Qualification Outline
22/07/2026 5:38 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Certificate IV in Electrical - Air Conditioning Split Systems
Certificate IV in Electrical - Air Conditioning Split Systems
UEE40520
BFQ3
Current
Approved
National Endorsed, State Implementation and Classification
Releases
| Release Version | Release Date | TGA Status | DTWD Status |
|---|---|---|---|
| 3.00 | 20/12/2022 | Current | Approved |
| 2.00 | 14/10/2021 | Replaced | Approved |
| 1.00 | 05/10/2020 | Replaced | Approved |
Description
This qualification covers competencies to select, install, commission, fault find and maintain electrical systems and equipment in buildings and premises and split air conditioning systems to a prescribed routine where the maximum plant capacity for each system does not exceed 18 kilowatt (kW). It includes regulatory requirements for purchasing and handling refrigerants for split systems.
Split systems include wall hung, floor and ceiling suspended, cassette and ducted fan coil split systems. This qualification excludes competencies required for service, repair, maintenance or the safe and proper installation of commercial refrigeration and air conditioning plant and equipment
No licensing, legislative or certification requirements apply to this qualification at the time of publication.
Schedule
Packaging Rules
A total of 450 weighting points comprising:- 290 core weighting points listed below; plus
- 160 general elective weighting points from the general elective units listed below.
Choose a total of 160 weighting points elective units from the list below, of which between 0 and 80 weighting points can be taken from Group A; and between 0 and 80 weighting points can be taken from Group B; and between 80 and 160 weighting points can be taken from Group C (or all electives units of 160 weighting points can be taken from Group C).
Up to 80 weighting points of the general elective units Group A, may be selected, with appropriate contextualisation, from any relevant nationally endorsed Training Package or accredited course, provided selected units contribute to the vocational outcome of the qualification. Previously assigned weighting points are listed in the UEE Electrotechnology Training Package Companion Volume Implementation Guide (CVIG), if not listed weighting points will be 10 points, unless directed from the Electrotechnology Industry Reference Committee (IRC).
There are units of competency within this qualification that contain pre-requisites. Units of competency that have a pre-requisite requirement are identified by an asterix symbol on training.gov.au (TGA). Refer directly to the units of competency to identify pre-requisite requirements to ensure all are complied with. A list of all pre-requisites is also provided in the UEE Pre-requisite Companion Volume.
Where imported units are selected, care must be taken to ensure all pre-requisite units specified are complied with.
1. Core Units
All core units must be completed.
| State Code | National Code | Title | Hours | Type |
|---|---|---|---|---|
| OCB37 | UEECD0010 | Compile and produce an energy sector detailed report | 54 | Unit of competency |
| OCA29 | UEERE0015 | Implement and monitor energy sector environmental and sustainable policies and procedures | 18 | Unit of competency |
| OCA17 | UEECD0024 | Implement and monitor energy sector WHS policies and procedures | 18 | Unit of competency |
| OCA01 | UEERA0049 | Install and start up single head split air conditioning and water heating heat pump systems | 63 | Unit of competency |
| OCB19 | UEECD0027 | Participate in development and follow a personal competency development plan | 18 | Unit of competency |
| OCB86 | UEERA0059 | Prepare and connect refrigerant tubing and fittings | 36 | Unit of competency |
| OBZ23 | UEERA0064 | Recover, pressure test, evacuate, charge and leak test refrigerants - split systems | 54 | Unit of competency |
2. Group A Imported and Common Elective Units
Between 0 and 80 weighting points can be taken from Group A.
Please refer to the packaging rules for the full details of available options
| State Code | National Code | Title | Hours | Type |
|---|---|---|---|---|
| OBX53 | UEECD0011 | Comply with scheduled and preventative maintenance program processes | 18 | Unit of competency |
| OCD34 | BSBOPS203 | Deliver a service to customers | 40 | Unit of competency |
| OBY02 | UEECO0002 | Maintain documentation | 18 | Unit of competency |
| OBU39 | ICTICT214 | Operate application software packages | 60 | Unit of competency |
| ODX74 | CPCWHS1001 | Prepare to work safely in the construction industry | 6 | Unit of competency |
| OCA56 | UEECD0035 | Provide basic instruction in the use of electrotechnology apparatus | 18 | Unit of competency |
| OCD26 | HLTAID009 | Provide cardiopulmonary resuscitation | 4 | Unit of competency |
| OBY92 | UEECO0015 | Provide quotations for installation or service jobs | 18 | Unit of competency |
| OBY79 | UEECO0017 | Source and purchase material/parts for installation or service jobs | 18 | Unit of competency |
3. Group B Qualification Elective Units
Between 0 and 80 weighting points can be taken from Group B.
Please refer to the packaging rules for the full details of available options.
| State Code | National Code | Title | Hours | Type |
|---|---|---|---|---|
| OBY46 | UEERA0007 | Apply safety awareness and legal requirements for flammable refrigerants | 9 | Unit of competency |
| OBZ75 | UEEIC0002 | Assemble, enter and verify operating instructions in microprocessor equipped devices | 18 | Unit of competency |
| OBZ15 | UEEIC0013 | Develop, enter and verify discrete control programs for programmable controllers | 54 | Unit of competency |
| OBY12 | UEERA0035 | Establish the basic operating conditions of air conditioning systems | 18 | Unit of competency |
| OBY11 | UEERA0036 | Establish the basic operating conditions of vapour compression systems | 54 | Unit of competency |
| OBZ69 | UEECS0033 | Use engineering applications software on personal computers | 36 | Unit of competency |
4. Group C Qualification Elective Units
Between 80 and 160 weighting points can be taken from Group C; or all 160 weighting points can be taken from Group C.
Please refer to the packaging rules for the full details of available options.
| State Code | National Code | Title | Hours | Type |
|---|---|---|---|---|
| OBY53 | UEERA0002 | Analyse the psychrometric performance of HVAC/R systems | 45 | Unit of competency |
| OBY52 | UEERA0003 | Analyse the thermodynamic performance of HVAC/R systems | 45 | Unit of competency |
| OBZ07 | UEEEL0029 | Conduct compliance inspection of LV electrical installations with demand exceeding 100 A per phase | 36 | Unit of competency |
| OBZ79 | UEEEL0030 | Conduct compliance inspection of single phase LV electrical installations | 54 | Unit of competency |
| OBX98 | UEECD0047 | Supervise and coordinate energy sector work activities | 36 | Unit of competency |
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| A136 | UEE40511 | Certificate IV in Electrical - Air-conditioning Split Systems | Qualification |
No information
Entry Requirements
The entry requirement for this qualification is:
UEE30820 Certificate III in Electrotechnology Electrician
or
a current ‘Unrestricted Electricians Licence’ or its equivalent issued in an Australian state or territory
and
a Trainee Refrigerant Handling Licence.