Unit of competency Outline

Date retreived
22/07/2026 11:39 PM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Install block parquetry flooring

Install block parquetry flooring

Unit of competency
National Code
MSFFL3081
State Code
OAJ47
TGA Status
Current
DTWD Status
Approved
Current Release Number
1.00
Current Release Date
03/12/2018
State Implementation and Classification
Approved Date
22/05/2019
Field of Education
040321 - Floor Coverings
Original Release Date
22/05/2019
Nominal Hours
35
Description
This unit describes the skills and knowledge required to prepare, set out, cut and install block parquetry flooring in domestic and commercial sites. It includes patterned parquetry.This unit applies to flooring technicians working in accordance with pre-determined work orders.Licensing, legislative or certification requirements may apply to this unit and relevant state/territory and local government agencies should be consulted to determine any necessary certification or licensing for undertaking flooring work. Industry standards and codes of practice within Australia must also be applied. Access to construction sites requires certification of general induction training specified by the National Code of Practice for Induction for Construction Work (ASCC 2007).
Notes
Elements and Performance Criteria
1. Prepare for work
  • 1.1 Identify and follow work health and safety, legislative and organisational requirements
  • 1.2 Correctly identify work requirements and process from review of documentation
  • 1.3 Confirm subfloor condition as suitable for installation consistent with Australian Standards and manufacturer recommendations
  • 1.4 Select and check tools, equipment and materials prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition
  • 1.5 Remove or undercut skirting boards or cover trims if required and store for re-fitting in accordance with work requirements
  • 1.6 Plan sequence of work, including the position of each expansion joint, to ensure efficiency and quality of installation
2. Set out block parquetry flooring
  • 2.1 Inspect timber flooring material and check against work orders, ensuring the species, grade, size and quantity are correct
  • 2.2 Moisture check timber using required equipment and confirm suitability of moisture content for site conditions as per pre-site inspection procedures
  • 2.3 Organise and use block parquetry flooring for fixing in accordance with safety management requirements
  • 2.4 Prepare required adhesives and edge strips in accordance with manufacturer instructions
  • 2.5 Accurately measure area to be covered, and establish working lines and starting point
3. Lay out and cut parquetry blocks
  • 3.1 Follow instructions and sequence for laying and fixing
  • 3.2 Lay appropriate underlay in accordance with manufacturer recommendations
  • 3.3 Lay out block parquetry flooring to meet directional sequence, pattern match, specification requirements, and to minimise waste and joins
  • 3.4 Maximise the aesthetics of the materials, including matching grains and colours
  • 3.5 Accurately and clearly mark parquetry blocks for cutting
  • 3.6 Cut parquetry blocks, to provide appropriate size and shape ensuring minimum waste
4. Install block parquetry
  • 4.1 Use required adhesives and edge strips/accessories in accordance with manufacturer instructions
  • 4.2 Use fixing methods and equipment following manufacturer recommendations
  • 4.3 Install and fix parquetry to produce required pattern
  • 4.4 Allow for appropriate field and perimeter expansion joints
  • 4.5 Fit and/or re-fit and finish skirting boards or cover trims
  • 4.6 Inspect finished job and rectify any imperfections following workplace procedures
5. Complete housekeeping
  • 5.1 Store and recycle unused materials in accordance with workplace procedures
  • 5.2 Check, clean and store tools and equipment in accordance with workplace procedures
  • 5.3 Clean work area and dispose of rubbish safely
  • 5.4 Accurately complete required workplace documentation
No information
No information
Replaces
State Code National Code Title Type
WI390 MSFFL3033 Install block parquetry flooring Unit of competency
WI392 MSFFL3035 Install patterned parquetry flooring Unit of competency
State Code National Code Title Type
BIY1 MSF30822 Certificate III in Flooring Technology Qualification
BED0 MSF30818 Certificate III in Flooring Technology Qualification