Unit of competency Outline
Date retreived
22/07/2026 5:52 AM AWST
22/07/2026 5:52 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Install optical fibre splitters in fibre distribution hubs
Install optical fibre splitters in fibre distribution hubs
Unit of competency
National Code
ICTBWN3088B
ICTBWN3088B
State Code
WI865
WI865
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
15/04/2014
Field of Education
031309 - Communications Equipment Installation And Maintenance
Original Release Date
15/04/2014
Nominal Hours
35
Description
This unit describes the performance outcomes, skills and knowledge required to install optical fibre splitters in fibre distribution hubs (FDH) as part of a fibre to the premises (FTTP) network.Optical networks and FTTP are part of the strategies by service providers using wave division multiplexing (WDM) to deliver very high speed broadband capacity through the access network for the National Broadband Network (NBN) initiative.Assessment by a TITAB-registered assessor is recommended.
Notes
Elements and Performance Criteria
1. Set up and prepare for installation
- 1.1 Review preparation to ensure work complies with requirements of relevant legislation, codes, regulations and standards
- 1.2 Scope the work by obtaining project plan from appropriate personnel and arrange for site access to comply with security arrangements
- 1.3 Notify appropriate personnel of identified safety hazards at the work site
- 1.4 Determine type of FDH enclosure and optical splitter module from project plan and identify splitter installation requirements using work instructions
- 1.5 Obtain tools and safety equipment and material to perform tasks safely and efficiently
- 1.6 Select and use required protective equipment and make site safe and secure for installation work
- 1.7 Obtain splitter module and visually inspect for splitter module damage and replace if necessary
2. Install splitter module in FDH
- 2.1 Follow occupational health and safety (OHS) and environmental requirements for the given work and identify and avoid other services
- 2.2 Open the enclosure and assess the suitability of the FDH according to the project plan
- 2.3 Locate next available slot in splitter module area of FDH for installation
- 2.4 Insert splitter module and secure according to manufacturer specifications
- 2.5 Inspect installed splitter module and surrounding area for completeness of job
3. Prepare and connect splitter input fibres to feeder cable
- 3.1 Locate feeder port to be connected and remove protective cover in preparation
- 3.2 Use an optical power meter to verify feeder port is not active
- 3.3 Clean the adapter according to manufacturer specifications and route splitter input fibre to correct feeder port
- 3.4 Remove dust cap and clean end face according to manufacturer specifications to prevent possible damage from mating contaminated connectors
- 3.5 Connect input fibre to feeder port and record connection according to organisational policy
4. Connect output fibres and test splitter
- 4.1 Determine output fibre to be connected and required adapter in distribution field
- 4.2 Clean adapter and fibre end-face according to manufacturer specifications
- 4.3 Route output fibre and connect with adapter in distribution field
- 4.4 Test operation of optical splitter for optical power levels at the operating WDM optical wavelengths
- 4.5 Record connections, test results and park unused fibre leads for safety reasons according to organisational policy
5. Clean up work site
- 5.1 Seal any internal enclosures and close FDH
- 5.2 Remove installation waste and debris from work site and dispose of according to environmental requirements
- 5.3 Notify appropriate personnel of job completion and obtain sign-off
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Relevant legislation, codes, regulations and standards may include:
Australian Communications Industry Forum (ACIF) standards and codes
AS Communications Cabling Manual (CCM) Volume 1
AS/NZS 3000:2007
AS/NZS 3080:2003
AS/NZS 3084:2003
AS/NZS 3085.1:2004
AS/NZS IEC 61935.1:2006
AS/NZS IEC 61935.2:2006
AS/NZS ISO/IEC 14763.3:2007
AS/NZS ISO/IEC 15018:2005
AS/NZS ISO/IEC 24702:2007
cabling security codes and regulations
Environment Protection Acts
ISO Draft 11801 (International)
OHS Acts and relevant codes and standards
regulated or industry codes of practice, including appropriate Australian Communications and Media Authority (ACMA) standards
relevant Institute of Electrical and Electronics Engineers (IEEE) standards
technical standards AS/ACIF S008:2006 and AS/ACIF S009:2006.
Appropriate personnel may be:
consultant
project engineer
project supervisor
site supervisor.
Safety hazards may refer to:
access points that may contain:
hazardous light (non-visible laser)
radio frequency (RF) emission
active lasers with no safety labels
active optical fibres
contact with remote power feed
electrical supply that require mandatory separation from communications cable
exposed fibres
unsafe support structures
unsafe weather:
heavy rains
high winds
severe heat or cold
thunderstorms.
FDH enclosure may include:
external cabinet
internal cabinet.
Optical splitter module may include:
4 port
8 port
16 port
32 port.
Tools and safety equipment may include:
personal protective equipment
safety equipment
test equipment:
passive optical network (PON) meter
optical time domain reflectometer (OTDR)
tools:
fibre cleaning kit
fibre splicer
labeller
screw drivers
spanners
tagging tool.
Splitter module damage may include:
broken connector
kinks in fibre leads
no end caps on connectors
physical damage to module body.
OHS and environmental requirements may relate to:
identifying other services, including power and gas
personal protective equipment:
earmuffs
gloves:
leather
plastic
rubber
head protection
masks
protective suits
safety boots
safety glasses
safe work practices, such as the safe use and handling of:
chemicals
materials
tools and equipment
safety equipment:
flashing lights
safety barriers
warning signs and tapes
witches hats
special access requirements
environmental considerations:
clean-up protection
stormwater protection
waste management.
Other services may include:
alarms
electrical services
fire sprinkler systems
gas and water mains
high voltage (HV) power
other service provider networks.
Contaminated connectors may include:
chips
dry residue
dust
liquids
scratches.
WDM optical wavelengths are set at:
1310 nm
1490 nm
1550 nm.
Relevant legislation, codes, regulations and standards may include:
Australian Communications Industry Forum (ACIF) standards and codes
AS Communications Cabling Manual (CCM) Volume 1
AS/NZS 3000:2007
AS/NZS 3080:2003
AS/NZS 3084:2003
AS/NZS 3085.1:2004
AS/NZS IEC 61935.1:2006
AS/NZS IEC 61935.2:2006
AS/NZS ISO/IEC 14763.3:2007
AS/NZS ISO/IEC 15018:2005
AS/NZS ISO/IEC 24702:2007
cabling security codes and regulations
Environment Protection Acts
ISO Draft 11801 (International)
OHS Acts and relevant codes and standards
regulated or industry codes of practice, including appropriate Australian Communications and Media Authority (ACMA) standards
relevant Institute of Electrical and Electronics Engineers (IEEE) standards
technical standards AS/ACIF S008:2006 and AS/ACIF S009:2006.
Appropriate personnel may be:
consultant
project engineer
project supervisor
site supervisor.
Safety hazards may refer to:
access points that may contain:
hazardous light (non-visible laser)
radio frequency (RF) emission
active lasers with no safety labels
active optical fibres
contact with remote power feed
electrical supply that require mandatory separation from communications cable
exposed fibres
unsafe support structures
unsafe weather:
heavy rains
high winds
severe heat or cold
thunderstorms.
FDH enclosure may include:
external cabinet
internal cabinet.
Optical splitter module may include:
4 port
8 port
16 port
32 port.
Tools and safety equipment may include:
personal protective equipment
safety equipment
test equipment:
passive optical network (PON) meter
optical time domain reflectometer (OTDR)
tools:
fibre cleaning kit
fibre splicer
labeller
screw drivers
spanners
tagging tool.
Splitter module damage may include:
broken connector
kinks in fibre leads
no end caps on connectors
physical damage to module body.
OHS and environmental requirements may relate to:
identifying other services, including power and gas
personal protective equipment:
earmuffs
gloves:
leather
plastic
rubber
head protection
masks
protective suits
safety boots
safety glasses
safe work practices, such as the safe use and handling of:
chemicals
materials
tools and equipment
safety equipment:
flashing lights
safety barriers
warning signs and tapes
witches hats
special access requirements
environmental considerations:
clean-up protection
stormwater protection
waste management.
Other services may include:
alarms
electrical services
fire sprinkler systems
gas and water mains
high voltage (HV) power
other service provider networks.
Contaminated connectors may include:
chips
dry residue
dust
liquids
scratches.
WDM optical wavelengths are set at:
1310 nm
1490 nm
1550 nm.
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
Critical aspects for assessment and evidence required to demonstrate competency in this unit
Evidence of the ability to:
use optical power test equipment
measure optical signals at three WDM wavelengths
install splitter in the enclosure
connect input and out optical fibres to the splitter
test optical splitter
complete connection recording
comply with all related OHS requirements and work practices.
Context of, and specific resources for assessment
Assessment must ensure:
a telecommunications operations site where installation of optical fibre splitters in FDH may be conducted
a fibre distribution hub and relevant optical splitter
use of tools, equipment and personal protective equipment currently used in industry
relevant regulatory and equipment documentation that impacts on work activities.
Methods of assessment
A range of assessment methods should be used to assess practical skills and knowledge. The following examples are appropriate for this unit:
direct observation of candidate installing optical fibre splitters in FDH
direct observation of candidate applying all related OHS requirements and work practices
oral or written questioning to assess required knowledge.
Guidance information for assessment
Holistic assessment with other units relevant to the industry sector, workplace and job role is recommended, e.g.
ICTBWN3090B Install lead-in module and cable for fibre to the premises
ICTBWN3100B Work safely with live fibre to test and commission a fibre to the x installation.
Aboriginal people and other people from a non-English speaking background may have second language issues.
Access must be provided to appropriate learning and assessment support when required.
Assessment processes and techniques must be culturally appropriate, and appropriate to the oral communication skill level, and language and literacy capacity of the candidate and the work being performed.
In all cases where practical assessment is used it will be combined with targeted questioning to assess required knowledge. Questioning techniques should not require language, literacy and numeracy skills beyond those required in this unit of competency.
Where applicable, physical resources should include equipment modified for people with special needs.
Overview of assessment
Critical aspects for assessment and evidence required to demonstrate competency in this unit
Evidence of the ability to:
use optical power test equipment
measure optical signals at three WDM wavelengths
install splitter in the enclosure
connect input and out optical fibres to the splitter
test optical splitter
complete connection recording
comply with all related OHS requirements and work practices.
Context of, and specific resources for assessment
Assessment must ensure:
a telecommunications operations site where installation of optical fibre splitters in FDH may be conducted
a fibre distribution hub and relevant optical splitter
use of tools, equipment and personal protective equipment currently used in industry
relevant regulatory and equipment documentation that impacts on work activities.
Methods of assessment
A range of assessment methods should be used to assess practical skills and knowledge. The following examples are appropriate for this unit:
direct observation of candidate installing optical fibre splitters in FDH
direct observation of candidate applying all related OHS requirements and work practices
oral or written questioning to assess required knowledge.
Guidance information for assessment
Holistic assessment with other units relevant to the industry sector, workplace and job role is recommended, e.g.
ICTBWN3090B Install lead-in module and cable for fibre to the premises
ICTBWN3100B Work safely with live fibre to test and commission a fibre to the x installation.
Aboriginal people and other people from a non-English speaking background may have second language issues.
Access must be provided to appropriate learning and assessment support when required.
Assessment processes and techniques must be culturally appropriate, and appropriate to the oral communication skill level, and language and literacy capacity of the candidate and the work being performed.
In all cases where practical assessment is used it will be combined with targeted questioning to assess required knowledge. Questioning techniques should not require language, literacy and numeracy skills beyond those required in this unit of competency.
Where applicable, physical resources should include equipment modified for people with special needs.
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| D3294 | ICTBWN3088A | Install optical fibre splitters in fibre distribution hubs | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| AWF01 | ICTBWN302 | Install optical fibre splitters in fibre distribution hubs | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| J818 | ICT30613 | Certificate III in Broadband and Wireless Networks | Qualification |
| J814 | ICT30113 | Certificate III in Broadband and Wireless Networks Technology | Qualification |
| AWB0 | ICT30115 | Certificate III in Information, Digital Media and Technology | Qualification |
| J602 | ICT30713 | Certificate III in National Broadband Network Construction | Qualification |
| J816 | ICT30313 | Certificate III in Telecommunications Cabling | Qualification |