Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Inspect sub-floors
Inspect sub-floors
Unit of competency
National Code
LMFFC3001A
LMFFC3001A
State Code
W0193
W0193
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
09/12/2003
Field of Education
040321 - Floor Coverings
Original Release Date
09/12/2003
Nominal Hours
20
Description
Notes
Elements and Performance Criteria
No information
The Range Statement provides advice to interpret the scope and context of this unit of competency, allowing for differences between enterprises and workplaces. It relates to the unit as a whole and facilitates holistic assessment. The following variables may be present for this particular unit:
Floor inspection scope
This unit covers work involving the trade level inspection of timber and concrete floors and sub-floor areas in accordance with relevant Australian Standards to identify and notify on the suitability for floor coverings
It does not confer authority or, of itself, satisfy formal requirements which may be established by regulatory authorities or agencies
Unit context
OH&S requirements may include legislation, building codes, material safety management systems, hazardous substance and dangerous goods codes and local safe operating procedures
Work is carried out in accordance with legislative obligations, environmental legislation, relevant health regulations, manual handling procedures and organisation insurance requirements
Work requires individuals to demonstrate discretion, judgement and problem solving skills in inspecting and notifying suitability of sub-floors to receive floor coverings
Tools and equipment are to include:
3m straight edge
1.5m straight edge
150mm straight edge
spirit level
string line
chalk line
electrical resistance meter
tape measure
electric drill and masonry drill bits
Tools and equipment may include:
water/laser level
hygrometer
thermometer probe and acid and alkaline testing equipment
Materials
Timber strip flooring, construction sheet flooring, monolithic floors, above grade, on grade and below grade floor
Datum line checks
Datum line checks are used to confirm floor fall, dips and irregularities and finished floor height in relation to other floor coverings and door clearances
Timber flooring inspections are to include:
tests for moisture content
protruding nails
loose metal and other objects
cracked
loose or damaged boards
rotting
insect attack and cross flow ventilation
Concrete floor inspections are to include:
checks for any protruding obstacles
for cracks or damage and for moisture membrane existence
Inspection notifications are to cover:
the type of the inspection completed
testing methods used
findings of inspection
suggested remedies to any faults identified and recommendations for floor coverings or finishing
Personal protective equipment
Personal protective equipment is to include that prescribed under legislation, regulations and enterprise policies and practices
Information and procedures
Workplace procedures relating to the use and operation of tools and equipment
Workplace instructions, including job sheets, plans, drawings and designs
Workplace procedures relating to notification and communications
Manufacturers' instructions for the use of equipment and materials
Floor inspection scope
This unit covers work involving the trade level inspection of timber and concrete floors and sub-floor areas in accordance with relevant Australian Standards to identify and notify on the suitability for floor coverings
It does not confer authority or, of itself, satisfy formal requirements which may be established by regulatory authorities or agencies
Unit context
OH&S requirements may include legislation, building codes, material safety management systems, hazardous substance and dangerous goods codes and local safe operating procedures
Work is carried out in accordance with legislative obligations, environmental legislation, relevant health regulations, manual handling procedures and organisation insurance requirements
Work requires individuals to demonstrate discretion, judgement and problem solving skills in inspecting and notifying suitability of sub-floors to receive floor coverings
Tools and equipment are to include:
3m straight edge
1.5m straight edge
150mm straight edge
spirit level
string line
chalk line
electrical resistance meter
tape measure
electric drill and masonry drill bits
Tools and equipment may include:
water/laser level
hygrometer
thermometer probe and acid and alkaline testing equipment
Materials
Timber strip flooring, construction sheet flooring, monolithic floors, above grade, on grade and below grade floor
Datum line checks
Datum line checks are used to confirm floor fall, dips and irregularities and finished floor height in relation to other floor coverings and door clearances
Timber flooring inspections are to include:
tests for moisture content
protruding nails
loose metal and other objects
cracked
loose or damaged boards
rotting
insect attack and cross flow ventilation
Concrete floor inspections are to include:
checks for any protruding obstacles
for cracks or damage and for moisture membrane existence
Inspection notifications are to cover:
the type of the inspection completed
testing methods used
findings of inspection
suggested remedies to any faults identified and recommendations for floor coverings or finishing
Personal protective equipment
Personal protective equipment is to include that prescribed under legislation, regulations and enterprise policies and practices
Information and procedures
Workplace procedures relating to the use and operation of tools and equipment
Workplace instructions, including job sheets, plans, drawings and designs
Workplace procedures relating to notification and communications
Manufacturers' instructions for the use of equipment and materials
The Evidence Guide identifies the critical aspects, knowledge and skills to be demonstrated to confirm competency for this unit. This is an integral part of the assessment of competency and should be read in conjunction with the Range Statement.
Critical Aspects of Evidence
Interpret work order and locate and apply relevant information
Apply safe handling requirements for equipment, products and materials, including use of personal protective equipment
Follow work instructions, operating procedures and inspection practices to:
minimise the risk of injury to self and others
prevent damage to goods, equipment and products
maintain required production output and product quality
To complete a minimum of:
One timber floor inspection and written notification
One monolithic floor inspection and written notification
Work effectively with others
Modify activities to cater for variations in workplace contexts and environment
Underpinning Knowledge
The type, characteristics and defects of floor structures
The requirements for floor condition for floor coverings
The characteristics and requirements of sub-floor preparation
The methods of correcting defects
Workflow in relation to floor covering and inspection processes and procedures
Workplace safety system requirements related to floor inspection and floor covering
Underpinning Skills
Information. Collect, organise and understand information related to work orders, plans, and safety procedures
Communication. Communicate ideas and information to enable confirmation of work requirements and specifications, coordination of work with site supervisor, other workers and customers, and the notification of work outcomes and problems
Planning. Plan and organise activities including the preparation and layout of the worksite and the obtaining of equipment and materials to avoid any back tracking, workflow interruptions or wastage
Teamwork. Work with others and in a team by recognising dependencies and using cooperative approaches to optimise workflow and productivity
Mathematical ideas and techniques. Use mathematical ideas and techniques to correctly complete measurements, complete datum checks, calculate area and estimate material requirements
Solve problems. Use pre-checking and inspection techniques to anticipate inspection problems, avoid reworking and avoid wastage
Use of technology. Use workplace technology related to the inspection of floors including tools, equipment and measuring devices
Resource Implications
Range of floor types and conditions, test equipment, work order.
Method of Assessment
Assessment methods must confirm consistency of performance over time and in a range of workplace relevant contexts.
Assessment should be by direct observation of tasks and questioning on underpinning knowledge.
Assessment may be in conjunction with assessment of other relevant units of competency.
Context of Assessment
Assessment may occur on the job or in a workplace simulated facility with relevant floor inspection materials, work instructions and deadlines.
Key Competency Levels
NB:These levels do not relate to the Australian Qualifications Framework. They relate to the seven areas of generic competency that underpin effective workplace practices.
There are three levels available:
Level 1 where work is within set conditions and process
Level 2 where the management or facilitation of conditions or process is exercised; and
Level 3 where the design and/or development of conditions or process is required
Communicating ideas and information
(2)
Collecting analysing and organising information
(2)
Planning and organising activities
(2)
Working with others and in teams
(1)
Using mathematical ideas and techniques
(1)
Solving problems
(1)
Using technology
(1)
Critical Aspects of Evidence
Interpret work order and locate and apply relevant information
Apply safe handling requirements for equipment, products and materials, including use of personal protective equipment
Follow work instructions, operating procedures and inspection practices to:
minimise the risk of injury to self and others
prevent damage to goods, equipment and products
maintain required production output and product quality
To complete a minimum of:
One timber floor inspection and written notification
One monolithic floor inspection and written notification
Work effectively with others
Modify activities to cater for variations in workplace contexts and environment
Underpinning Knowledge
The type, characteristics and defects of floor structures
The requirements for floor condition for floor coverings
The characteristics and requirements of sub-floor preparation
The methods of correcting defects
Workflow in relation to floor covering and inspection processes and procedures
Workplace safety system requirements related to floor inspection and floor covering
Underpinning Skills
Information. Collect, organise and understand information related to work orders, plans, and safety procedures
Communication. Communicate ideas and information to enable confirmation of work requirements and specifications, coordination of work with site supervisor, other workers and customers, and the notification of work outcomes and problems
Planning. Plan and organise activities including the preparation and layout of the worksite and the obtaining of equipment and materials to avoid any back tracking, workflow interruptions or wastage
Teamwork. Work with others and in a team by recognising dependencies and using cooperative approaches to optimise workflow and productivity
Mathematical ideas and techniques. Use mathematical ideas and techniques to correctly complete measurements, complete datum checks, calculate area and estimate material requirements
Solve problems. Use pre-checking and inspection techniques to anticipate inspection problems, avoid reworking and avoid wastage
Use of technology. Use workplace technology related to the inspection of floors including tools, equipment and measuring devices
Resource Implications
Range of floor types and conditions, test equipment, work order.
Method of Assessment
Assessment methods must confirm consistency of performance over time and in a range of workplace relevant contexts.
Assessment should be by direct observation of tasks and questioning on underpinning knowledge.
Assessment may be in conjunction with assessment of other relevant units of competency.
Context of Assessment
Assessment may occur on the job or in a workplace simulated facility with relevant floor inspection materials, work instructions and deadlines.
Key Competency Levels
NB:These levels do not relate to the Australian Qualifications Framework. They relate to the seven areas of generic competency that underpin effective workplace practices.
There are three levels available:
Level 1 where work is within set conditions and process
Level 2 where the management or facilitation of conditions or process is exercised; and
Level 3 where the design and/or development of conditions or process is required
Communicating ideas and information
(2)
Collecting analysing and organising information
(2)
Planning and organising activities
(2)
Working with others and in teams
(1)
Using mathematical ideas and techniques
(1)
Solving problems
(1)
Using technology
(1)
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| W8582 | LMFFL3504A | Inspect defective timber flooring | Unit of competency |
| W8553 | LMFFL3101A | Inspect sub-floors | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| W021 | LMF20102 | Certificate II in Floor Covering and Finishing | Qualification |