Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Undertake concreting work on concrete bridges
Undertake concreting work on concrete bridges
Unit of competency
National Code
RIICBM306D
RIICBM306D
State Code
WH044
WH044
TGA Status
Replaced
Replaced
DTWD Status
Transition (Replaced)
Transition (Replaced)
State Implementation and Classification
Approved Date
27/05/2014
Field of Education
040399 - Building, N.e.c.
Original Release Date
27/05/2014
Nominal Hours
68
Description
This unit describes a participant’s skills and knowledge required to apply Undertake concreting work on concrete bridges in Civil Construction.This unit is appropriate for those working in operational roles.Licensing, legislative, regulatory and certification requirements that apply to this unit can vary between states, territories, and Industry sectors. Relevant information must be sourced prior to application of the unit.
Notes
Elements and Performance Criteria
1. Plan and prepare
- 1.1 Access, interpret and apply documentation to undertake concreting work on concrete bridges and ensure the work activity is compliant
- 1.2 Obtain, interpret, clarify and confirm work instructions before proceeding
- 1.3 Confirm and apply environmental protection and safety requirements
- 1.4 Obtain, interpret and implement traffic management signage requirements
- 1.5 Select and check for faults plant, tools and equipment to carry out tasks
- 1.6 Identify, address and report hazards, risks and environmental issues
- 1.7 Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency
2. Place concrete
- 2.1 Identify and confirm location and design of concrete work
- 2.2 Remove debris and waste from pour area
- 2.3 Apply release agent
- 2.4 Pour concrete in horizontal layers into location to levels as indicated by markers, level pegs or lines
- 2.5 Implement methods to avoid segregation
- 2.6 Consolidate poured concrete during process using approved compaction or vibration methods
3. Finish concrete
- 3.1 Screed concrete to correct levels and/or grades using appropriate straight edged tool or formwork mounted screeds
- 3.2 Float screeded concrete surface
- 3.3 Define control/structural joints and finish edges
- 3.4 Finish concrete surface
4. Cure concrete
- 4.1 Maintain curing agent/method on concrete surface
- 4.2 Isolate and/or barricade the area to protect concrete during curing process
5. Clean up
- 5.1 Clear work area and dispose of or recycle materials
- 5.2 Clean, check, maintain and store plant, tools and equipment
No information
No information
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| OCX73 | RIICBM306E | Undertake concreting work on concrete bridges | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BFA8 | RII30919 | Certificate III in Civil Construction | Qualification |
| AZB0 | RII30915 | Certificate III in Civil Construction | Qualification |