Unit of competency Outline

Date retreived
23/07/2026 4:16 PM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Implement erosion and sediment control measures

Implement erosion and sediment control measures

Unit of competency
National Code
AHCSAW302
State Code
BAN92
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
27/06/2016
State Implementation and Classification
Approved Date
12/01/2017
Field of Education
050999 - Environmental Studies, N.e.c.
Original Release Date
12/01/2017
Nominal Hours
50
Description
This unit of competency describes the skills and knowledge required to construct, install and maintain a range of measures specified on erosion and sediment control plans.This unit applies to individuals who work under broad direction and take responsibility for their own work including limited responsibility for the work of others.No occupational licensing, legislative or certification requirements are known to apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1. Prepare for implementation and construction
  • 1.1 Confirm that erosion and sediment control plan and schedule of works match site conditions
  • 1.2 Identify survey pegs and site indicators on site
  • 1.3 Match equipment and tools to program works and terrain on site
  • 1.4 Verify work readiness of selected equipment and tools
  • 1.5 Assess and minimise risks to others and the environment
  • 1.6 Select and use appropriate personal protective equipment
  • 1.7 Select materials to complete proposed works in line with construction schedule
2. Carry out implementation and construction
  • 2.1 Plan work sequence
  • 2.2 Construct earthworks
  • 2.3 Install erosion and sediment control products and materials
3. Carry out repairs and maintenance procedures
  • 3.1 Monitor site, identify issues and carry out repairs as necessary
  • 3.2 Complete maintenance procedures as required
  • 3.4 Clean and store machinery, tools and equipment
  • 3.5 Complete work records
No information
No information
Replaces
State Code National Code Title Type
D7236 AHCSAW302A Implement erosion and sediment control measures Unit of competency
Replaced By
State Code National Code Title Type
OCT26 AHCSAW304 Implement erosion and sediment control measures Unit of competency