Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Set out, install and commission irrigation systems

Set out, install and commission irrigation systems

Unit of competency
National Code
CPCPIG3021
State Code
OCN73
TGA Status
Current
DTWD Status
Approved
Current Release Number
1.00
Current Release Date
27/11/2020
State Implementation and Classification
Approved Date
01/06/2021
Field of Education
040327 - Plumbing
Original Release Date
01/06/2021
Nominal Hours
8
Description
This unit specifies the skills and knowledge required to set out, install and commission irrigation systems.In some jurisdictions, this unit of competency may form part of accreditation, licensing, legislative, regulatory or certification requirements.
Notes
Elements and Performance Criteria
1 Prepare for work.
  • 1.1 Obtain plans and specifications.
  • 1.2 Adhere to work health and safety (WHS) and environmental requirements associated with setting out, installing and commissioning irrigation systems throughout work.
  • 1.3 Identify and adhere to quality assurance requirements according to workplace requirements.
  • 1.4 Plan and sequence tasks in conjunction with others involved in or affected by the work and statutory and regulatory authorities’ requirements.
  • 1.5 Select and check tools and equipment, including personal protective equipment (PPE), for setting out, installing and commissioning irrigation systems for serviceability.
  • 1.6 Prepare work area to support efficient setting out, installation and commissioning of irrigation systems.
2 Identify installation requirements.
  • 2.1 Identify irrigation system requirements from plans, specifications and relevant information.
  • 2.2 Locate and identify underground services.
  • 2.3 Check flow rate and water pressure for compliance with plans and specifications.
  • 2.4 Select piping and system components to comply with standards, plans and specifications.
  • 2.5 Identify, order and collect materials and equipment according to workplace procedures.
  • 2.6 Check materials and equipment for compliance with standards, docket and order form, and for acceptable condition.
3 Install and commission irrigation system.
  • 3.1 Set out irrigation pipes according to plans, specifications and site requirements.
  • 3.2 Excavate pipe trenches according to plans and specifications.
  • 3.3 Install pipe system according to plans, specifications, site requirements, manufacturer recommendations and standards, and sustainability principles and concepts.
  • 3.4 Flush pipelines of air and foreign matter to installation standard.
  • 3.5 Install backflow prevention device according to standards.
  • 3.6 Install and adjust water emitters to produce required spray pattern.
  • 3.7 Install, operate and adjust control valves to achieve specified flow rate.
  • 3.8 Test and adjust installation to comply with standards and authorities' requirements.
  • 3.9 Backfill trenches according to plans and specifications and reinstate ground surface.
4 Clean up.
  • 4.1 Clear work area and dispose of reused or recycled materials according to legislation, regulations, codes of practice and job specification.
  • 4.2 Clean, check, maintain and store tools and equipment according to manufacturer recommendations and workplace procedures.
  • 4.3 Complete documentation according to workplace requirements.
No information
No information
Replaces
State Code National Code Title Type
WF911 CPCPIG3021A Set out, install and commission irrigation systems Unit of competency
State Code National Code Title Type
BGC2 CPC32420 Certificate III in Plumbing Qualification