Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Install underground cable for communications applications

Install underground cable for communications applications

Unit of competency
National Code
ICTCBL329
State Code
OBA59
TGA Status
Current
DTWD Status
Approved
Current Release Number
1.00
Current Release Date
30/08/2019
State Implementation and Classification
Approved Date
27/11/2019
Field of Education
031309 - Communications Equipment Installation And Maintenance
Original Release Date
27/11/2019
Nominal Hours
55
Description
This unit describes the skills and knowledge required to install underground cable for all communications applications in access networks or customer premises.It applies to technical staff who install cable for new installations and upgrades to telecommunications cabling infrastructure for communications applications including broadcasting or reception (digital video broadcasting - terrestrial [DVB-T], satellite [DVB-S], long term evolution [LTE]), closed-circuit television (CCTV), digital and analog, telephony, data, video, computer networks, local area networks (LANs), wide area networks (WANs), fibre optic networks and multimedia.Licensing, legislative, regulatory and certification requirements apply to telecommunications systems. Work functions in the occupational areas where this unit may be used may be subject to regulatory requirements and/or the carrier’s guidelines. All customer cabling work in the telecommunications, fire, security and data industries must be performed by a registered cabler. All cablers are required to register with an Australian Communications and Media Authority (ACMA) accredited registrar. Refer to the ICT Information and Communications Technology Training Package Companion Volume Implementation Guide or the relevant regulator for specific guidance on requirements.
Notes
Elements and Performance Criteria
1. Prepare for underground cable hauling
  • 1.1 Access site according to required enterprise procedures
  • 1.2 Verify cable installation requirements from plans and recognise constraints
  • 1.3 Identify from plans, correct duct to be hauled
  • 1.4 Inform appropriate personnel of existing and potential worksite hazards
  • 1.5 Obtain information about location of other services from relevant authorities
  • 1.6 Select suitable tools, equipment and protective equipment to meet required industry standards
  • 1.7 Check for dangerous gases and place guards around open manholes following work health and safety (WHS) and environmental requirements
  • 1.8 Confirm correct duct/conduit to be utilised for hauling at site and access to intermediate manholes/pits along the hauling route
  • 1.9 Rod and rope the conduit/duct to be hauled
  • 1.10 Set-up cable installation equipment according to manufacturer requirements and enterprise guidelines
  • 1.11 Clean debris and obstructions from conduit using appropriate mandrels
  • 1.12 Seal cable ends to exclude entrance of foreign matter
2. Haul underground cable
  • 2.1 Run hauling feeder through conduit to enable cable hauling
  • 2.2 Use rodding techniques to prove that conduit is clear for hauling
  • 2.3 Attach cable to hauling feeder according to manufacturer specifications
  • 2.4 Employ cable slippers or rollers to ensure no sheath damage when hauling into and out of enclosures
  • 2.5 Lubricate cable and haul evenly at correct tension to reduce risk of cable damage
  • 2.6 Maintain sufficient cable length allowance for jointing and ensure cable is housed within bending radius tolerance for cable materials in an underground enclosure
  • 2.7 Maintain cable and services separations in parallel runs and crossovers according to manufacturer and regulatory requirements
3. Seal and secure cable and complete all documentation
  • 3.1 Tag all cables to enable future identification
  • 3.2 Seal cable ends according to enterprise requirements to prevent entrance of foreign material
  • 3.3 Place cable on supports in enclosures to reduce damage to conductors and enable ease of access for maintenance
  • 3.4 Fit voltage protection devices to all cables with metallic component as required
  • 3.5 Complete installation reports and design amendments accurately, and file promptly according to customer requirements
  • 3.6 Reinstate site to customer satisfaction and dispose of waste in environmentally safe manner as required
  • 3.7 Notify appropriate personnel and obtain sign-off
No information
No information
Replaces
State Code National Code Title Type
AWE74 ICTCBL308 Install underground cable Unit of competency