Unit of competency Outline

Date retreived
23/07/2026 2:58 PM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Implement erosion and sediment control measures

Implement erosion and sediment control measures

Unit of competency
National Code
AHCSAW304
State Code
OCT26
TGA Status
Current
DTWD Status
Approved
Current Release Number
1.00
Current Release Date
24/12/2020
State Implementation and Classification
Approved Date
21/05/2021
Field of Education
050999 - Environmental Studies, N.e.c.
Original Release Date
21/05/2021
Nominal Hours
70
Description
This unit of competency describes the skills and knowledge required to construct, install and maintain a range of measures specified on erosion and sediment control plans.The unit applies to individuals who work under broad direction and take responsibility for their own work, including limited responsibility for the work of others. They use discretion and judgement in the selection, allocation and use of available resources and for solving problems.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1. Prepare for implementation and construction
  • 1.1 Confirm erosion and sediment control site and work requirements with maps, plans and specifications
  • 1.2 Identify and locate worksite and surveyed work according to maps and site plans
  • 1.3 Select, check and prepare machinery and equipment required for erosion and sediment control work
  • 1.4 Verify the suitability of equipment and attachments for terrain and control works
  • 1.5 Identify hazards, assess risks and implement controls according to workplace health and safety and environmental procedures
  • 1.6 Select, check and use personal protective equipment
  • 1.7 Select materials required for proposed works according to plans and specifications
2. Carry out implementation and construction
  • 2.1 Coordinate work sequence with work team according to planned works
  • 2.2 Operate tools and equipment safely using techniques suitable for terrain, site conditions and other operators and site worker safety
  • 2.3 Construct erosion and sediment control earthworks according to specifications
3. Carry out repairs and maintenance procedures
  • 3.1 Monitor site operations and identify and resolve performance issues according to workplace procedures
  • 3.2 Clean, maintain and store machinery, tools and equipment according to environmental and biosecurity procedures
  • 3.3 Maintain records according to workplace procedures
No information
No information
Replaces
State Code National Code Title Type
BAN92 AHCSAW302 Implement erosion and sediment control measures Unit of competency