Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Construct metal louvre and canopy-hooded style awnings

Construct metal louvre and canopy-hooded style awnings

Unit of competency
National Code
MSFBA2009
State Code
WI260
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
10/12/2013
State Implementation and Classification
Approved Date
19/06/2014
Field of Education
030199 - Manufacturing Engineering And Technology, N.e.c.
Original Release Date
19/06/2014
Nominal Hours
56
Description
This unit of competency covers constructing metal louvre and canopy-hooded style awnings. It applies to small to large scale enterprises.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Plan and prepare work
  • 1.1 Work health and safety (WHS) requirements, legislative requirements and workplace practices are observed throughout the work
  • 1.2 Personal protective equipment is selected and used
  • 1.3 Work orders are checked and confirmed
  • 1.4 Materials and hardware are selected and checked against work requirements
  • 1.5 Tools and equipment are selected and checked for safe operation
2 Cut stock and assemble awning
  • 2.1 Metal stock is cut to manufacturer recommendations
  • 2.2 Metal is bent to form shape of awning
  • 2.3 Awning is assembled to manufacturer specifications
3 Make quality checks
  • 3.1 Completed awnings are checked ensuring finished product matches work order
  • 3.2 Completed awning is tested within limits of normal operation for correct operation and parts of the work that do not comply with work order are repaired or re-worked
4 Complete work
  • 4.1 Finished work is cleaned, protected and stored following workplace practices
  • 4.2 Tools and equipment are cleaned, maintained and stored
  • 4.3 Faulty tools and equipment are reported to appropriate personnel
  • 4.4 Work area is cleaned and waste is disposed of according to workplace practices
  • 4.5 Workplace documentation is completed
No information
No information
Replaced By
State Code National Code Title Type
OEL34 MSFBA2014 Construct metal louvre and canopy-hooded style awnings Unit of competency