Unit of competency Outline
Date retreived
22/07/2026 10:58 PM AWST
22/07/2026 10:58 PM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Licence to operate a reach stacker - greater than 3 tonnes capacity
Licence to operate a reach stacker - greater than 3 tonnes capacity
Unit of competency
National Code
TLILIC3019A
TLILIC3019A
State Code
WG241
WG241
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
21/03/2014
Field of Education
030717 - Plant And Machine Operations
Original Release Date
21/03/2014
Nominal Hours
40
Description
Not applicable.
Notes
Elements and Performance Criteria
1 Plan work
- 1.1 Site inspection is completed and potential workplace hazards are identified prior to commencement of operations
- 1.2 Hazard control measures are identified and implemented consistent with appropriate standards to ensure the safety of personnel and equipment
- 1.3 Job requirements are confirmed with appropriate personnel
- 1.4 Work is planned to comply with instructions, risk assessment, and operating and emergency procedures
- 1.5 Weight of the container is identified or confirmed in consultation with appropriate personnel
- 1.6 Appropriateness of the reach stacker to the container/s and workplace conditions is ensured
- 1.7 Appropriate path for the movement of containers in work area is determined and inspected
- 1.8 Appropriate communication methods are identified and selected according to procedures
2 Conduct routine checks
- 2.1 Reach stacker is accessed in a safe manner according to procedures
- 2.2 Reach stacker service logbook is checked for compliance
- 2.3 Routine pre-start operational checks are carried out according to procedures and are completed in a safe manner
- 2.4 Reach stacker is visually checked for any damage or defects
- 2.5 Visibility and legibility of all signage and labels is ensured according to the appropriate standard
- 2.6 All reach stacker controls are located and identified
- 2.7 Post-start operational checks are carried out according to procedures including operational functions to limits
- 2.8 Reach stacker is started according to procedures and is checked for any abnormal instrument readings/warnings lights and noises
- 2.9 All reach stacker safety devices and communication equipment are checked for serviceability according to procedures
- 2.10 All damage and defects are reported and recorded according to procedures, and appropriate action is taken
3 Prepare reach stacker operations
- 3.1 Ground suitability is checked to ensure stability and safe operation of reach stacker
- 3.2 Reach stacker is driven to work area and prepared for container operations according to procedures and manufacturer specifications
- 3.3 Appropriate reach stacker stability requirements for task are determined according to procedures and range diagram/load chart
- 3.4 Container data is input into reach stacker computer as required according to workplace procedures
- 3.5 Appropriate hazard prevention/control measures are implemented and communicated with personnel in work area according to procedures
4 Operate reach stacker
- 4.1 Container weights are checked to ensure they are within the capacity of reach stacker according to the range diagram/load chart
- 4.2 Hazard prevention/control measures are complied with during reach stacker operations
- 4.3 Container spreader is positioned over container following directions from associated personnel
- 4.4 Test lift is carried out according to procedures
- 4.5 All required communication signals are correctly interpreted according to procedures and the appropriate standard
- 4.6 Reach stacker is operated according to procedures and the appropriate standard
- 4.7 Containers are stacked/unstacked using all relevant reach stacker and spreader movements according to procedures and the appropriate standard
- 4.8 Container movement is monitored constantly ensuring safety to personnel and container, and reach stacker stability
- 4.9 Container is stacked according to procedures, ensuring ground conditions are suitable for stacking containers and stability of the stack, safety to personnel and container
- 4.10 Unplanned and/or unsafe situations are responded to according to procedures
5 Travel reach stacker and mobile container
- 5.1 Suitability of planned route for reach stacker is checked according to procedures
- 5.2 Reach stacker is configured to mobile containers according to procedures and the appropriate standard, OH&S legislation and codes of practice
- 5.3 Containers are mobilised ensuring safety to personnel and container, and stability of reach stacker
- 5.4 Container is mobilised using best mobile practice according to procedures
6 Shut down and secure reach stacker
- 6.1 Reach stacker boom and container spreader are packed up and secured, where appropriate, according to procedures and the appropriate standard
- 6.2 Relevant locking devices and brakes are applied when applicable
- 6.3 Stabilisers are stowed and secured according to procedures
- 6.4 Reach stacker is parked and shut down according to procedures
- 6.5 Routine post-operational checks are carried out according to procedures
- 6.6 All damage and defects are recorded and reported according to procedures, and appropriate action is taken
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance.
Appropriate may include:
reach stacker capabilities
environmental conditions (such as wind, lightning, storms)
Appropriate standards may include:
codes of practice
legislation and regulations (national/state/territory)
Australian Standards
manufacturer specifications
industry standards
Appropriate path may include:
clear of obstacles
clear of personnel
in accordance with traffic management plan
free of ramps or inclines
Appropriate personnel may include:
site OH&S personnel
supervisory personnel
operations supervisor
guide
Authorised personnel may include:
national/state/territory government regulatory bodies
site OH&S personnel
Best mobile practice may include:
minimum speed
gentle acceleration and braking (to minimise container swing)
minimum boom length
carrying the container at manufacturer recommended height
not driving across inclines or slopes
Configuration may include:
boom
spreader
stabilisers
Container spreader may include:
twist locks to engage and disengage the container
extension from 20 ft to 40 ft containers
articulation device to rotate container
side-shift to balance/equalise container
Communication equipment may include:
fixed channel two-way radios
hand held two-way radios
hand signals
whistle
Communication method may include:
verbal
written instructions and procedures
signage
two-way radios
hand signals
according to worksite protocol
Communication signals may include:
stop - hand
stop - whistle and/or two-way radio
luff boom down - hand
luff boom down - whistle and/or two-way radio
luff boom up - hand
luff boom up - whistle and/or two-way radio
telescope out - hand
telescope out - whistle and/or two-way radio
telescope in - hand
telescope in - whistle and/or two-way radio
Ground suitability may include:
hard standing
rough uneven ground
backfilled ground
soft soils
hard compacted soil
railway lines
rock
bitumen
concrete
Hazards may include:
condition of plant and equipment
movement of vehicle or rail wagon
ground stability (condition, recently filled trenches, slopes)
dangerous goods/hazardous substances
overhead hazards (electric lines, service pipes)
underground hazards (powerlines, service pipes)
insufficient lighting
weather conditions (high winds, lightning)
traffic (pedestrians, vehicles)
environmental conditions (wind, lightning, storms)
other specific site hazards (work personnel, other equipment)
Planned route may include:
unusual or difficult terrain
obstacles or obstruction
personnel
equipment/traffic
Pre-start operational checks must include:
complying with manufacturer instructions, Australian Standards and industry guidelines
Pre-start operational checks may include:
safety devices/alarms fitted where appropriate
all operational functions
load chart/range diagram interpreted
logbook, operators manual available
external visual check including, evidence of damage, leaks, electrical, wheels and tyres, boom and spreader
Post-operational checks may include:
checking equipment after shut down to ensure the reach stacker is safe for the next operator and includes checking:
equipment is parked to avoid hazards
all systems are shut down
structural damage
hydraulic or brake fluid leaks
Procedures may include:
manufacturer guidelines (instructions, specifications, operator manual or checklists)
industry operating procedures
workplace procedures (work instructions, operating procedures, checklists)
Range diagram may include:
height of container stack
maximum reach
container dimensions
maximum weight
Reach stacker may include:
a type of plant greater than 3 tonnes capacity that incorporates an attachment for lifting, moving and travelling with a shipping container, but does not include a portainer crane
Reach stacker controls may include:
luffing levers
spreader controls (extend/retract/side shift/rotate)
twist lock controls
boom extension levers
cabin positioning controls
Relevant reach stacker movements may include:
telescoping in and out
booming up and down
articulating
rotating spreader
extending/retracting spreader
equalising spreader
Risk prevention and control measures
eliminating or reducing risk to personnel and property through the application of control measures
applying the hierarchy of control:
elimination
substitution
isolation
engineering control measures
using safe work practices
personal protective equipment
safety tags on electrical switches/isolators
insulated electric lines
safety observer used inside exclusion zone
disconnected power
traffic barricades and traffic controls
pedestrian controls
trench covers
movement of obstructions
personal protective equipment
adequate illumination
Signage and labels may include:
reach stacker data plates/labels
range diagram/load charts
reach stacker safety decals
control labels
Service logbook may include:
equipment logbook
service book
history record system
Safety devices may include:
horns/sirens
audible and visual reversing devices
operator restraint devices
lights
stability and weight limitation/warning devices
Shut down may include:
parking in a safe location
using correct parking procedures
retracting boom
retracting spreader
reposition cabin
idling engine to stabilise temperature
retracting stabilisers
turning off engine
isolating power
Stability may include:
deploying stabilisers
computer providing stability reading as a percentage
Test lift may include:
conducting a controlled lift as a test lift prior to commencing operations, where the container is lifted just clear of the lifting plane to allow for checks to ensure that:
computer correctly displays stability percentage of reach stacker
boom length and height are displayed correctly
computer/weight scale is working correctly
all reach stacker hydraulic controls and brake systems are functioning properly (no boom creep etc.)
Unplanned and/or unsafe situations may include:
failure/loss of control (brakes and steering)
failure of equipment (hydraulic system, computer)
rail/road moving unannounced while loading/discharging
environmental conditions (wind, lightning, storms)
Work area may include:
depot
warehouse
wharf
rail siding
Appropriate may include:
reach stacker capabilities
environmental conditions (such as wind, lightning, storms)
Appropriate standards may include:
codes of practice
legislation and regulations (national/state/territory)
Australian Standards
manufacturer specifications
industry standards
Appropriate path may include:
clear of obstacles
clear of personnel
in accordance with traffic management plan
free of ramps or inclines
Appropriate personnel may include:
site OH&S personnel
supervisory personnel
operations supervisor
guide
Authorised personnel may include:
national/state/territory government regulatory bodies
site OH&S personnel
Best mobile practice may include:
minimum speed
gentle acceleration and braking (to minimise container swing)
minimum boom length
carrying the container at manufacturer recommended height
not driving across inclines or slopes
Configuration may include:
boom
spreader
stabilisers
Container spreader may include:
twist locks to engage and disengage the container
extension from 20 ft to 40 ft containers
articulation device to rotate container
side-shift to balance/equalise container
Communication equipment may include:
fixed channel two-way radios
hand held two-way radios
hand signals
whistle
Communication method may include:
verbal
written instructions and procedures
signage
two-way radios
hand signals
according to worksite protocol
Communication signals may include:
stop - hand
stop - whistle and/or two-way radio
luff boom down - hand
luff boom down - whistle and/or two-way radio
luff boom up - hand
luff boom up - whistle and/or two-way radio
telescope out - hand
telescope out - whistle and/or two-way radio
telescope in - hand
telescope in - whistle and/or two-way radio
Ground suitability may include:
hard standing
rough uneven ground
backfilled ground
soft soils
hard compacted soil
railway lines
rock
bitumen
concrete
Hazards may include:
condition of plant and equipment
movement of vehicle or rail wagon
ground stability (condition, recently filled trenches, slopes)
dangerous goods/hazardous substances
overhead hazards (electric lines, service pipes)
underground hazards (powerlines, service pipes)
insufficient lighting
weather conditions (high winds, lightning)
traffic (pedestrians, vehicles)
environmental conditions (wind, lightning, storms)
other specific site hazards (work personnel, other equipment)
Planned route may include:
unusual or difficult terrain
obstacles or obstruction
personnel
equipment/traffic
Pre-start operational checks must include:
complying with manufacturer instructions, Australian Standards and industry guidelines
Pre-start operational checks may include:
safety devices/alarms fitted where appropriate
all operational functions
load chart/range diagram interpreted
logbook, operators manual available
external visual check including, evidence of damage, leaks, electrical, wheels and tyres, boom and spreader
Post-operational checks may include:
checking equipment after shut down to ensure the reach stacker is safe for the next operator and includes checking:
equipment is parked to avoid hazards
all systems are shut down
structural damage
hydraulic or brake fluid leaks
Procedures may include:
manufacturer guidelines (instructions, specifications, operator manual or checklists)
industry operating procedures
workplace procedures (work instructions, operating procedures, checklists)
Range diagram may include:
height of container stack
maximum reach
container dimensions
maximum weight
Reach stacker may include:
a type of plant greater than 3 tonnes capacity that incorporates an attachment for lifting, moving and travelling with a shipping container, but does not include a portainer crane
Reach stacker controls may include:
luffing levers
spreader controls (extend/retract/side shift/rotate)
twist lock controls
boom extension levers
cabin positioning controls
Relevant reach stacker movements may include:
telescoping in and out
booming up and down
articulating
rotating spreader
extending/retracting spreader
equalising spreader
Risk prevention and control measures
eliminating or reducing risk to personnel and property through the application of control measures
applying the hierarchy of control:
elimination
substitution
isolation
engineering control measures
using safe work practices
personal protective equipment
safety tags on electrical switches/isolators
insulated electric lines
safety observer used inside exclusion zone
disconnected power
traffic barricades and traffic controls
pedestrian controls
trench covers
movement of obstructions
personal protective equipment
adequate illumination
Signage and labels may include:
reach stacker data plates/labels
range diagram/load charts
reach stacker safety decals
control labels
Service logbook may include:
equipment logbook
service book
history record system
Safety devices may include:
horns/sirens
audible and visual reversing devices
operator restraint devices
lights
stability and weight limitation/warning devices
Shut down may include:
parking in a safe location
using correct parking procedures
retracting boom
retracting spreader
reposition cabin
idling engine to stabilise temperature
retracting stabilisers
turning off engine
isolating power
Stability may include:
deploying stabilisers
computer providing stability reading as a percentage
Test lift may include:
conducting a controlled lift as a test lift prior to commencing operations, where the container is lifted just clear of the lifting plane to allow for checks to ensure that:
computer correctly displays stability percentage of reach stacker
boom length and height are displayed correctly
computer/weight scale is working correctly
all reach stacker hydraulic controls and brake systems are functioning properly (no boom creep etc.)
Unplanned and/or unsafe situations may include:
failure/loss of control (brakes and steering)
failure of equipment (hydraulic system, computer)
rail/road moving unannounced while loading/discharging
environmental conditions (wind, lightning, storms)
Work area may include:
depot
warehouse
wharf
rail siding
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required knowledge and skills, the range statement and the assessment guidelines for this Training Package.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the Elements, Performance Criteria, Required Skills, Required Knowledge and include:
complying with OH&S licensing legislation
complying with organisational and site policies and procedures
communicating and working safely with others in the work area.
Context of and specific resources for assessment
Successful assessment of this unit meets the competency requirement of the OH&S regulations.
State/territory OH&S regulators have mandated the use of the Assessment Instrument and instructions for assessment for this unit, which have been endorsed by the national body responsible for OH&S matters.
Assessment of the safe and effective application of knowledge and skill to workplace tasks (performance) must be undertaken using the endorsed Assessment Instrument.
Assessment of performance must be undertaken either in the workplace or in a realistic workplace simulated setting.
Assessors must ensure that assessment in the workplace is organised to ensure that all the required equipment, materials and a suitable working area are made available to suit the assessment and the workplace.
Assessment must occur under standard and authorised work practices, safety requirements and environmental constraints.
Assessment is to comply with the relevant appropriate standard requirements.
Applicants must have access to:
personal protective equipment (PPE) for the purpose of the performance assessment
appropriate reach stacker (greater than 3 tonnes) in safe operating condition
suitable 20 ft and/or 40 ft containers and container stack as specified by endorsed national Assessment Instrument
communication equipment (e.g. two-way radios, whistles, etc).
Method of assessment
Assessment must be conducted using the endorsed Assessment Instrument. The Assessment Instrument provides advice on its application.
The use of ‘simulators’ in the assessment of this unit of competency is not acceptable.
Assessment may be in conjunction with the assessment of other units of competency.
Assessment methods must confirm consistency and accuracy of performance.
Assessment must confirm a reasonable inference that competency is not only able to be satisfied under the particular circumstances, but is able to be transferred to other circumstances.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the Elements, Performance Criteria, Required Skills, Required Knowledge and include:
complying with OH&S licensing legislation
complying with organisational and site policies and procedures
communicating and working safely with others in the work area.
Context of and specific resources for assessment
Successful assessment of this unit meets the competency requirement of the OH&S regulations.
State/territory OH&S regulators have mandated the use of the Assessment Instrument and instructions for assessment for this unit, which have been endorsed by the national body responsible for OH&S matters.
Assessment of the safe and effective application of knowledge and skill to workplace tasks (performance) must be undertaken using the endorsed Assessment Instrument.
Assessment of performance must be undertaken either in the workplace or in a realistic workplace simulated setting.
Assessors must ensure that assessment in the workplace is organised to ensure that all the required equipment, materials and a suitable working area are made available to suit the assessment and the workplace.
Assessment must occur under standard and authorised work practices, safety requirements and environmental constraints.
Assessment is to comply with the relevant appropriate standard requirements.
Applicants must have access to:
personal protective equipment (PPE) for the purpose of the performance assessment
appropriate reach stacker (greater than 3 tonnes) in safe operating condition
suitable 20 ft and/or 40 ft containers and container stack as specified by endorsed national Assessment Instrument
communication equipment (e.g. two-way radios, whistles, etc).
Method of assessment
Assessment must be conducted using the endorsed Assessment Instrument. The Assessment Instrument provides advice on its application.
The use of ‘simulators’ in the assessment of this unit of competency is not acceptable.
Assessment may be in conjunction with the assessment of other units of competency.
Assessment methods must confirm consistency and accuracy of performance.
Assessment must confirm a reasonable inference that competency is not only able to be satisfied under the particular circumstances, but is able to be transferred to other circumstances.
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| AWL58 | TLILIC3019 | Licence to operate a reach stacker (greater than 3 tonnes capacity) | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| J804 | TLI33513 | Certificate III in Stevedoring | Qualification |