Unit of competency Outline

Date retreived
22/07/2026 11:39 PM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Manufacture stair components for curved and geometric stairs

Manufacture stair components for curved and geometric stairs

Unit of competency
National Code
CPCCJS3005
State Code
OCO46
TGA Status
Current
DTWD Status
Approved
Current Release Number
2.00
Current Release Date
24/12/2024
State Implementation and Classification
Approved Date
01/06/2021
Field of Education
030101 - Manufacturing Engineering
Original Release Date
01/06/2021
Nominal Hours
56
Description
This unit of competency specifies the skills and knowledge required to prepare, cut, join and install stair components for curved and geometric stairs to a specified design and finish, meeting all relevant requirements of the National Construction Code (NCC), Australian Standards, work health and safety (WHS), and Commonwealth and state or territory legislation. The unit includes manufacture, finishing and preassembly of stringers, stair posts, newel posts, treads, risers and balustrades.Completion of the general construction induction training program specified by the model Code of Practice for Construction Work is required for any person who is to carry out construction work. Achievement of CPCWHS1001Prepare to work safely in the construction industry meets this requirement.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Plan and prepare.
  • 1.1 Read and interpret work instructions and plan sequence of work.
  • 1.2 Plan all work to comply with laws and regulations, the National Construction Code (NCC), Australian Standards, work health and safety (WHS) and environmental requirements, manufacturers’ specifications, workplace requirements, drawings and specifications.
  • 1.3 Select tools and equipment, check for serviceability and report any faults.
  • 1.4 Select and use personal protective equipment (PPE) for each part of the task.
  • 1.5 Inspect work site, locate services, assess hazards and apply risk controls, including required signage and barricades.
  • 1.6 Select materials required for task, calculate quantities, handle safely and prepare and position ready for use.
2 Manufacture stringers for geometric curves.
  • 2.1 Prepare material to designed structural requirements.
  • 2.2 Construct curved wall or profile to curve design of stair.
  • 2.3 Set out developed pitch to curved wall or profile location.
  • 2.4 Manufacture and set out stringer to curved wall measurements and specifications.
3 Prepare stringers for assembly.
  • 3.1 Set out closed stringer for treads and risers with nosing marked accurately, housings cut to set out and depth.
  • 3.2 Prepare grooves or mortises to receive balusters.
  • 3.3 Prepare cut stringer to set-out shape and mark to accommodate treads and risers and junction with newel posts or landing.
4 Set out and manufacture post for spiral stairs.
  • 4.1 Set out spiral stairs to specifications.
  • 4.2 Manufacture or dress post to designed shape and set out to designed requirements of stair.
  • 4.3 Cut and make housings accurately to set-out and required depth.
5 Prepare newel posts for assembly.
  • 5.1 Cut and make housings to newel set out and required depth.
  • 5.2 Cut and make mortises to set out and required depth, and mark newel posts for identification.
6 Cut treads, risers and wedges to length and shape.
  • 6.1 Cut treads to designed length and shape.
  • 6.2 Cut risers to designed shape, length and requirement for junction with stringer.
  • 6.3 Mark wedges to design and cut to shape and quantity.
7 Prepare balustrade components.
  • 7.1 Manufacture handrail with groove run and mortises for balusters made to set out.
  • 7.2 Cut balusters to designed length.
  • 7.3 Cut handrail length and mark sections for identification.
8 Finish surface and preassemble stair.
  • 8.1 Sand exposed surfaces of components to specification and check components for fit.
  • 8.2 Preassemble components to ensure stair will assemble appropriately.
  • 8.3 Disassemble components and stack for transportation.
9 Clean up.
  • 9.1 Clean up, meeting all legislative and workplace requirements for safety, waste disposal and materials handling.
  • 9.2 Check, maintain and store tools and equipment and report any faults.
No information
No information
Replaces
State Code National Code Title Type
W9420 CPCCJS3005A Manufacture stair components for curved and geometric stairs Unit of competency
State Code National Code Title Type
BGD6 CPC31920 Certificate III in Joinery Qualification