Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Complete equipment and software upgrades

Complete equipment and software upgrades

Unit of competency
National Code
ICTTEN4076A
State Code
D3458
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
15/06/2010
State Implementation and Classification
Approved Date
15/04/2014
Field of Education
031307 - Communications Technologies
Original Release Date
15/04/2014
Nominal Hours
80
Description
This unit describes the performance outcomes, skills and knowledge required to upgrade telecommunications equipment and software in service provider networks and customer premises.This unit may apply to switching, transmission, radio and computer networks using cable, optical fibre, radio, microwave and satellite transmission.Computer networks include local area networks (LAN) and wide area networks (WAN) and internet protocol (IP) based equipment of the Next Generation Networks (NGN).No licensing, legislative, regulatory or certification requirements apply to this unit at the time of endorsement but users should confirm requirements with the relevant federal, state or territory authority.
Notes
Elements and Performance Criteria
1. Prepare for the upgrade activity
  • 1.1. Obtain relevant legislation, codes, regulations and standards for compliance when conducting work
  • 1.2. Notify customer for site access, security arrangements and location details of equipment for upgrade
  • 1.3. Identify site hazards and notify appropriate personnel to make site safe
  • 1.4. Prepare an upgrade plan against work order and seek approval from customer
  • 1.5. Organise system back up from support personnel
  • 1.6. Obtain tools and test equipment and check for accuracy and safety
  • 1.7. Allocate specific tasks according to the skill mix of staff involved
  • 1.8. Run test plan on current equipment and identify and rectify problems in consultation with planners
  • 1.9. Complete functional testing of new systems and equipment prior to upgrade to minimise system downtime
  • 1.10. Analyse test results to predict compatibility and interoperability issues of equipment and systems prior to the upgrade work
2. Undertake upgrade
  • 2.1. Implement upgrade according to design specification following occupational health and safety (OHS) and environmental requirements
  • 2.2. Follow procedures for upgrade of network in sequential order as defined in instruction manuals
  • 2.3. Monitor progress of upgrade periodically to ensure that plans in relation to time and duration are being met
  • 2.4. Notify planner of problems encountered with detail as to the impact of the problem on the upgrade plan
  • 2.5. Abort upgrade and implement contingency plan should an upgrade plan not be realised without major disruption to network
  • 2.6. Monitor system response during upgrade and take action according to instructions provided
3. Test upgrade for acceptance
  • 3.1. Undertake tests according to the predetermined test plan
  • 3.2. Analyse test results and verify against specified performance levels
  • 3.3. Escalate problems encountered according to enterprise policy
  • 3.4. Invoke reversion procedure to pre-upgrade state, if directed by planners, according to enterprise policy
  • 3.5. Record upgrade test results and provide to network management group
  • 3.6. Run post-upgrade routines according to documented procedures
4. Monitor post-upgrade performance
  • 4.1. Conduct ongoing tests to ensure success of upgrade
  • 4.2. Monitor relevant alarms to measure impact of upgrade
  • 4.3. Review customer complaints to assess impact of upgrade on customer satisfaction
5. Finalise administrative work and clean up worksite
  • 5.1. Complete relevant work documentation and administrative tasks according to enterprise policy
  • 5.2. Amend site records to show upgraded equipment layout
  • 5.3. Organise customer training in the new or modified system
  • 5.4. Clean up and restore site to customer satisfaction
  • 5.5. Collect and dispose of waste material and debris according to environmental requirements
  • 5.6. Declare asset ready for use
  • 5.7. Notify customer of upgrade job completion to obtain sign off of work order and present with a copy of documentation
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Relevant legislation, codes, regulations and standards may include:
Australian Construction Industry Forum (ACIF) standards and codes
AS Communications Cabling Manual (CCM) Volume 1
AS/NZS 3000:2007
AS/NZS 3080:2003
AS/NZS 3084:2003
AS/NZS 3085.1:2004
AS/NZS IEC 61935.1:2006
AS/NZS IEC 61935.2:2006
AS/NZS ISO/IEC 14763.3:2007
AS/NZS ISO/IEC 15018:2005
AS/NZS ISO/IEC 24702:2007
cabling security codes and regulations
Environmental Protection Acts
OHS Acts
technical standards AS/ACIF S008:2006 and AS/ACIF S009:2006.
Customer may be:
asset manager
contractor
network planner
nominated customer representative
project manager
service provider.
Equipment may include:
Core and Access network:
cellular mobile network
dense wavelength division multiplexing (DWDM) network
gateway router
IP-Core Network
mesh network
multiprotocol label switching (MPLS) router
network server
optical network
satellite network
switching equipment
transmission equipment
worldwide interoperability for microwave access (WiMAX) network
customer network:
alarms systems
IP private branch exchange (PBX)
IP PBX server
IP security systems
Internet protocol TV (IPTV)
LAN:
data switch
router
server
network management addition
PBX
session initiation protocol (SIP)-enabled UC system
video conferencing equipment
voice over internet protocol (VoIP) gateway
WiMAX CPE.
Upgrade may include:
network capacity upgrade
network major software upgrade
network services upgrade
network technology upgrade
system integration.
Hazards may include:
building debris
earth potential rise (EPR):
event at a site, such as an electrical distribution substation, may expose telecommunications personnel, users or plant to hazardous voltages
glass fibre
live power lines
manual handling
mud and water
natural gas and other gas build up
optical fibre cable may contain hazardous light
radio frequency (RF) equipment emitting radiation
remote power feeding services which operate at above telecommunications network voltage (TNV)
vermin.
Upgrade plan may include:
access and security arrangements
after hours access
contingencies
contingency plans
customers communication priorities
customers communications needs
downtime
installation of backup equipment
provision of temporary services
test plans
testing procedures
timing and disruption to services.
Support personnel may include:
help desk
IT support
network operations support
vendor backup.
Test equipment may include:
communication testers
frequency analysers
microwave link analysers
network analyser
protocol analyser
spectrum analysers
traffic analyser
transmission measuring sets.
Test may include:
ability to make and receive a call
configuration tests
diagnostic tests
programme checks
routing tests
software tests
switching tests
traffic measurement test
transmission tests.
Upgrade work may include:
commission of new system
installation of new additional equipment
installation of new software
integration of new equipment into existing system
provision of temporary service
removal of redundant equipment
test on new system.
OHS and environmental requirements may relate to:
decommissioning and isolating worksite and lines prior to commencement
identifying other services, including power and gas
personal protective clothing:
earmuffs
gloves
head protection
kneepads
masks
protective suits
safety boots
safety glasses
safe working practices, such as the safe use and handling of:
asbestos
chemicals
materials
tools and equipment
work platforms
special access requirements
suitable light and ventilation
environmental considerations:
clean-up protection
stormwater protection
waste management.
Progress of upgrade may include:
rate of deliverables against project timeline
risk management
timing.
Contingency plan may:
be developed as part of the upgrade planning and design
be escalated and referred to more specialist team
invoke partial upgrade to be continued at later stage
invoke reversion procedure to pre-update condition.
Documentation may include:
configuration details
implementation and testing procedures
network impact statement
software test results
system updates
test results and recommendations
upgrade details
vendor, equipment and enterprise specific details.
EVIDENCE GUIDE
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
Evidence of the ability to:
analyse the implications of hardware and software upgrade on the remainder of the network
plan and identify the components of the upgrade process
prepare an upgrade plan and organise system backup
run test plan and analyse test results
implement upgrade and monitor progress of upgrade periodically using both vendor and enterprise specific monitoring tools
implement contingency plan
escalate problems encountered according to enterprise policy
analyse alarms and alarm conditions
review customer complaints to assess impact of upgrade.
Context of, and specific resources for assessment
Assessment must ensure:
site where upgrade may be conducted
use of equipment, software, test and monitoring equipment currently used in industry
relevant regulatory, equipment, enterprise and vendor documentation that impacts on work activities.
Methods of assessment
A range of assessment methods should be used to assess practical skills and knowledge. The following examples are appropriate for this unit:
direct observation of the candidate performing upgrade
direct observation of the candidate performing tests and monitoring alarms
review of documents prepared by the candidate providing upgrade plan and assessing impact of upgrade taking into consideration customer feedback
oral or written questioning to assess knowledge of upgrade, testing and monitoring procedures.
Guidance information for assessment
Holistic assessment with other units relevant to the industry sector, workplaces and job role is recommended, for example:
ICTTEN4073A Cut over customer premises equipment major upgrades
ICTTEN4086A Undertake routine maintenance of the telecommunications network.

Aboriginal people and other people from a non-English speaking background may have second language issues.

Access must be provided to appropriate learning and assessment support when required.

Assessment processes and techniques must be culturally appropriate, and appropriate to the oral communication skill level, and language and literacy capacity of the candidate and the work being performed.

In all cases where practical assessment is used it will be combined with targeted questioning to assess required knowledge. Questioning techniques should not require language, literacy and numeracy skills beyond those required in this unit of competency.

Where applicable, physical resources should include equipment modified for people with special needs.
Replaced By
State Code National Code Title Type
AWD41 ICTTEN408 Complete equipment and software upgrades Unit of competency