Unit of competency Outline

Date retreived
23/07/2026 12:42 AM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Fabricate and install sanitary stacks

Fabricate and install sanitary stacks

Unit of competency
National Code
CPCPSN3013A
State Code
D7493
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
19/05/2011
State Implementation and Classification
Approved Date
11/10/2011
Field of Education
040327 - Plumbing
Original Release Date
11/10/2011
Nominal Hours
24
Description
This unit of competency specifies the outcomes required to fabricate and install sanitary stacks for soil and waste discharges.
Notes
Elements and Performance Criteria
1. Prepare for work.
  • 1.1. Plans and specifications are obtained for the planned work activity.
  • 1.2. Safety (OHS) requirements associated with fabricating and installing sanitary plumbing systems, and workplace environmental requirements, are adhered to throughout the work.
  • 1.3. Quality assurance requirements are identified and adhered to in accordance with workplace requirements.
  • 1.4. Tasks are planned and sequenced in conjunction with others involved in or affected by the work and statutory and regulatory authority requirements.
  • 1.5. Tools and equipment for fabricating and installing sanitary plumbing systems, including personal protective equipment, are selected and checked for serviceability.
  • 1.6. Work area is prepared to support efficient planning, fabrication and installation of sanitary plumbing systems.
2. Identify installation requirements.
  • 2.1. Venting requirements are checked for compliance with requirements of relevant Australian standards, plans and specifications.
  • 2.2. Stack design and branch positions are checked for compliance with relevant Australian standards, authorities' requirements, job plans and specifications, and relevant information.
  • 2.3. Position of sanitary stacks is determined from plans, specifications, relevant Australian standards and site requirements and so as not to cause damage and interference to surrounding structures.
  • 2.4. Quantity and type of materials required are calculated from design drawings and specifications and comply with relevant Australian standards and local authorities' requirements.
  • 2.5. Allowances for fabrication and assembly are determined and transferred.
  • 2.6. Materials and equipment are identified, ordered and collected in accordance with workplace procedures.
  • 2.7. Materials and equipment are checked for compliance with relevant Australian standards, docket and order form, and for acceptable condition.
  • 2.8. Sustainability principles and concepts are applied to work preparation and application.
3. Fabricate, install and test pipe system.
  • 3.1. Plumbing system is set out to comply with job plans, specifications and relevant Australian standards.
  • 3.2. Fixings and supports are installed to manufacturer recommendations, relevant Australian standards, plans and specifications.
  • 3.3. Pipes are fabricated, installed and jointed in specified location in accordance with job plans, specifications and relevant Australian standards, without causing damage or distortion to pipework or surrounding environment and other services.
  • 3.4. Pipe system is tested to comply with relevant Australian standards and adjusted.
4. Clean up.
  • 4.1. Work area is cleared and materials disposed of, reused or recycled according to legislation, regulations, codes of practice and job specification.
  • 4.2. Tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and workplace procedures.
  • 4.3. Documentation is completed in accordance with workplace requirements.
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Safety (OHS) is to be in accordance with commonwealth, state and territory legislation and regulations and may include:
handling of materials
hazard control
personal protective clothing and equipment prescribed under legislation, regulations and workplace policies and practices
safe operating procedures, including recognising and preventing hazards associated with:
electricity
dirt mounds
hazardous materials and substances
other machines
recently filled trenches
surrounding structure and facilities
traffic control
trip hazards
underground services
use of tools and equipment
work site visitors and the public
working at heights
working in confined spaces
working in proximity to others
use of firefighting equipment
use of first aid equipment
workplace environment and safety.
Environmental requirements cover water quality management and may include:
clean-up protection
stormwater protection
waste management.
Quality assurance requirements may include:
Environment Protection Authority (EPA)
environment policy
internal company quality assurance policy and risk management strategy
International Standards Organisation
site safety plan
workplace operations and procedures.
Statutory and regulatory authorities include:
commonwealth, state and local authorities administering applicable Acts, regulations and codes of practice.
Tools and equipment may include:
dropsaw
hacksaw
hand and power tools
heating equipment
lifting and load shifting equipment, including:
chain blocks
elevated work platforms
forklifts
hand trolleys
hoists and jacks
restricted height scaffolding
rollers
measuring equipment
threading and bending equipment.
Information may include:
charts and hand drawings
diagrams or sketches
instructions issued by authorised organisational or external personnel
job drawings
manufacturer specifications and instructions
material safety data sheets (MSDS)
memos
organisation work specifications and requirements
regulatory and legislative requirements, particularly those pertaining to:
building codes
OHS and environmental requirements
plumbing regulations
relevant Australian standards
safe work procedures relating to fabricating and installing sanitary stacks
signage
verbal, written and graphical instructions
work bulletins
work schedules, plans and specifications.
Materials may include:
copper
polymer
cast iron
other approved materials.
Sustainability principles and concepts:
cover the current and future social, economic and environmental use of resources
may include:
appropriate component selection that has minimal environmental impact
efficient energy and water use
efficient use and recycling of material
correct handling of hazardous materials
disposal of waste material to ensure minimal environmental impact.
Plumbing systems may include:
elevated pipework
fully vented
fully vented modified
revass
single stack
single stack modified
other approved methods.
EVIDENCE GUIDE
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
This unit of competency could be assessed in the workplace or a close simulation of the workplace environment providing that simulated or project-based assessment techniques fully replicate plumbing and services workplace conditions, materials, activities, responsibilities and procedures.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of:
given instructions, locating, interpreting and applying relevant information, Australian standards and specifications to fabricate and install a sanitary stack for a residential building.
applying safety requirements throughout the work sequence, including electrical requirements and the use of personal protective clothing and equipment
as a minimum the ability to, given the plans and specifications, fabricate and install a sanitary stack system of plumbing, to connect future fixtures from two floor levels; fixtures are to include a WC, bath, basin, shower and floor waste gully at each floor with fabrication of at least two branches in copper tube (minimum of DN50), ensuring:
correct identification of location, design and details of proposed installation
correct selection and use of appropriate processes, tools and equipment
completing all work to specification
compliance with regulations, relevant Australian standards and organisational quality procedures and processes
application of sustainability principles and concepts
communicating and working effectively and safely with others.
Context of and specific resources for assessment
This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.
Assessment of essential underpinning knowledge will usually be conducted in an off-site context.
Assessment is to comply with relevant regulatory or Australian standards' requirements.
Resource implications for assessment include:
an induction procedure and requirement
realistic tasks or simulated tasks covering the minimum task requirements
relevant specifications and work instructions
tools and equipment appropriate to applying safe work practices
support materials appropriate to activity
workplace instructions relating to safe working practices and addressing hazards and emergencies
material safety data sheets
research resources, including industry related systems information.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Method of assessment
Assessment methods must:
satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package
include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
reinforce the integration of employability skills with workplace tasks and job roles
confirm that competency is verified and able to be transferred to other circumstances and environments.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice, with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.
Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
Replaces
State Code National Code Title Type
W9753 CPCPSN3003A Fabricate and install sanitary stacks Unit of competency
Replaced By
State Code National Code Title Type
WF959 CPCPSN3023A Fabricate and install sanitary stacks Unit of competency
State Code National Code Title Type
D411 CPC32411 Certificate III in Plumbing Qualification