Unit of competency Outline
Date retreived
23/07/2026 2:07 AM AWST
23/07/2026 2:07 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Use of routine equipment/plant/technologies in an electrotechnology environment
Use of routine equipment/plant/technologies in an electrotechnology environment
Unit of competency
National Code
UEENEEE041B
UEENEEE041B
State Code
W7841
W7841
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
19/10/2010
Field of Education
030717 - Plant And Machine Operations
Original Release Date
19/10/2010
Nominal Hours
54
Description
1)1.1) DescriptorThis unit covers routine tools, equipment and personnel protective equipment required to do work in the Electrotechnology environment, is used in accordance with the schedule of work to ensure work is completed in an agreed time, to a quality standard and with a minimum waste.
Notes
Elements and Performance Criteria
1 Prepare to use routine equipment, plant and technologies
- 1.1 Instructions in the use of routine equipment, plant or technologies are communicated and confirmed to ensure clear understanding.
- 1.2 OHS policies and procedures are communicated and confirmed to ensure they are understood as they apply in the carrying out of the work.
- 1.3 Tools, equipment and personnel protective equipment necessary for the work are identified, scheduled and checked to ensure they work correctly as intended and are safe to use in accordance with established procedures.
- 1.4 Appropriate personnel are consulted to ensure the work is coordinated effectively with others involved.
- 1.5 Resources and materials needed to do the work are confirmed, scheduled and obtained in accordance with established procedures.
- 1.6 Schedule of work including practices for working safely are confirmed in accordance with instructions and requirements.
2 Use routine equipment, plant and technologies
- 2.1 OHS policies and procedures and safe work practices are followed to eliminate or minimise incidents.
- 2.2 Routine equipment, plant or technologies are used in accordance with schedule of work to ensure work is completed in an agreed time, to a quality standard and with a minimum of waste.
- 2.3 Further instructions are sought from appropriate personnel in the event of unplanned happenings or conditions.
- 2.4 Ongoing checks of work quality are undertaken in accordance with instructions and requirements.
3 Complete use of routine equipment, plant and technologies
- 3.1 Final checks are made to ensure the use of routine equipment, plant or technologies conforms with instructions and to requirements.
- 3.2 Appropriate personnel are notified of completion of the work using routine equipment, plant or technologies.
- 3.3 Tools, equipment and any surplus resources and materials are, where appropriate, cleaned, checked and returned to storage in accordance with established procedures.
- 3.4 Work area is cleaned up and made safe and sustainable energy practices are followed.
- 3.5 Appropriate records are updated in accordance with instructions and established procedures.
No information
No information
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| WC435 | UEENEEE141A | Use of routine equipment/plant/technologies in an energy sector environment | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| W422 | UEE22007 | Certificate II in Electrotechnology (Career Start) | Qualification |
| W826 | UEE22010 | Certificate II in Electrotechnology (Career Start) | Qualification |
| 5671 | 51908 | Certificate I in Electrotechnology Pre-Apprentice Electrical | Accredited course |