Unit of competency Outline
Date retreived
23/07/2026 7:04 AM AWST
23/07/2026 7:04 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Conduct basic scaffolding operations
Conduct basic scaffolding operations
Unit of competency
National Code
RIIHAN211A
RIIHAN211A
State Code
WB696
WB696
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
19/01/2010
Field of Education
040329 - Scaffolding And Rigging
Original Release Date
19/01/2010
Nominal Hours
40
Description
This unit covers the conduct of basic scaffolding operations in the resources and infrastructure industries. It includes planning and preparing for scaffolding operations, erecting and maintaining scaffolding and dismantling scaffolding. The work required in this unit relates to the National Standard for High Risk Work. Licensing, legislative, regulatory and certification requirements that apply to this unit can vary between states, territories and industry sectors. Relevant information must be sourced prior to application of the unit.
Notes
Elements and Performance Criteria
1. Plan and prepare for scaffolding operations
- 1.1. Access, interpret and apply compliance documentation relevant to the work activity
- 1.2. Access and interpret work requirements
- 1.3. Develop the preliminary scaffolding plan in accordance with safety requirements
- 1.4. Confirm site preparation with other appropriate personnel and implement hazard control measures if necessary
- 1.5. Identify and select equipment consistent with work requirements
- 1.6. Check equipment is ready for use and report, label and repair any defects
- 1.7. Confirm scaffolding plan in accordance with Statutory/regulatory authorities and environmental requirements
2. Erect and maintain scaffolding
- 2.1. Erect scaffolding in accordance with safe work practices
- 2.2. Adhere to safety requirements at heights, on incomplete structures and in confined spaces
- 2.3. Install static lines when specified
- 2.4. Assemble and erect lifting device where specified
- 2.5. Inspect critical structural and safety areas and equipment periodically while in use to identify any variation from the plan and record inspection in inspection log
- 2.6. Perform alteration or repair to critical structural and safety areas and equipment
3. Dismantle scaffolding
- 3.1. Isolate scaffolding and appropriately sign and barricade to enable safe dismantling
- 3.2. Inspect, classify, label and dismantle scaffolding safely using the reverse procedure for erection
- 3.3. Clear work area and dispose of used and recycled materials in accordance with job specification, relevant statutory/regulatory authorities and environmental requirements
- 3.4. Clean and check equipment and store in accordance with manufacturer's recommendations and standard work practices
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Compliance documentation may include:
legislative, organisation and site requirements and procedures
manufacturer's guidelines and specifications
Australian standards
relevant federal, state and local authorities administering the applicable acts
regulations
relevant code of practice
manufacturer's requirements
Employment and workplace relations legislation
Equal Employment Opportunity Disability Discrimination legislation
Work requirements may include:
plans
specifications
quality scaffolding requirements
quantity scaffolding requirements
operational details
shift briefings
handover details
work orders
purpose of scaffolding
Preliminary scaffolding plan may include:
site sketch
scaffolding requirements
scaffolding / equipment configurations
identification of potential hazards
control measures
site access and exit
estimation of types and quantities of components
identification of scaffolding coordination requirements
transportation of required equipment
Safety may include:
relevant OHS requirements in accordance with the following:
applicable legislation
applicable regulations
applicable code of practice
applicable organisational safety policies and procedures
project safety plan
protective clothing and equipment
use of tools and equipment
workplace environment
handling of materials
use of fire fighting equipment
First Aid
hazard control including hazardous materials and substances
safe operating workplace procedures
conduct an operational risk assessment and treatments associated with power cables including:
overhead service trays
cables and conduits
lighting
earth leakage boxes
trip hazards
working with dangerous materials
working in confined spaces
surrounding structures
restricted access barriers
traffic control
working at heights
working in proximity to others
worksite visitors
the public
emergency procedures including:
extinguishing fires
organisational First Aid requirements
evacuation
management plans
manufacturer's instructions
reporting defects in equipment
Site preparation may include:
site isolation
worksite inspection
assessment of conditions
hazard identification
erection of barriers
installation of signage
assembly and erection of lifting devices
establishment of footings
equipment defect identification
Equipment may include:
plant
tools
free standing prefabricated scaffolds
cantilevered hoists with a working load limit not exceeding 500kg (materials only)
ropes
gin wheels
safety nets and static lines
bracket scaffolds (tank and formwork)
aluminium modular scaffolding equipment
ladders
scaffolding planks
steel box spanners
hammers
spirit levels
tape measures
shovels
spanners
whipping cord
fibre rope
scaffolding materials
Statutory/regulatory authorities may include:
relevant federal, state and local authorities administering the applicable acts
regulations
relevant code of practice
applicable Australian standards
manufacturer's requirements
Environmental requirements may include:
waste management
noise
dust
clean-up management
environmental plans
regulatory obligations
environmental protection
Safe work practices may include:
planned hazard prevention and control measures
whipping designated rope ends in accordance with regulations and project specifications
splicing designated rope ends in accordance with regulations and project specifications
applying bends and hitches and inspecting them in accordance with project specifications
maintenance of an inspection log for the inspection and repair of scaffolding
Critical structural and safety areas may include:
damage
corrosion
wear
stability
current usage reconciled with changes to the plan via the inspection log
scaffold stability
Compliance documentation may include:
legislative, organisation and site requirements and procedures
manufacturer's guidelines and specifications
Australian standards
relevant federal, state and local authorities administering the applicable acts
regulations
relevant code of practice
manufacturer's requirements
Employment and workplace relations legislation
Equal Employment Opportunity Disability Discrimination legislation
Work requirements may include:
plans
specifications
quality scaffolding requirements
quantity scaffolding requirements
operational details
shift briefings
handover details
work orders
purpose of scaffolding
Preliminary scaffolding plan may include:
site sketch
scaffolding requirements
scaffolding / equipment configurations
identification of potential hazards
control measures
site access and exit
estimation of types and quantities of components
identification of scaffolding coordination requirements
transportation of required equipment
Safety may include:
relevant OHS requirements in accordance with the following:
applicable legislation
applicable regulations
applicable code of practice
applicable organisational safety policies and procedures
project safety plan
protective clothing and equipment
use of tools and equipment
workplace environment
handling of materials
use of fire fighting equipment
First Aid
hazard control including hazardous materials and substances
safe operating workplace procedures
conduct an operational risk assessment and treatments associated with power cables including:
overhead service trays
cables and conduits
lighting
earth leakage boxes
trip hazards
working with dangerous materials
working in confined spaces
surrounding structures
restricted access barriers
traffic control
working at heights
working in proximity to others
worksite visitors
the public
emergency procedures including:
extinguishing fires
organisational First Aid requirements
evacuation
management plans
manufacturer's instructions
reporting defects in equipment
Site preparation may include:
site isolation
worksite inspection
assessment of conditions
hazard identification
erection of barriers
installation of signage
assembly and erection of lifting devices
establishment of footings
equipment defect identification
Equipment may include:
plant
tools
free standing prefabricated scaffolds
cantilevered hoists with a working load limit not exceeding 500kg (materials only)
ropes
gin wheels
safety nets and static lines
bracket scaffolds (tank and formwork)
aluminium modular scaffolding equipment
ladders
scaffolding planks
steel box spanners
hammers
spirit levels
tape measures
shovels
spanners
whipping cord
fibre rope
scaffolding materials
Statutory/regulatory authorities may include:
relevant federal, state and local authorities administering the applicable acts
regulations
relevant code of practice
applicable Australian standards
manufacturer's requirements
Environmental requirements may include:
waste management
noise
dust
clean-up management
environmental plans
regulatory obligations
environmental protection
Safe work practices may include:
planned hazard prevention and control measures
whipping designated rope ends in accordance with regulations and project specifications
splicing designated rope ends in accordance with regulations and project specifications
applying bends and hitches and inspecting them in accordance with project specifications
maintenance of an inspection log for the inspection and repair of scaffolding
Critical structural and safety areas may include:
damage
corrosion
wear
stability
current usage reconciled with changes to the plan via the inspection log
scaffold stability
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The evidence required to demonstrate competency in this unit must be relevant to worksite operations and satisfy all of the requirements of the performance criteria, required skills and knowledge and the range statement of this unit and include evidence of the following:
knowledge of the requirements, procedures and instructions for the conduct of basic scaffolding operations
implementation of requirements, procedures and techniques for the safe, effective and efficient conduct of basic scaffolding operations
working with others to undertake and complete the conduct of basic scaffolding operations that meets all of the required outcomes
consistent timely completion of basic scaffolding operations that safely, effectively and efficiently meets the required outcomes
Context of and specific resources for assessment
This unit must be assessed in the context of the work environment. Where personal safety or environmental damage are limiting factors, assessment may occur in a simulated environment provided it is realistic and sufficiently rigorous to cover all aspects of workplace performance, including task skills, task management skills, contingency management skills and job role environment skills.
Assessment of this competency requires typical resources normally used in a resources and infrastructure sector environment. Selection and use of resources for particular worksites may differ due to the site circumstances.
The assessment environment should not disadvantage the participant. For example, language, literacy and numeracy demands of assessment should not be greater than those required on the job.
Customisation of assessment and delivery environment should sensitively accommodate cultural diversity.
Aboriginal people and other people from a non English speaking background may have second language issues.
Where applicable, physical resources should include equipment modified for people with disabilities. Access must be provided to appropriate learning and/or assessment support when required.
Method of assessment
This unit may be assessed in a holistic way with other units of competency. The assessment strategy for this unit must verify required knowledge and skill and practical application using more than one of the following assessment methods:
written and/or oral assessment of the candidate's required knowledge
observed, documented and/or first hand testimonial evidence of the candidate's:
implementation of appropriate requirements, procedures and techniques for the safe, effective and efficient achievement of required outcomes
consistent achievement of required outcomes
first hand testimonial evidence of the candidate's:
working with others to undertake and complete basic scaffolding operations
Guidance information for assessment
Consult the SkillsDMC User Guide for further information on assessment including access and equity issues.
Overview of assessment
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The evidence required to demonstrate competency in this unit must be relevant to worksite operations and satisfy all of the requirements of the performance criteria, required skills and knowledge and the range statement of this unit and include evidence of the following:
knowledge of the requirements, procedures and instructions for the conduct of basic scaffolding operations
implementation of requirements, procedures and techniques for the safe, effective and efficient conduct of basic scaffolding operations
working with others to undertake and complete the conduct of basic scaffolding operations that meets all of the required outcomes
consistent timely completion of basic scaffolding operations that safely, effectively and efficiently meets the required outcomes
Context of and specific resources for assessment
This unit must be assessed in the context of the work environment. Where personal safety or environmental damage are limiting factors, assessment may occur in a simulated environment provided it is realistic and sufficiently rigorous to cover all aspects of workplace performance, including task skills, task management skills, contingency management skills and job role environment skills.
Assessment of this competency requires typical resources normally used in a resources and infrastructure sector environment. Selection and use of resources for particular worksites may differ due to the site circumstances.
The assessment environment should not disadvantage the participant. For example, language, literacy and numeracy demands of assessment should not be greater than those required on the job.
Customisation of assessment and delivery environment should sensitively accommodate cultural diversity.
Aboriginal people and other people from a non English speaking background may have second language issues.
Where applicable, physical resources should include equipment modified for people with disabilities. Access must be provided to appropriate learning and/or assessment support when required.
Method of assessment
This unit may be assessed in a holistic way with other units of competency. The assessment strategy for this unit must verify required knowledge and skill and practical application using more than one of the following assessment methods:
written and/or oral assessment of the candidate's required knowledge
observed, documented and/or first hand testimonial evidence of the candidate's:
implementation of appropriate requirements, procedures and techniques for the safe, effective and efficient achievement of required outcomes
consistent achievement of required outcomes
first hand testimonial evidence of the candidate's:
working with others to undertake and complete basic scaffolding operations
Guidance information for assessment
Consult the SkillsDMC User Guide for further information on assessment including access and equity issues.
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| W1896 | MNCG1046A | Conduct basic scaffolding operations | Unit of competency |
| W1880 | BCGSC2002B | Erect and dismantle scaffolding - basic | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| WH305 | RIIHAN211D | Conduct basic scaffolding operations | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| W675 | RII31109 | Certificate III in Bridge Construction and Maintenance | Qualification |
| W676 | RII31209 | Certificate III in Civil Foundations | Qualification |
| W654 | RII20109 | Certificate II in Resources and Infrastructure Work Preparation | Qualification |