Unit of competency Outline
Date retreived
22/07/2026 1:23 AM AWST
22/07/2026 1:23 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Coordinate the Network/System
Coordinate the Network/System
Unit of competency
National Code
UEPOPS420A
UEPOPS420A
State Code
S5262
S5262
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
31/05/2011
Field of Education
031313 - Electrical Fitting, Electrical Mechanics
Original Release Date
31/05/2011
Nominal Hours
60
Description
1)
This unit deals with the skills and knowledge required for the co-ordination of a network/system. Systems may be interconnected, remote or isolated.
This unit deals with the skills and knowledge required for the co-ordination of a network/system. Systems may be interconnected, remote or isolated.
Notes
Elements and Performance Criteria
1 Plan and prepare network operations
- 1.1 Information and documentation to determine network/system status is assessed and evaluated in accordance with system requirements
- 1.2 Network/system and associated equipment operational pre-requisites are determined in accordance with enterprise/system procedures
- 1.3 Work priorities are determined to suit network circumstances in accordance with enterprise/system procedures
- 1.4 Network/system limitations and performance due to location and external influences are identified
- 1.5 Where appropriate, the teams and individuals roles and responsibilities within the team are identified and, where required, assist in the provision of the on-the-job training.
2 Coordinate network /system.
- 2.1 Network/system is operated in accordance with enterprise/system operating procedures
- 2.2 Network/system demand is monitored to maintain quality of supply standards in accordance with requirements and to maintain stability and system integrity
- 2.3 Network/system load shedding sequence and priorities are monitored to ensure system integrity
- 2.4 Corrective actions to rectify deviations are implemented following analysis of data in accordance with system procedures
- 2.5 Resources required to meet system requirements are identified and coordinated in accordance with system procedures
- 2.6 Where required, operations are carried out in consultation with team members
3 Interpret and respond to network/ system faults or incidents
- 3.1 Causes of abnormal network/system operating conditions are identified by interpreting the technical and operational information in a logistical and sequential manner
- 3.2 Operation of protection systems are identified and assessed to evaluate the nature and cause of fault conditions.
- 3.3 Communication may be established with other authorities and/or key stakeholders to identify nature/source of system interference
- 3.4 Corrective action is taken in accordance with enterprise/system procedures
- 3.5 Network/system integrity and safety are maintained through consultation with appropriate personnel and reference to plant technical, operational documentation and contingency plans
4 Complete documentation
- 4.1 Documentation is updated, log sheets maintained and equipment/system problems, movements abnormalities and status are reported and logged in accordance with enterprise/site procedures
No information
No information
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| WE404 | UEPOPS420B | Coordinate the network system | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| S503 | UEP40106 | Certificate IV in ESI Generation (Systems Operations) | Qualification |