Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Install overhead traction components and equipment
Install overhead traction components and equipment
Unit of competency
National Code
UETDRRT002
UETDRRT002
State Code
ODN44
ODN44
TGA Status
Current
Current
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
21/12/2021
Field of Education
031311 - Powerline Installation And Maintenance
Original Release Date
21/12/2021
Nominal Hours
45
Description
This unit involves the skills and knowledge required to install overhead traction components and equipment in the electricity supply industry (ESI).It includes installing hardware whilst undertaking safe working practices on or about the running line/track, identifying and confirming road/rail management plans and electrical permits. It also includes inspecting and checking to confirm equipment, components and hardware have been correctly installed in accordance with design, ensuring traction system is fit for service and updating installation data and relevant quality assurance documentation.The application of the skills and knowledge described in this unit may require a licence/registration to practice in the workplace.Other conditions may also apply under state and territory legislative and regulatory licensing requirements which must be confirmed prior to commencing this unit.
Notes
Elements and Performance Criteria
1 Prepare for installation of overhead traction equipment or components
- 1.1 Legislation, regulations, standards, codes of practice and organisational workplace requirements for the work to be performed are referred to and confirmed
- 1.2 Required design standards and construction plans are obtained
- 1.3 Plant, tools, equipment, components and personal protective equipment (PPE) required for work are determined, obtained and confirmed in working order
- 1.4 Hazards are identified, risks assessed and control measures identified and applied
- 1.5 Work is prioritised and sequenced for completion in accordance with workplace requirements
- 1.6 Work permits are organised in accordance with workplace requirements
- 1.7 Worksite, road or rail management plan is prepared in accordance with workplace requirements
- 1.8 Environmental constraints applicable to the work are identified and control measures applied
2 Perform installation of overhead traction equipment or components
- 2.1 Legislation, regulations, standards, codes of practice and organisational workplace requirements for the work to be performed are applied and monitored
- 2.2 Lifting, working at heights and the use of plant, tools, equipment and PPE are carried out in accordance with workplace requirements
- 2.3 Hazard control measures are monitored in accordance with workplace requirements
- 2.4 Work permits are instructed and issued and where appropriate signed in accordance with workplace requirements
- 2.5 Worksite, road or rail management plan is established in accordance with workplace requirements
- 2.6 Electrical components or equipment and associated hardware are positioned, secured and terminated or connected in accordance with job and workplace requirements
- 2.7 Overhead traction equipment or components are installed within agreed timeframes, to design standards in accordance with job and workplace requirements
- 2.8 Incidents or unplanned events are responded to in accordance with workplace requirements
- 2.9 Quality checks of work are undertaken, and anomalies recorded and adjusted in accordance with workplace requirements
3 Complete work and documentation
- 3.1 Completed work is checked against design standards, construction plans and drawings for compliance and anomalies reported in accordance with workplace requirements
- 3.2 Incidents or unplanned events are reported in accordance with workplace requirements
- 3.3 Worksite is rehabilitated, cleaned and made safe in accordance with workplace requirements
- 3.4 Plant, tools and equipment are cleaned, checked, and returned to storage in accordance with workplace requirements
- 3.5 Surplus materials are returned to storage or disposed of in accordance with workplace requirements
- 3.6 Work permits are completed and overhead traction equipment or components are fit for service in accordance with workplace requirements
- 3.7 Work records, reports and documentation are completed in accordance with workplace requirements
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| OBH21 | UETTDRRT27 | Install overhead traction components and equipment | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BHB3 | UET40421 | Certificate IV in ESI - Network Systems | Qualification |
| BHB6 | UET30721 | Certificate III in ESI - Rail Traction | Qualification |