Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Operate and monitor brine concentrator plant

Operate and monitor brine concentrator plant

Unit of competency
National Code
UEPOPS324
State Code
OAH04
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
31/10/2018
State Implementation and Classification
Approved Date
15/05/2019
Field of Education
030717 - Plant And Machine Operations
Original Release Date
15/05/2019
Nominal Hours
27
Description
This unit involves the skills and knowledge required to operate, inspect and monitor brine concentrator plant.Power generation facilities typically produce waste water that contains minerals and solids. Brine concentrators are used to remove these impurities as part of the waste water management and treatment process.Competency in this unit requires the ability to plan work, operate brine concentrator plant, test brine concentrator plant, analyse brine concentrator plant faults, monitor and inspect brine concentrator plant and the completion of all documentation. Individuals will, in general, work under supervision, in a power generation facility as an operator. Power generation plant operators are typically trained and authorised to isolate, prepare plant and issue permits to work.No licensing, legislative or certification requirements apply to this unit at the time of publication.Note: Workplace practiceThe application of the skills and knowledge described in this unit may require a licence or training permit to practice in the workplace where work is carried out on gas and electrical installations. Additional conditions may apply under state and territory legislative and regulatory licensing requirements.
Notes
Elements and Performance Criteria
1 Plan and prepare work
  • 1.1 Safety issues related to operating and monitoring brine concentrator plant are identified, in accordance with workplace procedures and Work, Health and Safety (WHS)/Occupational Health and Safety (OHS) regulations and legislative requirements
  • 1.2 Work requirements are identified, in accordance with workplace procedures from appropriate personnel and documentation
  • 1.3 Documentation to determine brine concentrator plant status is assessed and evaluated, in accordance with workplace procedures
  • 1.4 Inspection and field preparations for brine concentrator service are carried out, in accordance with workplace and manufacturers' procedures
  • 1.5 Brine concentrator plant operational prerequisites are established, in accordance with workplace procedures and manufacturers' recommendations
  • 1.6 Sequence for recommissioning of brine concentrator plant is determined, in accordance with workplace procedures and site requirements
2 Operate brine concentratorplant
  • 2.1 Brine concentrator plant is operated, in accordance with workplace procedures and manufacturers' operating recommendations
  • 2.2 Brine concentrator plant is monitored and observed, in accordance with workplace procedures, to detect deviations from normal operating conditions
  • 2.3 Corrective actions are taken to rectify brine concentrator abnormalities, in accordance with workplace procedures and manufacturers' recommendations
  • 2.4 Brine concentrator plant is identified and removed from service, in accordance with workplace procedures and site requirements
  • 2.5 Corrective actions are taken, in accordance with workplace procedures when brine concentrator abnormalities are identified during removal from service
3 Test brine concentratorplant operation
  • 3.1 Operational tests are performed, in accordance with workplace procedures
  • 3.2 Brine concentrator plant is observed for correct operational response, in accordance with workplace procedures
  • 3.3 Corrective action is taken, in accordance with workplace procedures, when response does not meet with documentation, brine concentrator plant integrity or personnel safety requirements
  • 3.4 Brine concentrator plant is returned to required operational status upon completion of testing, in accordance with workplace procedures
4 Analyse brine concentratorplant faults
  • 4.1 Cause of abnormal brine concentrator plant operating conditions are identified, in accordance with workplace procedures, by analysing technical and operational information
  • 4.2 Corrective action is taken, in accordance with workplace procedures
  • 4.3 Brine concentrator plant integrity and personnel safety is maintained, in accordance with workplace procedures, and in consultation with appropriate personnel and technical and operational documentation
5 Monitor and inspect brine concentratorplant
  • 5.1 Brine concentrator plant to be monitored or inspected is physically identified, in accordance with workplace procedures
  • 5.2 Brine concentrator plant is monitored or inspected, in accordance with workplace procedures for normal operation or to detect deviations
  • 5.3 Corrective action is taken, in accordance with workplace procedures
6 Complete documentation
  • 6.1 Brine concentrator plant problems, movements, abnormalities and status are reported, in accordance with workplace procedures
  • 6.2 Documentation is updated, in accordance with workplace procedures
No information
No information
Replaces
State Code National Code Title Type
WE347 UEPOPS324B Operate and monitor brine concentrator plant Unit of competency
Replaced By
State Code National Code Title Type
ODZ31 UEPOPS084 Operate and monitor brine concentrator plant Unit of competency