Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Plan the electrical installation of integrated systems
Plan the electrical installation of integrated systems
Unit of competency
National Code
UEEIC0024
UEEIC0024
State Code
OBY98
OBY98
TGA Status
Current
Current
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
12/07/2021
Field of Education
031313 - Electrical Fitting, Electrical Mechanics
Original Release Date
12/07/2021
Nominal Hours
18
Description
This unit involves the skills and knowledge required to plan the electrical installation of integrated system.It includes implementing integrated system scenario and installation by determining bus system parameters, topology and installation requirements, bus system cables and terminations, control and dimming methods; and planning and documenting integrated installation plan.A network topology is the arrangement of a network, including its nodes and connecting lines. In a bus network topology, every workstation is connected to a main cable called the bus. No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Determine integrated system scenario
- 1.1 Customer requirements for scenes, events and controls in an integrated system are determined from job specifications and appropriate person/s
- 1.2 Types and locations of integrated system loads are determined from job specifications and customer requirements
- 1.3 Types and locations of control (input) devices of integrated system are determined from job specifications and customer requirements
- 1.4 Budget for the integrated system is determined from customer and appropriate person/s
2 Plan integrated system
- 2.1 Hazards are identified, risks assessed and control measures implemented
- 2.2 Integrated system devices and capabilities are incorporated the system plan
- 2.3 Number and types of output devices to meet scenario specified are chosen for compatibility with system loads
- 2.4 Number and types of control (input) devices to meet system scenario specified are obtained
- 2.5 Integrated systems are planned to comply with bus system and supply voltage parameters in accordance with job specifications
- 2.6 Other control methods are considered in developing an integrated system plan in accordance with workplace procedures
- 2.7 Integrated systems are planned within cost and budget constraints
- 2.8 Final plan is documented and submitted to appropriate person/s for approval in accordance with workplace procedures
3 Implement integrated system installation
- 3.1 Work health and safety (WHS)/occupational health and safety (OHS) risk control work measures and workplace procedures are followed
- 3.2 Integrated system is arranged using appropriate topology in accordance with workplace procedures
- 3.3 Connection chart/diagram between devices in the integrated system is developed in accordance with workplace procedures
- 3.4 Appropriate cable for the bus system is selected and connected at devices and accessories using the methods and the polarity specified by manufacturer specifications
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| WC656 | UEENEEI140A | Plan the electrical installation of integrated systems | Unit of competency |