Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Install and maintain poles, structures and associated hardware

Install and maintain poles, structures and associated hardware

Unit of competency
National Code
UETTDRIS52
State Code
OBH60
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
25/09/2019
State Implementation and Classification
Approved Date
04/12/2019
Field of Education
031311 - Powerline Installation And Maintenance
Original Release Date
04/12/2019
Nominal Hours
45
Description
This unit involves the skills and knowledge required to install and maintain poles, structures and associated hardware in the electricity supply industry (ESI).It includes the installation of poles and/or structures and associated hardware, (excluding towers), which may consist of wood, steel, concrete or composite type material.It also covers the fixing and/or securing of associated hardware as well as the repair and replacement of poles and/or structures.It includes identifying and implementing a suitable traffic management plan.The application of the skills and knowledge described in this unit may require a licence/registration to practice in the workplace.Other conditions may apply under State and Territory legislative and regulatory licensing requirement which must be confirmed prior to commencing this unit.
Notes
Elements and Performance Criteria
1 Prepare for installation and maintenance of poles, structures and associated hardware
  • 1.1 Work schedules, construction plans, drawings, workplace procedures and material lists are received and confirmed
  • 1.2 Job requirements and workplace procedures are identified and communicated with relevant personnel
  • 1.3 Work health and safety (WHS)/occupational health and safety (OHS), environmental and workplace procedures for the installation and maintenance of poles and/or structures and associated hardware are obtained and confirmed for the purposes of the work to be performed
  • 1.4 Work is prioritised and sequenced for completion within acceptable timeframes following consultation with relevant personnel and in accordance with workplace procedures
  • 1.5 Hazards are identified, WHS/OHS risks assessed and control measures identified in accordance with workplace procedures
  • 1.6 Plant, equipment, tools and personal protective equipment (PPE) required for work are identified, obtained and confirmed in working order
  • 1.7 Relevant work permits are obtained, understood and signed in accordance with workplace procedures
  • 1.8 Worksite is prepared to minimise risk, damage to property, commerce and individuals in accordance with workplace procedures
  • 1.9 Traffic management plan is confirmed as being applied in accordance with workplace procedures
2 Carry out installation and maintenance of poles and/or structures and associated hardware
  • 2.1 WHS/OHS, sustainable energy and environmental principles and practices are monitored and followed to reduce incidents in accordance with workplace procedures
  • 2.2 Requirements for lifting and/or climbing and/or working at heights and the use of power tools/equipment are followed in accordance with workplace procedures
  • 2.3 Installation of poles and/or structures and associated hardware are completed in agreed timeframes, to quality standards and with a minimum of waste in accordance with workplace procedures
  • 2.4 Poles and/or structures and associated hardware to be installed are stabilised in accordance with workplace procedures
  • 2.5 Installation is assembled in accordance with construction plans, drawings and workplace procedures
  • 2.6 Maintenance, including repair and/or replacement of poles and/or structures, is performed in accordance with work schedule, job requirements and workplace procedures
  • 2.7 Unplanned events are responded to in accordance with workplace procedures
  • 2.8 Quality checks of work are undertaken in accordance with workplace procedures
3 Complete installation and maintenance of poles, structures and associated hardware
  • 3.1 Completed work is checked against work schedule, construction plans and drawings for compliance and anomalies are reported in accordance with workplace procedures
  • 3.2 WHS/OHS and environmental incidents are reported in accordance with workplace procedures, as required
  • 3.3 Worksite is rehabilitated, cleaned up and made safe in accordance with workplace procedures
  • 3.4 Tools, equipment and surplus resources and materials are, where appropriate, cleaned, checked and returned to storage in accordance with workplace procedures
  • 3.5 Relevant work permits are signed off and poles and/or structures and their associated hardware are returned to service in accordance with workplace procedures
  • 3.6 Work records, reports and/or documentation are completed in accordance with workplace procedures
No information
No information
Replaces
State Code National Code Title Type
WD678 UETTDRIS52A Install and maintain poles, structures and associated hardware Unit of competency
Replaced By
State Code National Code Title Type
ODN24 UETDRIS012 Install and maintain poles, structures and hardware Unit of competency