Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Conduct concrete road paver operations
Conduct concrete road paver operations
Unit of competency
National Code
RIICRC311
RIICRC311
State Code
WC330
WC330
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
16/08/2012
Field of Education
030901 - Construction Engineering
Original Release Date
16/08/2012
Nominal Hours
60
Description
This unit covers the conduct of concrete road paver operations in the civil construction industry. It includes planning and preparing, setting up concrete road paver, operating concrete road paver, carrying out operator maintenance, relocating paver, and cleaning up. Licensing, legislative, regulatory and certification requirements that apply to this unit can vary between states, territories and industry sectors. Relevant information must be sourced prior to application of the unit.
Notes
Elements and Performance Criteria
1. Plan and prepare for operations
- 1.1 Access, interpret and apply compliance documentation relevant to the work activity
- 1.2 Obtain and confirm safety requirements from the site safety plan and organisational policies and procedures, and apply to the allotted task
- 1.3 Identify, obtain and implement signage requirements from the project traffic management plan
- 1.4 Select plant,tools and equipment to carry out tasks consistent with the requirements of the job, check for serviceability and rectify or report any faults
- 1.5 Identify environmental protection requirements from the project environmental management plan, and confirm and apply to the allotted task
- 1.6 Identify type of pavement required
2. Set up concrete road paver
- 2.1 Set up paver width and settings in accordance with job specification and plans
- 2.2 Use paving drawings and survey markings to establish work area
- 2.3 Conduct pre-start and maintenance checks within worksite and manufacturer’s specifications
3. Operate concrete road paver
- 3.1 Make adjustments to sensors and controls while paving
- 3.2 Use communication systems and hand signals within workplace specifications
- 3.2 Operate paver within machinery guidelines and job specifications
- 3.3 Complete shut-down and park-up procedures as per machine and site instructions
- 3.4 Complete required documentation and report concerns to appropriate personnel
4. Clean up
- 4.1 Conduct wash down procedures within worksite and manufacturer’s specifications
- 4.2 Clean up work area and dispose of or recycle materials in accordance with the project environment management plan
- 4.3 Clean, check, maintain and store plant and tools
Relevant compliance documentation may include:
legislative, organisational and site requirements and procedures
manufacturer’s guidelines and specifications
Australian standards
Employment and workplace relations legislation
Equal Employment Opportunity and Disability Discrimination legislation
Safety requirements may include:
OHS requirements in accordance with state or territory legislation and regulations, organisational safety policies and procedures, and project safety plan, including protective clothing and equipment, use of tools and equipment, workplace environment and safety, handling of materials, use of fire fighting equipment, use of first aid equipment, hazard control and hazardous materials and substances
safe operating procedures including recognising and preventing hazards associated with high voltage power lines, uneven/unstable terrain, trees, overhead service lines, bridges, surrounding buildings, obstructions, structures, facilities, dangerous materials, recently filled trenches, other machines, personnel, traffic control, working at heights, working in proximity to others, worksite visitors and the public
safe parking practices including ensuring access ways are clear, visibility is maintained and blind spots are avoided, equipment/machinery is away from overhangs and refuelling sites, safe distances are kept from excavations, and areas secured from unauthorised access or movement
safety supports are certified and within manufacturer’s recommendations
recognising hazards and risks including uneven/unstable terrain, trees, fires, overhead and underground services, bridges, buildings, excavations, traffic, embankments, cuttings, structures and hazardous materials
emergency procedures related to equipment operation including emergency shutdown and stopping, extinguishing equipment fires, organisational first aid requirements and evacuation
Site may include:
formed/prepared roads
barriers
parapets
airport runways
factory floors
reinforced foundations
pads
highways
freeways
car parks
container yards
hard stands
footpaths and bikeways
Task may include:
formation within recommended lateral tilt values
mixing and spreading granular materials
spreading concrete materials
mixing and spreading stabilised materials
Traffic may include:
high speed freeways and highways
rail corridors
commercial estates
egress and ingress locations
congested urban environments
low traffic rural areas
off-road un-trafficked areas
parking sites
pedestrian areas
Plant, tools and equipment may include:
shovels
safety supports
material placing equipment
agitator tools
tippers and dump trucks
measuring tapes
depth gauges
standard tool kits
string lines
thermometers
straight edges
operator manuals
communication equipment
GPS systems
Environmental protection requirements may include:
organisational/project environmental management plan
waste management
water quality protection
noise
vibration
dust and clean-up management
spill kit
fuels, oils, hydraulic fluids
Types of pavement may include:
no - fines
kerb - gutter
base
sub-base
type F barrier
shoulder
continuous reinforced concrete pavement
Communication systems may include:
two-way radios
mobile phones
hand signals
traffic control signals
fixed warning signs
legislative, organisational and site requirements and procedures
manufacturer’s guidelines and specifications
Australian standards
Employment and workplace relations legislation
Equal Employment Opportunity and Disability Discrimination legislation
Safety requirements may include:
OHS requirements in accordance with state or territory legislation and regulations, organisational safety policies and procedures, and project safety plan, including protective clothing and equipment, use of tools and equipment, workplace environment and safety, handling of materials, use of fire fighting equipment, use of first aid equipment, hazard control and hazardous materials and substances
safe operating procedures including recognising and preventing hazards associated with high voltage power lines, uneven/unstable terrain, trees, overhead service lines, bridges, surrounding buildings, obstructions, structures, facilities, dangerous materials, recently filled trenches, other machines, personnel, traffic control, working at heights, working in proximity to others, worksite visitors and the public
safe parking practices including ensuring access ways are clear, visibility is maintained and blind spots are avoided, equipment/machinery is away from overhangs and refuelling sites, safe distances are kept from excavations, and areas secured from unauthorised access or movement
safety supports are certified and within manufacturer’s recommendations
recognising hazards and risks including uneven/unstable terrain, trees, fires, overhead and underground services, bridges, buildings, excavations, traffic, embankments, cuttings, structures and hazardous materials
emergency procedures related to equipment operation including emergency shutdown and stopping, extinguishing equipment fires, organisational first aid requirements and evacuation
Site may include:
formed/prepared roads
barriers
parapets
airport runways
factory floors
reinforced foundations
pads
highways
freeways
car parks
container yards
hard stands
footpaths and bikeways
Task may include:
formation within recommended lateral tilt values
mixing and spreading granular materials
spreading concrete materials
mixing and spreading stabilised materials
Traffic may include:
high speed freeways and highways
rail corridors
commercial estates
egress and ingress locations
congested urban environments
low traffic rural areas
off-road un-trafficked areas
parking sites
pedestrian areas
Plant, tools and equipment may include:
shovels
safety supports
material placing equipment
agitator tools
tippers and dump trucks
measuring tapes
depth gauges
standard tool kits
string lines
thermometers
straight edges
operator manuals
communication equipment
GPS systems
Environmental protection requirements may include:
organisational/project environmental management plan
waste management
water quality protection
noise
vibration
dust and clean-up management
spill kit
fuels, oils, hydraulic fluids
Types of pavement may include:
no - fines
kerb - gutter
base
sub-base
type F barrier
shoulder
continuous reinforced concrete pavement
Communication systems may include:
two-way radios
mobile phones
hand signals
traffic control signals
fixed warning signs
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The evidence required to demonstrate competency in this unit must be relevant to worksite operations and satisfy all of the requirements of the performance criteria, required skills and knowledge and the range statement of this unit and include evidence of the following:
knowledge of the requirements, procedures and instructions for conducting concrete road paver operations
implementation of requirements, procedures and techniques for the safe, effective and efficient completion of concrete road paver operations
working with others to undertake and complete concrete road paver operations that meets all of the required outcomes
consistent timely completion of concrete road paver operations that safely, effectively and efficiently meets the required outcomes
the conduct of paver operations are to be performed in a minimum of two different concrete types/surface types and are to include the mandatory tasks from the unit scope and cover as a minimum:
three longitudinal joints (of at least 100m) to be constructed to required thickness, uniformity, line and level, on both matching and unsupported edge in accordance with project specifications and/or work instructions
five occasions of straight paving (one of at least 100 linear metres) to required thickness, uniformity, line and level, on both matching and unsupported edge in accordance with project specifications and/or work instructions
one intersection to required thickness, uniformity, line and level, on both matching and unsupported edge in accordance with project specifications and/or work instructions
operations to include residential, commercial and highway projects
material delivery through the paver is to include manual and automatic control
prestart operations on the machine
pave off the stop end and pave on the form stop end
maintain edges both with and without boards
use and changes made to vibrators
end-of-day wash-up and washing down of the machine
correct use of the safety systems
demonstrate knowledge of plough and auger systems
monitoring of concrete height in boxes
Context of and specific resources for assessment
This unit must be assessed in the context of the work environment. Where personal safety or environmental damage are limiting factors, assessment may occur in a simulated environment provided it is realistic and sufficiently rigorous to cover all aspects of workplace performance, including task skills, task management skills, contingency management skills and job role environment skills.
Assessment of this competency requires typical resources normally used in a resources and infrastructure sector environment. Selection and use of resources for particular worksites may differ due to the site circumstances.
The assessment environment should not disadvantage the participant. For example, language, literacy and numeracy demands of assessment should not be greater than those required on the job.
Customisation of assessment and delivery environment to sensitively accommodate cultural diversity.
Aboriginal people and other people from a non English speaking background may have second language issues.
Where applicable, physical resources should include equipment modified for people with disabilities. Access must be provided to appropriate learning and/or assessment support when required.
Method of assessment
This unit may be assessed in a holistic way with other units of competency. The assessment strategy for this unit must verify required knowledge and skill and practical application using more than one of the following assessment methods:
written and/or oral assessment of the candidate’s required knowledge
observed, documented and/or first hand testimonial evidence of the candidate’s:
implementation of appropriate requirement, procedures and techniques for the safe, effective and efficient achievement of required outcomes
consistent achievement of required outcomes
first hand testimonial evidence of the candidate’s:
working with others to undertake and complete concrete road paver operations
Guidance information for assessment
Consult the SkillsDMC User Guide for further information on assessment including access and equity issues.
Overview of assessment
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The evidence required to demonstrate competency in this unit must be relevant to worksite operations and satisfy all of the requirements of the performance criteria, required skills and knowledge and the range statement of this unit and include evidence of the following:
knowledge of the requirements, procedures and instructions for conducting concrete road paver operations
implementation of requirements, procedures and techniques for the safe, effective and efficient completion of concrete road paver operations
working with others to undertake and complete concrete road paver operations that meets all of the required outcomes
consistent timely completion of concrete road paver operations that safely, effectively and efficiently meets the required outcomes
the conduct of paver operations are to be performed in a minimum of two different concrete types/surface types and are to include the mandatory tasks from the unit scope and cover as a minimum:
three longitudinal joints (of at least 100m) to be constructed to required thickness, uniformity, line and level, on both matching and unsupported edge in accordance with project specifications and/or work instructions
five occasions of straight paving (one of at least 100 linear metres) to required thickness, uniformity, line and level, on both matching and unsupported edge in accordance with project specifications and/or work instructions
one intersection to required thickness, uniformity, line and level, on both matching and unsupported edge in accordance with project specifications and/or work instructions
operations to include residential, commercial and highway projects
material delivery through the paver is to include manual and automatic control
prestart operations on the machine
pave off the stop end and pave on the form stop end
maintain edges both with and without boards
use and changes made to vibrators
end-of-day wash-up and washing down of the machine
correct use of the safety systems
demonstrate knowledge of plough and auger systems
monitoring of concrete height in boxes
Context of and specific resources for assessment
This unit must be assessed in the context of the work environment. Where personal safety or environmental damage are limiting factors, assessment may occur in a simulated environment provided it is realistic and sufficiently rigorous to cover all aspects of workplace performance, including task skills, task management skills, contingency management skills and job role environment skills.
Assessment of this competency requires typical resources normally used in a resources and infrastructure sector environment. Selection and use of resources for particular worksites may differ due to the site circumstances.
The assessment environment should not disadvantage the participant. For example, language, literacy and numeracy demands of assessment should not be greater than those required on the job.
Customisation of assessment and delivery environment to sensitively accommodate cultural diversity.
Aboriginal people and other people from a non English speaking background may have second language issues.
Where applicable, physical resources should include equipment modified for people with disabilities. Access must be provided to appropriate learning and/or assessment support when required.
Method of assessment
This unit may be assessed in a holistic way with other units of competency. The assessment strategy for this unit must verify required knowledge and skill and practical application using more than one of the following assessment methods:
written and/or oral assessment of the candidate’s required knowledge
observed, documented and/or first hand testimonial evidence of the candidate’s:
implementation of appropriate requirement, procedures and techniques for the safe, effective and efficient achievement of required outcomes
consistent achievement of required outcomes
first hand testimonial evidence of the candidate’s:
working with others to undertake and complete concrete road paver operations
Guidance information for assessment
Consult the SkillsDMC User Guide for further information on assessment including access and equity issues.
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| WH127 | RIICRC311D | Conduct concrete road paver operations | Unit of competency |