Unit of competency Outline

Date retreived
23/07/2026 2:36 AM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Optimise timber production for volume and value recovery

Optimise timber production for volume and value recovery

Unit of competency
National Code
FWPSAW4207
State Code
OBM04
TGA Status
Current
DTWD Status
Approved
Current Release Number
1.00
Current Release Date
31/01/2020
State Implementation and Classification
Approved Date
29/05/2020
Field of Education
030305 - Materials Engineering
Original Release Date
29/05/2020
Nominal Hours
55
Description
This unit of competency describes the skills and knowledge required to optimise the volume and value of sawn timber based on analysis of timber characteristics, machine capability and product demand. The unit applies to individuals who optimise timber production for volume and value recovery in a timber sawmill.All work must be carried out to comply with workplace procedures, according to state/territory health and safety regulations, legislation and standards that apply to the workplace.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1. Prepare to optimise timber production
  • 1.1 Review work order to determine job requirements and, where required, seek clarification from appropriate personnel
  • 1.2 Review workplace health and safety procedures, including the use of personal protective equipment, equipment lock-out and safe manual handling techniques
  • 1.3 Identify, assess and take actions to mitigate risks and hazards associated with optimising timber production
  • 1.4 Identify workplace environmental protection procedures for minimising and disposing of waste material, cleaning tools and equipment, and maximising energy efficiency
  • 1.5 Consult with appropriate personnel to ensure that work is coordinated effectively with others in the workplace
  • 1.6 Obtain tools, equipment and timber needed for the work
2. Plan to optimise the volume and value of timber production
  • 2.1 Identify cutting plan and output mix based on analysis of timber characteristics, machine capability and product demand
  • 2.2 Identify processing constraints and potential solutions to ensure that production and quality requirements are met
  • 2.3 Check input material against specification and production run requirements
  • 2.4 Inspect timber for defects and identify potential impact on the cutting plan, production run and product quality
  • 2.5 Finalise cutting plan based on inspection outcomes
  • 2.6 Identify implications of unsuitable planning on volume and value of timber production and associated impacts on customers and saw centre efficiency
  • 2.7 Check trial pieces to ensure compliance with production and product quality requirements
  • 2.8 Communicate cutting plan, production rate and quality requirements to appropriate personnel
3. Implement and report on the optimisation plan
  • 3.1 Implement cutting plan to optimise volume and value of timber production
  • 3.2 Manage production rate to ensure compliance with optimisation objectives
  • 3.3 Monitor quality of cut timber to ensure compliance with optimisation objectives
  • 3.4 Manage reuse, recycling or disposal of items that do not meet quality requirements
  • 3.5 Monitor product flow to optimise downstream processes according to workplace procedures
4. Report on optimisation
  • 4.1 Review optimisation objectives in relation to timber volume and value recovery
  • 4.2 Record production outcomes according to workplace procedures
  • 4.3 Compare production outcomes with optimisation objectives
  • 4.4 Report production outcomes and compliance with optimisation objectives to the appropriate person
No information
No information
No information