Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Select and fit insulation and sheathing

Select and fit insulation and sheathing

Unit of competency
National Code
CPCPMS3032
State Code
OCM82
TGA Status
Current
DTWD Status
Approved
Current Release Number
3.00
Current Release Date
09/12/2021
State Implementation and Classification
Approved Date
01/06/2021
Field of Education
040327 - Plumbing
Original Release Date
01/06/2021
Nominal Hours
8
Description
This unit specifies the skills and knowledge required to install insulating sheathing on hot and cold piping, fittings and vessels. It includes the selection of insulation materials.Site location for work application may be either domestic or commercial and may be a new work site or an existing structure being renovated, extended, restored or maintained.In some jurisdictions, this unit of competency may form part of accreditation, licensing, legislative, regulatory or certification requirements.
Notes
Elements and Performance Criteria
1 Prepare for work.
  • 1.1 Access and read job plans and specifications.
  • 1.2 Identify and apply workplace policies and procedures, work health and safety (WHS) and environmental requirements and sustainability associated with the installation of insulating sheathing.
  • 1.3 Apply quality assurance requirements in accordance with workplace requirements.
  • 1.4 Plan and sequence tasks in conjunction with others involved in or affected by the work and statutory and regulatory authorities’ requirements.
  • 1.5 Prepare work area to support efficient installation of insulating sheathing.
  • 1.6 Select appropriate tools and equipment including personal protective equipment (PPE) and check for serviceability.
  • 1.7 Identify materials and equipment required to complete the task.
2 Identify insulation requirements.
  • 2.1 Create a materials list and collect materials.
  • 2.2 Determine fabrication requirements from job plans, specifications and relevant information.
  • 2.3 Calculate quantity and type of materials and components.
3 Install insulation.
  • 3.1 Clean and prepare surfaces of dirt, rust, scale and grease.
  • 3.2 Install insulating materials, including sheathing, according to plans and specifications.
  • 3.3 Select and install appropriate thermal insulation sheathing to sections of both hot and cold piping, fittings and vessels associated with refrigeration and cooling and heating systems.
  • 3.4 Apply vapour barriers to suit job requirements.
  • 3.5 Apply sustainability principles and concepts throughout the installation.
4 Clean up.
  • 4.1 Clear the work area, and dispose of, reuse or recycle materials in accordance with state and territory legislation and workplace policies and procedures.
  • 4.2 Clean tools and equipment check for serviceability reporting any damage, store and secure.
  • 4.3 Complete documentation according to workplace requirements.
No information
No information
Replaces
State Code National Code Title Type
WF915 CPCPMS3032A Select and fit insulation and sheathing Unit of competency
State Code National Code Title Type
BGC2 CPC32420 Certificate III in Plumbing Qualification