence of unwanted heat and air leakages, and findings are addressed where necessary.
  • 3.3 Duct testing is conducted where appropriate to identify location of leakages and works are implemented to address findings where necessary.
  • 3.4 External rating of energy efficiency, including star ratings, is sought from recognised expert to verify efficiency of construction.
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Relevant stakeholders mayinclude:
architects
builders
building owners or investors
designers
developers
engineers
facility managers
occupants.
Construction materials and products mayinclude:
cladding
floors
framing
heating, ventilation and air conditioning (HVAC) systems
insulation
interior and exterior paints
interior and exterior wall materials
lights and lighting systems
plaster
roof materials
types and uses of water tanks and recyclable grey water systems
windows.
Techniques to be used to support energy efficiency may include:
protecting the air barrier by minimising and sealing gaps using advanced framing techniques to increase construction productivity, reduce thermal bridging and increase operational energy efficiency
installing insulation on the outside of the frame and in the roof, walls and floor
reducing the effect of thermal bridging
selecting appropriately sized HVAC system, which considers the tightness of the structure and incorporates heat or energy recovery systems as appropriate for ventilation
using air or vapour barriers to ensure the entire building envelope is sealed, separating the inside environment from the outside
using thicker insulation to improve the building’s thermal performance.
Evaluated may involve:
occupier
owner or developer
relevant trades.
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
This unit of competency could be assessed by performing a range of tasks in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person should demonstrate the ability to:
implement energy efficient building methods and management strategies for two building and construction projects, including:
resourcing the project with appropriately skilled tradespeople competent in energy efficient works
using energy efficient products and materials aligned with the energy efficient aims for the building envelope
clearly communicating to trades and other relevant stakeholders the energy efficiency techniques and strategies to be used in order to achieve building energy expectations
conducting appropriate performance testing of the construction to determine adherence to energy efficiency methodologies and techniques
locate, interpret and apply relevant energy efficiency related compliance requirements applicable to the building and construction projects
locate, interpret and monitor the application of relevant work health and safety (WHS) legislation, regulations and codes of practice applicable to the work site
comply with organisational policies and procedures relating to managing energy efficiency building methods and strategies, including standards.
Context of and specific resources for assessment
Assessment of this unit:
must be in the context of the work environment
may be conducted in an off-site context, provided it is realistic and sufficiently rigorous to cover all aspects of workplace performance, including task skills, task management skills, contingency management skills and job role environment skills
must meet relevant compliance requirements.
Resource implications for assessment include:
an induction procedure
realistic tasks or simulated tasks covering the mandatory task requirements
relevant specifications and work instructions
tools and equipment appropriate to applying safe work practices
support materials appropriate to activity
workplace instructions relating to safe work practices and addressing hazards and emergencies
research resources, including industry-related systems information
safety data sheets.
Method of assessment
Assessment for this unit must verify the practical application of the required skills and knowledge, using one or more of the following methods:
direct observation of tasks in real or simulated work conditions
questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
review of relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
Guidance information for assessment
This unit could be assessed on its own or in combination with other units relevant to the job function.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Assessment processes and techniques should, as far as is practical, take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Replaced By
State Code National Code Title Type
OCM03 CPCSUS5003 Manage energy efficient building methods and strategies Unit of competency