Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Construct and dismantle fences and gates

Construct and dismantle fences and gates

Unit of competency
National Code
RIICCM301A
State Code
WB074
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
22/06/2011
State Implementation and Classification
Approved Date
19/01/2010
Field of Education
040301 - Building Science And Technology
Original Release Date
19/01/2010
Nominal Hours
32
Description
This unit covers the construction and dismantling of fences and gates in the civil construction industry. It includes planning and preparing, erecting fences, erecting gates and signage, removing and making good, and cleaning up. Licensing, legislative, regulatory and certification requirements that apply to this unit can vary between states, territories, and industry sectors. Relevant information must be sourced prior to application of the unit.
Notes
Elements and Performance Criteria
1. Plan and prepare
  • 1.1. Access, interpret and apply compliance documentation relevant to the work activity
  • 1.2. Obtain and confirm safety requirements from the site safety plan and organisational policies and procedures, and apply to the allotted task
  • 1.3. Identify, obtain and implement traffic control signage requirements from the project traffic management plan
  • 1.4. Select tools and equipment to carry out tasks consistent with the requirements of the job, check for serviceability and rectify or report any faults
  • 1.5. Identify environmental protection requirements from the project environmental management plan, and confirm and apply to the allotted task
2. Erect fences
  • 2.1. Set out fence line and post positions to requirements of plans and specifications
  • 2.2. Erect fence posts are erected in place and plumb to alignment
  • 2.3. Fix fence rails and/or wire, cladding or mesh to posts
  • 2.4. Maintain fencing and gates to completed construction condition
3. Erect gates and signage
  • 3.1. Fit and secure gates to requirements of site drawings, specifications and/or landowner requirements
  • 3.2. Install signage at entry gates in accordance with site safety plan and security requirements where specified
4. Remove and make good
  • 4.1. Dismantle fences and gates and remove them from land or site where specified
  • 4.2. Make area good to work specification
5. Clean up
  • 5.1. Clear work area and dispose of or recycle materials in accordance with project environmental management plan
  • 5.2. Clean, check, maintain and store tools and equipment t
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Relevant compliance documentation may include:
legislative, organisational and site requirements and procedures
manufacturer's guidelines and specifications
Australian standards
Employment and workplace relations legislation
Equal Employment Opportunity and Disability Discrimination legislation
Safety requirements may include:
OHS requirements in accordance with state or territory legislation and regulations, organisational safety policies and procedures, and project safety plan including: protective clothing and equipment, use of tools and equipment, workplace environment and safety, handling of materials, use of fire fighting equipment, use of First Aid equipment, hazard control and hazardous materials and substances
safe operating procedures including recognising and preventing hazards associated with high voltage power lines, uneven/unstable terrain, trees, overhead service lines, bridges, surrounding buildings, obstructions, structures, facilities, dangerous materials, recently filled trenches, other machines, personnel, traffic control, working at heights, working in proximity to others, worksite visitors and the public
safe parking practices including ensuring access ways are clear, equipment/machinery is away from overhangs and refuelling sites, safe distance from excavations, and secured from unauthorised access or movement
recognising hazards and risks including uneven/unstable terrain, trees, fires, overhead and underground services, bridges, buildings, excavations, traffic, embankments, cuttings, structures and hazardous materials
emergency procedures related to equipment operation including emergency shutdown and stopping, extinguishing equipment fires, organisational First Aid requirements and evacuation
Site locations may include:
new construction sites
on site locations
off site in an external paddock environment
existing fencing situations
Traffic control signage may include:
unit signage
escort vehicle
highway traffic signs
site safety signage
temporary signage for the benefit of motorists and pedestrians
traffic conditions signage
Traffic conditions may include:
congested urban environments
low traffic rural areas
off-road un-trafficked areas
buildings
parking sites
pedestrian areas
Tools and equipment may include:
measuring tapes
rulers
hammers
rammers
socket wrenches
fencing strainers
pliers and wire cutters
pop riveters
levelling equipment
docking saws
drop saws
jigs
stops
power drills
screwdrivers
bits and drills
clamps
squares
nail guns
Environmental protection requirements may include:
organisational/project environmental management plan
waste management
water quality protection
noise
vibration
dust
clean-up management
Erection of fences may include:
re-fence existing land owner properties where new civil works may have claimed land
prevention of potential accidents which may occur by unauthorised access on worksites
protection of valuable machinery
prevention of materials from being contaminated
Posts may be secured by:
cement footings
rammed
earth packed
Fencing and gates may include:
post, wire and droppers or metal mesh fences and gates
timber cladding fences and gates
Signage at entry gates may include:
site safety information
security access information
Materials may include:
fencing mesh
fencing wire
droppers
metal posts
metal rails
concrete fencing materials
anchor bolts
timber posts
rails
pickets
palings
cladding

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment

Critical aspects for assessment and evidence required to demonstrate competency in this unit
The evidence required to demonstrate competency in this unit must be relevant to worksite operations and satisfy all of the requirements of the performance criteria, required skills and knowledge and the range statement of this unit and include evidence of the following:
knowledge of the requirements, procedures and instructions for constructing and dismantling fences and gates
implementation of requirements, procedures and techniques for the safe, effective and efficient completion of the construction and dismantling of fences and gates
working with others to undertake and complete the construction and dismantling of fences and gates in a way that meets all of the required outcomes
consistent timely completion of the construction and dismantling of fences and gates that safely, effectively and efficiently meets the required outcomes
Context of and specific resources for assessment
This unit must be assessed in the context of the work environment. Where personal safety or environmental damage are limiting factors, assessment may occur in a simulated environment provided it is realistic and sufficiently rigorous to cover all aspects of workplace performance, including task skills, task management skills, contingency management skills and job role environment skills.
Assessment of this competency requires typical resources normally used in a resources and infrastructure sector environment. Selection and use of resources for particular worksites may differ due to the site circumstances.
The assessment environment should not disadvantage the participant. For example, language, literacy and numeracy demands of assessment should not be greater than those required on the job.
Customisation of assessment and delivery environment to sensitively accommodate cultural diversity.
Aboriginal people and other people from a non English speaking background may have second language issues.
Where applicable, physical resources should include equipment modified for people with disabilities. Access must be provided to appropriate learning and/or assessment support when required.
Method of assessment
This unit may be assessed in a holistic way with other units of competency. The assessment strategy for this unit must verify required knowledge and skill and practical application using more than one of the following assessment methods:
written and/or oral assessment of the candidate's required knowledge
observed, documented and/or first hand testimonial evidence of the candidate's:
implementation of appropriate requirement, procedures and techniques for the safe, effective and efficient achievement of required outcomes
consistent achievement of required outcomes
first hand testimonial evidence of the candidate's:
working with others to undertake and complete the construction and dismantling of fences and gates
Guidance information for assessment
Consult the SkillsDMC User Guide for further information on assessment including access and equity issues.

Replaces
State Code National Code Title Type
W1761 BCCCM3001B Construct and dismantle fences and gates Unit of competency
Replaced By
State Code National Code Title Type
WH088 RIICCM301D Construct and dismantle fences and gates Unit of competency
State Code National Code Title Type
W675 RII31109 Certificate III in Bridge Construction and Maintenance Qualification