Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Conduct Technical Inspection of Process Plant and Equipment
Conduct Technical Inspection of Process Plant and Equipment
Unit of competency
National Code
UEPMNT421A
UEPMNT421A
State Code
S5130
S5130
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
31/05/2011
Field of Education
031311 - Powerline Installation And Maintenance
Original Release Date
31/05/2011
Nominal Hours
90
Description
1)
This unit deals with the skills and knowledge required to conduct the technical inspection of a generation plant, equipment, processes and associated infrastructure.
This unit deals with the skills and knowledge required to conduct the technical inspection of a generation plant, equipment, processes and associated infrastructure.
Notes
Elements and Performance Criteria
1 Prepare for inspection process plant
- 1.1 Short term maintenance and operating history is obtained
- 1.2 Deviations from normal operational parameters are identified
- 1.3 Potential options for cause of deviations are established
- 1.4 Needs and outcomes for plant inspections and/or test are defined, in accordance with potential options
- 1.5 Appropriate method sheets, check sheets and isolation instructions are obtained
- 1.6 Relevant technical and engineering procedures are considered and adapted where required
- 1.7 Where appropriate, the teams and individuals roles and responsibilities within the team are identified and, where required, assist in the provision of the on-the-job training
2 Inspection process plant
- 2.1 Plant is correctly identified
- 2.2 Plant operational status is identified
- 2.3 Work is carried out in accordance statutory, enterprise/site requirements
- 2.4 Appropriate methods are followed
- 2.5 Relevant documentation is completed
- 2.6 The needs and outcomes for the inspection are achieved
- 2.7 Any needs for additional tests/inspections required are defined
- 2.8 Plant/equipment is left in a safe condition
- 2.9 Plant/equipment availability is declared
- 2.10 Specialist assistance is sought when required
3 Evaluate/analyse inspection results
- 3.1 Test/inspection results and data are analysed
- 3.2 Conclusions drawn with reference to potential options
- 3.3 Causes for deviations from normal operation are identified
4 Prepare remedial action plan
- 4.1 Action plan is prepared for any required remedial action
- 4.2 Remedial action is followed up and checked for effectiveness
5 Update documentation
- 5.1 All relevant records and documentation are updated in accordance with statutory, industry and enterprise requirements
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| AYF87 | UTPNEG232A | Conduct technical inspection of process plant and equipment | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| WE279 | UEPMNT421B | Conduct technical inspection of process plant and equipment | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| S505 | UEP40306 | Certificate IV in ESI Generation Maintenance (Mechanical) | Qualification |