Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Confirm transition strategy for new systems

Confirm transition strategy for new systems

Unit of competency
National Code
ICTICT520
State Code
OBU07
TGA Status
Current
DTWD Status
Approved
Current Release Number
1.00
Current Release Date
21/07/2020
State Implementation and Classification
Approved Date
15/01/2021
Field of Education
020305 - Systems Analysis And Design
Original Release Date
15/01/2021
Nominal Hours
10
Description
This unit describes the skills and knowledge required to confirm a transition strategy for new systems based on a revised system design and newly developed change management plan.The unit applies to those who work as part of a team in a range of information and communications technology (ICT) positions and who are required to plan for a transition to new system websites, networks or software.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1. Confirm delivery and acceptance plan
  • 1.1 Evaluate revised system design and change management plan
  • 1.2 Confirm phased delivery with client and project team
  • 1.3 Confirm method of acceptance and acceptance criteria
  • 1.4 Confirm that acceptance test plan is in place and agreed
2. Develop and confirm data take-up plan
  • 2.1 Identify data source for each database
  • 2.2 Analyse potential integrity constraints
  • 2.3 Design data conversion workflow
  • 2.4 Identify interface requirements, data take-up method, complexity and effort required
  • 2.5 Develop required data conversion contingencies and confirm with required personnel
3. Confirm cutover plan
  • 3.1 Agree on conversion window in operational timescale with required personnel
  • 3.2 Plan and confirm parallel running with required personnel
  • 3.3 Determine and confirm approval of dependencies with required personnel
  • 3.4 Determine and confirm approval of fall-back options with required personnel
  • 3.5 Confirm approval of checkpoints, tests and responsibilities with required personnel
  • 3.6 Confirm approval of resources, tasks and timescales with required personnel
No information
No information
Replaces
State Code National Code Title Type
AUU53 ICTICT504 Confirm transition strategy for a new system Unit of competency
State Code National Code Title Type
BFG0 ICT50120 Diploma of Information Technology Qualification
BGJ4 ICT50220 Diploma of Information Technology Qualification