Unit of competency Outline

Date retreived
22/07/2026 1:15 PM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Install transmission structures and associated hardware

Install transmission structures and associated hardware

Unit of competency
National Code
UETTDRTP26
State Code
OBG67
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
25/09/2019
State Implementation and Classification
Approved Date
04/12/2019
Field of Education
031311 - Powerline Installation And Maintenance
Original Release Date
04/12/2019
Nominal Hours
54
Description
This unit involves the skills and knowledge required to install transmission structures and associated hardware in the electricity supply industry (ESI).It includes preparing to install and installing transmission structures, and associated hardware in accordance with construction plans, drawings and workplace procedures. It also includes updating system data, records and completing relevant documentation.The application of the skills and knowledge described in this unit may require a licence/registration to practice in the workplace.Other conditions may apply under State and Territory legislative and regulatory licensing requirement which must be confirmed prior to commencing this unit.
Notes
Elements and Performance Criteria
1 Prepare to install transmission structures and associated hardware
  • 1.1 Works schedule, construction plans, drawings, workplace procedures and material lists are received and confirmed
  • 1.2 Job requirements and workplace procedures are identified and communicated with relevant personnel
  • 1.3 Work health and safety (WHS)/occupational health and safety (OHS), environmental and workplace procedures for erecting towers and associated hardware are obtained and confirmed for the purposes of the work to be performed
  • 1.4 Work is prioritised and sequenced for completion within acceptable timeframes following consultation with relevant personnel and in accordance with workplace procedures
  • 1.5 Hazards are identified, WHS/OHS risks are assessed and control measures identified in accordance with workplace procedures
  • 1.6 Relevant work permits are confirmed and signed in accordance with workplace procedures
  • 1.7 Plant, equipment, tools and personal protective equipment (PPE) required for work are identified, obtained and confirmed in working order
  • 1.8 Worksite is prepared to minimise risk, damage to property, commerce and individuals in accordance with workplace procedures
  • 1.9 Traffic management plan is confirmed as being applied in accordance with workplace procedures
2 Carry out the erection of transmission towers and associated hardware
  • 2.1 WHS/OHS, sustainable energy and environmental principles and practices are monitored and followed to reduce incidents in accordance with workplace procedures
  • 2.2 Requirements for lifting and/or climbing and/or working at heights and the use of power tools/equipment are followed in accordance with workplace procedures
  • 2.3 Transmission structures and associated hardware are assembled at ground level and erected in accordance with construction plans, drawings and workplace procedures
  • 2.4 Structure is stabilised in accordance with construction plans, drawings and workplace procedures
  • 2.5 Unplanned events are responded to in accordance with workplace procedures
  • 2.6 Quality checks of work are undertaken in accordance with workplace procedures
3 Complete installation of transmission structures and associated hardware
  • 3.1 Completed work is checked against work schedule, construction plans and drawings for compliance and anomalies are reported in accordance with workplace procedures
  • 3.2 WHS/OHS and environmental incidents are reported in accordance with workplace procedures, as required
  • 3.3 Worksite is rehabilitated, cleaned up and made safe in accordance with workplace procedures
  • 3.4 Tools, equipment and surplus resources and materials are, where appropriate, cleaned, checked and returned to storage in accordance with workplace procedures
  • 3.5 Relevant work permits are signed off and towers and associated hardware are returned to service in accordance with workplace procedures
  • 3.6 Work records, reports and/or documentation are completed in accordance with workplace procedures
No information
No information
Replaces
State Code National Code Title Type
WD773 UETTDRTP26A Install transmission structures and associated hardware Unit of competency
Replaced By
State Code National Code Title Type
ODN71 UETDRTO007 Install and maintain transmission structures and hardware Unit of competency