Unit of competency Outline

Date retreived
22/07/2026 8:58 PM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Construct metal louvre and canopy-hooded style awnings

Construct metal louvre and canopy-hooded style awnings

Unit of competency
National Code
MSFBA2014
State Code
OEL34
TGA Status
Current
DTWD Status
Approved
Current Release Number
1.00
Current Release Date
08/12/2022
State Implementation and Classification
Approved Date
19/04/2023
Field of Education
030199 - Manufacturing Engineering And Technology, N.e.c.
Original Release Date
19/04/2023
Nominal Hours
56
Description
This unit describes the skills and knowledge required to cut materials and prepare and assemble metal louvre and canopy-hooded style awnings. Workers with this competency interpret work documents and follow established procedures to complete work and check that it meets quality requirements prior to installation. No licensing or certification requirements exist at the time of publication. Relevant legislation, industry standards and codes of practice within Australia must be applied.
Notes
Elements and Performance Criteria
1. Plan and prepare task
  • 1.1 Identify task requirements from work documentation
  • 1.2 Identify and follow work health and safety requirements
  • 1.3 Select tools and equipment and check that they are safe and functional
  • 1.4 Select materials and hardware and check that they meet task quality requirements.
2. Cut stock and assemble awning
  • 2.1 Cut metal to manufacturer recommendations
  • 2.2 Bend metal to form shape of awning using appropriate equipment
  • 2.3 Assemble awning to specifications
3. Make quality checks
  • 3.1 Check finished awning against work documentation and test within limits of normal operation for correct operation
  • 3.2 Identify, repair or rework parts of the work that do not comply with work order
4. Complete work
  • 4.1 Clean and package completed work with required installation hardware and store in accordance with workplace procedures
  • 4.2 Clean, maintain and store tools and equipment in accordance with procedures and report any faulty tools and equipment to supervisor
  • 4.3 Clean work area and dispose of waste in accordance with workplace procedures
  • 4.4 Complete documentation in accordance with workplace procedures
No information
No information
Replaces
State Code National Code Title Type
WI260 MSFBA2009 Construct metal louvre and canopy-hooded style awnings Unit of competency