Unit of competency Outline
Date retreived
23/07/2026 1:07 AM AWST
23/07/2026 1:07 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Mount and wire control panel equipment
Mount and wire control panel equipment
Unit of competency
National Code
UEEAS0009
UEEAS0009
State Code
OCC45
OCC45
TGA Status
Current
Current
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
12/07/2021
Field of Education
031313 - Electrical Fitting, Electrical Mechanics
Original Release Date
12/07/2021
Nominal Hours
36
Description
This unit involves the skills and knowledge required to mount and wire control panel equipment. It includes working safely, following layout and circuit diagrams, selecting and mounting equipment, installing and terminating wiring, functional testing and completing necessary documentation.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Plan to mount and wire control panel equipment
- 1.1 Wire control panel equipment installation is determined and planned in accordance with job specifications, wiring and schematic diagrams
- 1.2 Work health and safety (WHS)/occupational health and safety (OHS) requirements and workplace procedures for a given work area are identified and applied
- 1.3 Work instructions, including layout and wiring diagrams, are applied in accordance with workplace procedures
- 1.4 Advice is sought from supervisor to ensure work is coordinated effectively with others
- 1.5 Materials required for the control panel work are obtained in accordance with workplace procedures
- 1.6 Tools, equipment and measuring devices required to carry out control panel work are obtained and checked for correct operation and safety in accordance with workplace procedures
2 Mount and wire control panel equipment
- 2.1 Control panel equipment and electrical hazards are identified, risks assessed and control measures implemented
- 2.2 Circuits are checked and isolated in accordance with WHS/OHS workplace requirements and procedures
- 2.3 Components are laid out in accordance with job specifications, wiring and schematic diagrams
- 2.4 Control panel components including switch gear, interconnecting plugs and sockets and earthing are fitted in accordance with work instructions, industry standards, manufacturer specifications and workplace procedures
- 2.5 Control panel wiring is installed in accordance with wiring and schematic diagrams, work instructions, industry standards, manufacturer specifications and workplace procedures
- 2.6 Regular quality checks are carried out in accordance with workplace procedures
- 2.7 Completed control panel is visually inspected and tested in accordance with workplace procedures, industry standards and manufacturer specifications
- 2.8 Labelling and cable numbering are undertaken in accordance with industry standards, wiring and schematic diagrams
- 2.9 Unplanned events are referred to supervisor for directions in accordance with workplace procedures
- 2.10 Work is carried out without waste of materials or damage to apparatus, the surrounding environment or services and using sustainable energy practices
3 Finalise and inspect control panel installation
- 3.1 Assembled control panel is tested against work instructions, industry standards and manufacturer specifications in accordance with workplace procedures
- 3.2 Problem-solving techniques are used, where corrective actions to assembled components are required, in accordance with regulatory requirements and industry standards
- 3.3 Work completion is documented and relevant person/s notified in accordance with workplace procedures
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| WC383 | UEENEEA113A | Mount and wire control panel equipment | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BFM8 | UEE62220 | Advanced Diploma of Electrical - Engineering | Qualification |
| BFK5 | UEE50420 | Diploma of Electrical Engineering | Qualification |
| BFM2 | UEE43020 | Certificate IV in Electrical Equipment and Systems | Qualification |
| BFO5 | UEE33020 | Certificate III in Electrical Fitting | Qualification |
| BFP6 | UEE53020 | Diploma of Electrical Systems Engineering | Qualification |
| BFK9 | UEE63020 | Advanced Diploma of Electrical Systems Engineering | Qualification |
| BFN2 | UEE40620 | Certificate IV in Electrotechnology - Systems Electrician | Qualification |
| BFN0 | UEE30820 | Certificate III in Electrotechnology Electrician | Qualification |
| BNY7 | UEE30725 | Certificate III in Switchgear and Controlgear | Qualification |
| BFJ0 | UEE30720 | Certificate III in Switchgear and Controlgear | Qualification |