Unit of competency Outline

Date retreived
22/07/2026 1:52 AM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Develop HV distribution and subtransmission switching programs

Develop HV distribution and subtransmission switching programs

Unit of competency
National Code
UETTDRSO07B
State Code
WA549
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
21/07/2011
State Implementation and Classification
Approved Date
13/04/2010
Field of Education
031301 - Electrical Engineering
Original Release Date
13/04/2010
Nominal Hours
100
Description
1) 1.1) DescriptorThis Competency Standard Unit covers the preparation and/or checking of activities required to place the HV distribution and sub transmission network in a state in which work can safely be performed whilst minimising customer outages. The format is typically a written sequence of switching items in a pre-defined format. It includes planning outages and taking into account loading of network components. It also includes planning the management of multiple outages on the HV distribution and sub transmission network and the calculation of network loading conditions to ensure the network is operating within designed parameters.
Notes
Elements and Performance Criteria
1 Plan for the preparation of HV Distribution and Sub transmission Switching programs
  • 1.1 OHS practices/procedures and environmental and sustainable energy procedures, which may influence the preparation of HV Distribution and Sub transmission Switching system programs, are reviewed and determined.
  • 1.2 Purpose for the preparation of HV Distribution and sub transmission switching programs is established after data is analysed and expected outcomes of the work are confirmed with the appropriate personnel.
  • 1.3 Organisational established procedures on policies and specifications for the preparation of HV Distribution and sub transmission switching programs are obtained or established with the appropriate personnel.
  • 1.4 Testing/switching procedures are discussed with/directed to the appropriate personnel in order to ascertain the project brief.
  • 1.5 Testing/switching parameters are established from organisational established procedures on policies and specifications.
  • 1.6 Equipment/tools and personal protective equipment are selected based on specified Performance Criteria and established procedures.
  • 1.7 Work roles and tasks are allocated according to requirements and individuals' competencies.
  • 1.8 Work is prioritised and sequenced for the most efficient/effective outcome, completed within an acceptable timeframe to a quality standard and in accordance with established procedures.
  • 1.9 Liaison and communication issues with other/authorised personnel, authorities, clients and land owners are resolved and activities coordinated to carry out work.
  • 1.10 Risk control measures are identified, prioritised and evaluated against the work schedule.
  • 1.11 Relevant work permits are secured to coordinate the performance of work according to requirements and/or established procedures.
2 Carry out the preparation of HV Distribution and sub transmission switching programs
  • 2.1 Circuit/systems modelling is used to evaluate alternative proposals as per established procedures.
  • 2.2 OHS and sustainable energy principles, functionality and practices to reduce the incidents of accidents and minimise waste are incorporated into the project in accordance with requirements and/or established procedures.
  • 2.3 Preparation of HV Distribution and sub transmission switching program decisions are made on the basis of safety and effective outcomes according to requirements and/or established procedures.
  • 2.4 Mathematical and/or engineering models of the program is used to analyse the effectiveness of the finished project as per requirements and established procedures.
  • 2.5 Technical advice is given regarding potential hazards, safety risks and control measures so that monitoring and preventative action can be undertaken and/or appropriate authorities consulted, where necessary, in accordance with requirements and established procedures.
  • 2.6 Essential knowledge and associated skills are applied to analyse specific data and compare it with compliance specifications to ensure completion of the project within an agreed timeframe according to requirements.
  • 2.7 Testing of the program is undertaken according to requirements and established procedures.
  • 2.8 Work teams/groups are arranged/coordinated/evaluated to ensure planned goals are met according to established procedures.
  • 2.9 Solutions to non-routine problems are identified and actioned, using acquired essential knowledge and associated skills, according to requirements.
  • 2.10 Quality of work is monitored against personal performance agreement and/or established organisational and professional standards.
  • 2.11 Strategic plans are developed incorporating organisation initiatives as per established procedures.
3 Complete the preparation of HV Distribution and sub transmission switching programs
  • 3.1 Final review of the switching program is undertaken to ensure they comply with all requirements and include all specifications and documentations needed to complete the project.
  • 3.2 Appropriate personnel are notified of completion and reports and/or completion documents are finalised/commissioned.
  • 3.3 Reports and/or completion documents are submitted to relevant personnel/organisations for approval and, where applicable, statutory or regulatory approval.
  • 3.4 Approved copies of prepared HV Distribution and sub transmission switching program documents are issued and records are updated in accordance with established procedures.
RANGE STATEMENT
8) This relates to the competency standard unit as a whole providing the range of contexts and conditions to which the Performance Criteria apply. It allows for different work environments and situations that will affect performance.
This Competency Standard Unit shall/may be demonstrated in relation to the preparation and/or checking of activities required to place the HV distribution and sub transmission network (may also be applied to include rail/tram networks) in a state in which work can safely be performed whilst minimising customer outages and shall/may be demonstrated using the following:
HV distribution feeders/distribution network -radial or loop; HV sub transmission feeders/network -radial or loop; transformers with HV windings and fixed tap; transformers with HV windings and on-load tap changers; HV busbars - indoor and/or outdoor as applicable to enterprise; HV isolators; HV switchgear (applicable to enterprise equipment); switching instructions (applicable to enterprise equipment); computers (applicable to enterprise equipment); network diagrams (applicable to enterprise equipment); access authorities; regulatory requirements
The following constants and variables included in the Element/Performance Criteria in this unit are fully described in the Definitions Section 1 of this volume and form an integral part of the Range Statement of this unit:

Appropriate and relevant persons (see Personnel)
Appropriate authorities
Appropriate work platform
Assessing risk
Assessment
Authorisation
Confined space
Diagnostic, testing and restoration
Documenting detail work events, record keeping and or storage of information
Drawings and specifications
Emergency
Environmental and sustainable energy procedures
Environmental legislation
Environmental management documentation
Established procedures
Fall prevention
Hazards
Identifying hazards
Inspect
Legislation
MSDS
Notification
OHS practices
OHS issues
Permits and/or permits to work
Personnel
Quality assurance systems
Requirements
Testing procedures
Work clearance systems
EVIDENCE GUIDE
9) This provides essential advice for assessment of the competency standard unit and must be read in conjunction with the Performance Criteria and the Range Statement of the competency standard unit and the Training Package Assessment Guidelines.
The Evidence Guide forms an integral part of this Competency Standard Unit and shall be used in conjunction with all component parts of this unit and, performed in accordance with the Assessment Guidelines of this Training Package.
Overview of Assessment
9.1)
Longitudinal competency development approaches to assessment, such as Profiling, require data to be reliably gathered in a form that can be consistently interpreted over time. This approach is best utilised in Apprenticeship programs and reduces assessment intervention. It is the Industry's preferred model for apprenticeships. However, where summative (or final) assessment is used it is to include the application of the competency in the normal work environment or, at a minimum, the application of the competency in a realistically simulated work environment. It is recognised that, in some circumstances, assessment in part or full can occur outside the workplace. However, it must be in accord with Industry and, Regulatory policy in this regard.
Methods chosen for a particular assessment will be influenced by various factors. These include the extent of the assessment, the most effective locations for the assessment activities to take place, access to physical resources, additional safety measures that may be required and the critical nature of the competencies being assessed.
The critical safety nature of working with electricity, electrical equipment, gas or any other hazardous substance/material carries risk in deeming a person competent. Hence, sources of evidence need to be 'rich' in nature so as to minimise error in judgment.
Activities associated with normal every day work have a bearing on the decision as to how much and how detailed the data gathered will contribute to its 'richness'. Some skills are more critical to safety and operational requirements while the same skills may be more or less frequently practiced. These points are raised for the assessors to consider when choosing an assessment method and developing assessment instruments. Sample assessment instruments are included for Assessors in the Assessment Guidelines of this Training Package.
Critical aspects of evidence required to demonstrate competency in this unit
9.2)
Before the critical aspects of evidence are considered all prerequisites shall be met.
Evidence for competence in this unit shall be considered holistically. Each Element and associated Performance Criteria shall be demonstrated on at least two occasions in accordance with the "Assessment Guidelines - UET09". Evidence shall also comprise:
A representative body of Performance Criteria demonstrated within the timeframes typically expected of the discipline, work function and industrial environment. In particular this shall incorporate evidence that shows a candidate is able to:

Implement Occupational Health and Safety workplace procedures and practices including the use of risk control measures as specified in the Performance Criteria and range; and
Apply sustainable energy principles and practices as specified in the Performance Criteria and range; and
Demonstrate an understanding of the essential knowledge and associated skills described in this unit to such an extent that the learner's performance outcome is reported in accordance with the preferred approach; namely a percentile graded result, where required by the regulated environment; and
Demonstrate an appropriate level of employability skills; and
Conduct work observing the relevant Anti Discrimination legislation, regulations, policies and workplace procedures; and

Demonstrated performance across a representative range of contexts from the prescribed items below:


Range of tools/equipment/materials/procedures/workplaces/other variables


Group No
The minimum number of items on which skill is to be demonstrated
Item List


A
Demonstrate at least three (3) switching programs that between them encompass the following:
A transformer with a HV winding and fixed tap
A transformer with a HV winding and on-load tap changer
HV busbars
HV isolators
HV switchgear (applicable to enterprise equipment)
Phasing and phase rotation
Commissioning an item of HV plant
A planned interruption to a HV customer/s
Installation of a mobile generators (if applicable to enterprise equipment)
Placing distribution feeders in parallel where special considerations are required to cope with capacitors, phase shifts between different bulk supply systems, sensitive earth fault protection, single phase switching.


B
Prepare switching instructions to isolate, test and earth all of the following
All enterprise transformer types
All enterprise busbar types
All enterprise feeder types
All enterprise circuit breakers, isolators or switches


C
Prepare, write and check switching sheets to do all of the following:
Manage load
Manage voltage
Minimise losses
Maximise network reliability


D
Do all of the following:
Check all above types of switching instructions
Coordinate all above types of switching instructions
Calculation of plant loading


E
At least one occasion
Dealing with an unplanned event by drawing on essential knowledge and associated skills to provide appropriate solutions incorporated in the holistic assessment with the above listed items.
Context of and specific resources for assessment
9.3)
This unit should be assessed as it relates to normal work practice using procedures, information and resources typical of a workplace. This should include:
OHS policy and work procedures and instructions.
Suitable work environment, facilities, equipment and materials to undertake actual the preparation of HV Distribution and Sub transmission Switching programs.
Note:
Access will be needed to: relevant protection, control, metering, and alarm equipment, network drawings, computerised electrical plant control and monitoring facilities, operational event data, enterprise operational policies, procedures and work practices and enterprise crisis management procedures.

In addition to the resources listed above, in Context of and specific resources for assessment, evidence should show demonstrated competency working in realistic environment and a variety of conditions.
Method of assessment
9.4)
This Competency Standard Unit shall be assessed by methods given in Volume 1, Part 3 "Assessment Guidelines".
Note:Competent performance with inherent safe working practices is expected in the Transmission, Distribution and Rail Traction Industry. This requires that the specified essential knowledge and associated skills are assessed in a structured environment which is primarily intended for learning/assessment and incorporates all necessary equipment and facilities for learners to develop and demonstrate the essential knowledge and associated skills described in this unit.
Concurrent assessment and relationship with other units
9.5)
For optimisation of training and assessment effort, competence in this unit may be assessed concurrently with units:
UETTDRSO06B
Develop LV distribution switching programs

UETTDRSO08B
Develop and evaluate Transmission switching programs
Replaced By
State Code National Code Title Type
WD754 UETTDRSO37A Develop high voltage distribution and subtransmission switching programs Unit of competency
State Code National Code Title Type
W725 UET60109 Advanced Diploma of ESI - Power Systems Qualification
W724 UET50109 Diploma of ESI - Power Systems Qualification