Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Direct pile driving operations

Direct pile driving operations

Unit of competency
National Code
RIICFW306D
State Code
WH097
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
2.00
Current Release Date
07/12/2014
State Implementation and Classification
Approved Date
29/05/2014
Field of Education
030717 - Plant And Machine Operations
Original Release Date
29/05/2014
Nominal Hours
20
Description
This unit describes a participant’s skills and knowledge required to direct pile driving operations in Civil Construction.This unit is appropriate for those working in operational roles. No licensing or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1. Plan and prepare to assist with pile driving operations
  • 1.1 Access, interpret and apply documentation to direct pile driving operations and ensure the work activity is compliant
  • 1.2 Obtain, interpret, clarify and confirm work instructions and resolve coordination requirements before proceeding
  • 1.3 Obtain platform certification
  • 1.4 Confirm and apply environmental protection and safety requirements
  • 1.5 Select and wear correct personal protective equipment appropriate for work activities
  • 1.6 Obtain, interpret and implement traffic management signage requirements
  • 1.7 Select and check for faults, plant, tools and equipment to carry out tasks
  • 1.8 Identify, address and report environmental issues, potential hazards and risks
  • 1.9 Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency
2. Assisting with locating pile position and establishing the piling rig
  • 2.1 Establish the location for piles from reference points and set out
  • 2.2 Establish recovery pegs and conduct on-going measurements to ensure the correct location
  • 2.3 Direct the establishment of plant and related equipment in position and conduct pre-start checks
  • 2.4 Prepare and check pile for conformity with work instructions
  • 2.5 Identify and protect area for pile driving and surrounding working space
3. Support the piling process
  • 3.1 Provide guidance for lifting and manoeuvring of piles into position
  • 3.2 Provide guidance for setting up piling rig and driving pile into place
  • 3.3 Direct the splicing or jointing
4. Carryout post-operational requirements
  • 4.1 Assist with dismantling of plant and related equipment
  • 4.2 Provide direction for relocation of piling rig
  • 4.3 Clear work area and dispose of or recycle materials
  • 4.4 Clean, check, maintain and store plant, tools and equipment
No information
No information
Replaces
State Code National Code Title Type
WB263 RIICFW306A Direct pile driving operations Unit of competency
Replaced By
State Code National Code Title Type
OCX19 RIICFW306E Direct pile driving operations Unit of competency