Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Identify and treat risks

Identify and treat risks

Unit of competency
National Code
PSPGEN038
State Code
AWV65
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
07/03/2016
State Implementation and Classification
Approved Date
21/07/2016
Field of Education
080399 - Business And Management, N.e.c.
Original Release Date
21/07/2016
Nominal Hours
60
Description
This unit describes the skills required to identify and treat risk using the organisation’s risk management procedures and treatments. It applies to the risks inherent in all aspects of everyday work in the public sector as well as to specific functional activities and projects related to the particular mandate of the organisation. It includes establishing the risk context, analysing and evaluating risks and monitoring and reviewing the risk treatment plan.This unit applies to those working in generalist or specialist roles within the public sector.The skills and knowledge described in this unit must be applied within the legislative, regulatory and policy environment in which they are carried out. Organisational policies and procedures must be consulted and adhered to.Those undertaking this unit would work independently, performing complex tasks in a range of familiar and unfamiliar contexts.No licensing, legislative or certification requirements apply to unit at the time of publication.
Notes
Elements and Performance Criteria
1. Establish the risk context
  • 1.1 Establish the nature and extent of the work activity within the broader organisational context.
  • 1.2 Identify and document outcomes to be achieved.
  • 1.3 Analyse relationship between the activity and its environment and identify critical factors in the environment that may impact on the achievement of outcomes.
  • 1.4 Identify and consult stakeholders to understand their opinions, concerns and needs.
  • 1.5 Determine risk evaluation criteria for the activity.
2. Identify risks
  • 2.1 Select method/s for identifying risks in accordance with risk management policy and procedures, budgetary and time constraints relative to the type of activity to be undertaken.
  • 2.2 Identify and document sources of risk as required.
  • 2.3 Identify and record risk events related to each source of risk.
  • 2.4 Undertake consultation to ensure all possible risks are identified.
3. Analyse risks
  • 3.1 Analyse and rate the probability of identified risks occurring and consequences.
  • 3.2 Consider current control measures for any of the identified risks in the risk analysis, and analyse and include residual risks if necessary.
  • 3.3 Determine levels of risk in accordance with risk matrix used by the organisation.
  • 3.4 Consult as required to confirm risk levels, and document analysis.
4. Evaluate risks
  • 4.1 Evaluate risks by comparing the level of risk with risk evaluation criteria established at the beginning of the risk management process.
  • 4.2 Consider the importance of the activity, its outcomes and the degree of control over the risks.
  • 4.3 Consider potential and actual losses which may arise from the risk.
  • 4.4 Take into account benefits and opportunities presented by the risk.
  • 4.5 Identify risks as acceptable or unacceptable in accordance with risk evaluation criteria, and obtain approval.
  • 4.6 Prioritise unacceptable risks and document the reason/s for acceptance of risks.
5. Treat risks
  • 5.1 Determine options for treating risks.
  • 5.2 Select the best treatment option and undertake a cost-benefit analysis.
  • 5.3 Prepare, approve and communicate a risk treatment plan to those who will be involved in implementation.
  • 5.4 Negotiate changes required to operational structure, procedures or staffing in order to implement risk treatments.
  • 5.5 Organise resources and implement risk treatment plan.
6. Monitor and review risk treatment plan
  • 6.1 Monitor changes in the organisational environment and factors impacting on the organisation for their impact on risks and existing risk treatments.
  • 6.2 Monitor and adjust risk treatments for unacceptable risks as required.
  • 6.3 Monitor acceptable risks to ensure these risk levels do not increase over time.
  • 6.4 Consult and collect, analyse and use data relating to risks and risk treatments to improve risk management in own area of operation.
  • 6.5 Review risk treatment plan in accordance with timetable for review of plan and updated as required.
  • 6.6 Provide input into formal reviews of risk in the organisation to improve risk management outcomes.
No information
No information
Replaces
State Code National Code Title Type
C8027 PSPGOV417A Identify and treat risks Unit of competency
Replaced By
State Code National Code Title Type
ODW99 PSPGEN133 Identify and treat risks Unit of competency