Unit of competency Outline

Date retreived
22/07/2026 11:46 PM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Prepare and implement race strategies

Prepare and implement race strategies

Unit of competency
National Code
AURMMA5006
State Code
WF272
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
17/01/2013
State Implementation and Classification
Approved Date
08/07/2013
Field of Education
092103 - Sports Coaching, Officiating And Instruction
Original Release Date
08/07/2013
Nominal Hours
50
Description
This unit of competency covers the skills and knowledge required to develop race strategies, communicate strategy plan and contingencies to team members, implement race strategies and conduct post-event reviews.Licensing, legislative, regulatory or certification requirements may apply to this unit in some jurisdictions. Users are advised to check with the relevant regulatory authority.
Notes
Elements and Performance Criteria
1. Develop event strategy
  • 1.1. Workplace health and safety (WHS) requirements, including regulatory requirements and personal protection needs, are observed throughout the work
  • 1.2. Input is sought is sought from team members and compared with available event data, including past performance, and points documented
  • 1.3. Team strategies are devised for attaining competitive advantage
  • 1.4. Team members are briefed on security of information and intellectual property procedures
  • 1.5. Contingency plans are developed and documented
2. Communicate strategy plan and contingencies to team members
  • 2.1. Responsibilities within strategy, plan and contingencies are identified and confirmed with each team member
  • 2.2. Authority hierarchies and relationships are clearly explained
  • 2.3. Team feedback is sought, evaluated and incorporated
3. Implement race strategies
  • 3.1. Team roles and responsibilities are reinforced with team members at an event, prior to event commencement
  • 3.2. Strategies are implemented and clearly communicated to team members during an event
  • 3.3. Contingency plans are communicated and team member roles and responsibilities outlined
  • 3.4. Strategy outcomes are monitored and amended as necessary during an event
4. Conduct post-event review
  • 4.1. Event debrief is conducted with driver/rider and team members as soon as practicable following a race
  • 4.2. Data is analysed and points documented
  • 4.3. Technician reports are considered and points documented
  • 4.4. Team debrief is conducted and outcome including recommendations are documented
  • 4.5. Event strategies are reviewed with team members
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Race strategies
Race strategies include:
consideration of own and competitor strengths and weaknesses
driver/rider psychology
determination of suitable pace, timing of pit stops/driver/rider changes, tyre choice and fuel load
Contingency plans
Contingency plans address potential risks and uncontrollable variables. These include, but are not limited to:
weather changes
variation in circuit conditions
competition vehicle damage
driver error
possible competitor strategies
WHS requirements
WHS requirements include:
state/territory and federal legislation
material safety management systems
controlling body requirements
manufacturer specifications and local safe operating procedures
Legislative requirements
Work is carried out in accordance with legislative obligations (including environmental requirements), health regulations, manual handling procedures and team insurance requirements
Tooling and equipment
Tooling and equipment may include:
data acquisition equipment and computer software and analysis programs
Information/documents
Information/documents may include:
controlling body rules, category rules and supplementary regulations
team procedures relating to race strategies
task instructions including worksheets, checklists, plans, drawings and designs
team procedures relating to reporting and communication
team procedures relating to the use of tooling and equipment
manufacturer/component supplier specifications and application procedures for tooling and equipment
EVIDENCE GUIDE
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment

Critical aspects for assessment and evidence required to demonstrate competency in this unit
Assessors must be satisfied that the candidate can competently and consistently:
interpret and apply team requirements, controlling body and category rules and supplementary regulations
apply safety requirements including the use of personal protective equipment
devise task instructions, operating procedures and inspection processes to:
minimise the risk of injury to self or others
prevent damage to competition vehicle or equipment
achieve required outcomes within team time and quality standards
develop and implement race strategies for a minimum of two (2) events (or simulated events). The following must be demonstrated during development:
consultation with team members
use of problem-solving techniques
consideration of driver/rider strengths and weaknesses
consideration of driver/rider characteristics
consideration of event variations
complete all work data within team quality and timeliness standards
work effectively with others
modify activities to cater for variations in workplace context and environment
apply team data security and confidentiality procedures and processes at all times.
Context of, and specific resources for assessment
Assessment may occur on the job or in a workplace simulated facility with process equipment, material, work instructions and deadlines.
Access to previous performance data, regulatory body and category rules and supplementary regulations.
Method of assessment
Assessment methods must confirm consistency of performance over time and in a range of workplace contexts.
Assessment should be by direct observation of tasks and questioning on underpinning knowledge.
Assessment should be conducted over time and may be in conjunction with assessment of other units of competency.
Competence in this unit may be assessed in conjunction with other functional units which together form part of the holistic work role.
Guidance information for assessment
Replaces
State Code National Code Title Type
W2914 AURM542849A Prepare and implement race strategies Unit of competency
Replaced By
State Code National Code Title Type
AXC08 AURMMA006 Develop and implement race strategies for motor sport events Unit of competency
State Code National Code Title Type
J424 AUR50312 Diploma of Motorsport Technology Qualification