Unit of competency Outline
Date retreived
23/07/2026 8:43 PM AWST
23/07/2026 8:43 PM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Install and replace windows and doors
Install and replace windows and doors
Unit of competency
National Code
CPCCCA3010A
CPCCCA3010A
State Code
W9349
W9349
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
02/04/2014
Field of Education
040311 - Carpentry And Joinery
Original Release Date
02/04/2014
Nominal Hours
32
Description
This unit of competency specifies the outcomes required to plan, prepare, set out and install window and door units, and to replace window and door units to different types and styles of buildings for access, security, weather proofing and replacement of defective windows and doors. It includes timber and metal window and door units.
Notes
Elements and Performance Criteria
1. Plan and prepare.
- 1.1. Work instructions, including plans, specifications, quality requirements and operational details, are obtained, confirmed and applied using relevant information for planning and preparation purposes.
- 1.2. Safety (OHS) requirements are followed in accordance with safety plans and policies.
- 1.3. Signage and barricade requirements are identified and implemented.
- 1.4. Plant, tools and equipment selected to carry out tasks are consistent with job requirements, checked for serviceability, and any faults are rectified or reported prior to commencement.
- 1.5. Material quantity requirements are calculated in accordance with plans, specifications and quality requirements.
- 1.6. Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use.
- 1.7. Environmental requirements are identified for the project in accordance with environmental plans and statutory and regulatory authority obligations, and are applied.
2. Install window units to frame.
- 2.1. Window opening size is checked to be greater than overall window frame.
- 2.2. Reveals are joined and fixed securely to frames where specified.
- 2.3. Window unit is located to suit brickwork and eaves finish for veneer construction, whichever is applicable.
- 2.4. Window unit is positioned in place so that head/sill are level and stiles are plumb and in wind, ensuring reveals or frame are finished flush with face of inside wall lining.
- 2.5. Window is packed and fixed to wall frame through/to studs, in accordance with specified fixing and fastening methods.
3. Replace window units/door frames.
- 3.1. Architraves and nosing are removed.
- 3.2. Sill bricks or cladding are removed where specified.
- 3.3. Fasteners are cut, packing removed and flashing detached from frame.
- 3.4. Window unit/ door frame is removed.
- 3.5. Window unit/door frame and window components are installed to plumb, level and wind.
- 3.6. Architraves and mouldings are replaced.
4. Prepare door opening, and construct and fix jamb.
- 4.1. Door frame opening size is checked to be greater than the overall door jamb width and height, allowing for plumbing of stiles, thickness of floor covering, levelling of door head and level of floor.
- 4.2. Jamb stiles are marked and cut to length allowing for clearances according to specifications.
- 4.3. Head is trenched to accommodate jamb stiles allowing for clearance according to specification.
- 4.4. Jamb frame is assembled, squared and braced with rebates flush.
- 4.5. Joints and rebates are cleaned and finished to quality requirements.
5. Install door and door unit.
- 5.1. Door unit is positioned in place so that the head/sill is level and stiles are plumb and in wind, ensuring reveals or frame finished flush with face of inside wall lining.
- 5.2. Door is fitted to jamb allowing for clearances according to specifications with lock stile door backed off to facilitate correct operation.
- 5.3. Hinges are marked out on door and jamb.
- 5.4. Hinges are fitted to door and jamb.
- 5.5. Final adjustments of door are made.
- 5.6. Door furniture components are fitted and fixed to manufacturer specifications.
6. Clean up.
- 6.1. Work area is cleared and materials disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification.
- 6.2. Plant, tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices.
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Information includes:
diagrams or sketches
instructions issued by authorised organisational or external personnel
manufacturer specifications and instructions where specified
memos
MSDS
organisation work specifications and requirements
plans and specifications
regulatory and legislative requirements pertaining to installing and replacing windows and doors
relevant Australian standards
safe work procedures related to installing and replacing windows and doors
signage
verbal or written and graphical instructions
work bulletins
work schedules.
Planning and preparation include:
work site inspection
equipment defect identification
assessment of conditions and hazards
determination of work requirements.
Safety (OHS) is to be in accordance with state or territory legislation, regulations, codes of practice, organisational safety policies and procedures, and project safety plan and may include:
emergency procedures, including extinguishing fires, organisational first aid requirements and evacuation
handling of materials
hazard control
hazardous materials and substances
safe operating procedures, including the conduct of operational risk assessment and treatments associated with:
earth leakage boxes
lighting
power cables, including overhead service trays, cables and conduits
restricted access barriers
surrounding structures
traffic control
trip hazards
work site visitors and the public
working at heights
working in confined spaces
working in proximity to others
working with dangerous materials
organisational first aid
personal protective clothing and equipment prescribed under legislation, regulations and workplace policies and practices
use of firefighting equipment
use of tools and equipment
workplace environment and safety.
Tools and equipment include:
air compressors and hoses
bevels
chisels
hammers
hand saws
marking equipment
measuring tapes and rules
nail bags
nail guns
power drills
power leads
power saws
protractors
saw stools
scaffolding
spirit levels
squares (combination/tri)
stair clips and tables
steel squares and fences
string lines.
Quality requirements include relevant regulations, including:
Australian standards
internal company quality policy and standards
manufacturer specifications, where specified
workplace operations and procedures.
Materials include:
barrel bolts
cabin hooks
closers
dead bolts
flash bolts
flashings
handles
hinges (butt and parliament)
latches
locks
metal
night latches
passage sets
timber.
Environmental requirements include:
clean-up protection
noise and dust
vibration
waste management.
Statutory and regulatory authorities include:
federal, state and local authorities administering applicable Acts, regulations and codes of practice.
Windows include:
all size windows
casement, double hung, hopper, straight and sliding, including glazed sliding doors, curved and bay.
Reveals:
may or may not be fitted with windows.
Door frames:
may be fixed first and then the door installed or doors may be fixed to the frame prior to installation
doors may be hung to timber or metal frames.
Window components include:
reveal
sill
trimmers.
Doors include:
flush panel, framed and panelled, and glazed
door units are to cover hinged door units and include standard doors, sliding, flywire, combination window/door units, door sidelight units (glazed or unglazed) and internal doors
door jambs, door stiles and door sills.
Door furniture components include:
grips, latches/deadlocks, push plates and closers
handles and locks.
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Information includes:
diagrams or sketches
instructions issued by authorised organisational or external personnel
manufacturer specifications and instructions where specified
memos
MSDS
organisation work specifications and requirements
plans and specifications
regulatory and legislative requirements pertaining to installing and replacing windows and doors
relevant Australian standards
safe work procedures related to installing and replacing windows and doors
signage
verbal or written and graphical instructions
work bulletins
work schedules.
Planning and preparation include:
work site inspection
equipment defect identification
assessment of conditions and hazards
determination of work requirements.
Safety (OHS) is to be in accordance with state or territory legislation, regulations, codes of practice, organisational safety policies and procedures, and project safety plan and may include:
emergency procedures, including extinguishing fires, organisational first aid requirements and evacuation
handling of materials
hazard control
hazardous materials and substances
safe operating procedures, including the conduct of operational risk assessment and treatments associated with:
earth leakage boxes
lighting
power cables, including overhead service trays, cables and conduits
restricted access barriers
surrounding structures
traffic control
trip hazards
work site visitors and the public
working at heights
working in confined spaces
working in proximity to others
working with dangerous materials
organisational first aid
personal protective clothing and equipment prescribed under legislation, regulations and workplace policies and practices
use of firefighting equipment
use of tools and equipment
workplace environment and safety.
Tools and equipment include:
air compressors and hoses
bevels
chisels
hammers
hand saws
marking equipment
measuring tapes and rules
nail bags
nail guns
power drills
power leads
power saws
protractors
saw stools
scaffolding
spirit levels
squares (combination/tri)
stair clips and tables
steel squares and fences
string lines.
Quality requirements include relevant regulations, including:
Australian standards
internal company quality policy and standards
manufacturer specifications, where specified
workplace operations and procedures.
Materials include:
barrel bolts
cabin hooks
closers
dead bolts
flash bolts
flashings
handles
hinges (butt and parliament)
latches
locks
metal
night latches
passage sets
timber.
Environmental requirements include:
clean-up protection
noise and dust
vibration
waste management.
Statutory and regulatory authorities include:
federal, state and local authorities administering applicable Acts, regulations and codes of practice.
Windows include:
all size windows
casement, double hung, hopper, straight and sliding, including glazed sliding doors, curved and bay.
Reveals:
may or may not be fitted with windows.
Door frames:
may be fixed first and then the door installed or doors may be fixed to the frame prior to installation
doors may be hung to timber or metal frames.
Window components include:
reveal
sill
trimmers.
Doors include:
flush panel, framed and panelled, and glazed
door units are to cover hinged door units and include standard doors, sliding, flywire, combination window/door units, door sidelight units (glazed or unglazed) and internal doors
door jambs, door stiles and door sills.
Door furniture components include:
grips, latches/deadlocks, push plates and closers
handles and locks.
EVIDENCE GUIDE
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
This unit of competency could be assessed in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of the ability to:
locate, interpret and apply relevant information, standards and specifications
comply with site safety plan, OHS regulations and state and territory legislation applicable to workplace operations
comply with organisational policies and procedures, including quality requirements
safely and effectively use tools, plant and equipment
communicate and work effectively and safely with others
install one standard window or glazed sliding door unit to specifications
replace one standard window or glazed sliding door unit to specifications
construct and fit one standard external rebated door jamb/frame to specifications
fit and hang one standard door, including the door furniture and a pair of doors with door jambs to specifications.
Context of and specific resources for assessment
This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.
Assessment of essential underpinning knowledge will usually be conducted in an off-site context.
Assessment is to comply with relevant regulatory or Australian standards' requirements.
Resource implications for assessment include:
an induction procedure and requirement
realistic tasks or simulated tasks covering the mandatory task requirements
relevant specifications and work instructions
tools and equipment appropriate to applying safe work practices
support materials appropriate to activity
workplace instructions relating to safe work practices and addressing hazards and emergencies
material safety data sheets
research resources, including industry related systems information.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Method of assessment
Assessment methods must:
satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package
include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
reinforce the integration of employability skills with workplace tasks and job roles
confirm that competency is verified and able to be transferred to other circumstances and environments.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice, with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.
Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
This unit of competency could be assessed in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of the ability to:
locate, interpret and apply relevant information, standards and specifications
comply with site safety plan, OHS regulations and state and territory legislation applicable to workplace operations
comply with organisational policies and procedures, including quality requirements
safely and effectively use tools, plant and equipment
communicate and work effectively and safely with others
install one standard window or glazed sliding door unit to specifications
replace one standard window or glazed sliding door unit to specifications
construct and fit one standard external rebated door jamb/frame to specifications
fit and hang one standard door, including the door furniture and a pair of doors with door jambs to specifications.
Context of and specific resources for assessment
This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.
Assessment of essential underpinning knowledge will usually be conducted in an off-site context.
Assessment is to comply with relevant regulatory or Australian standards' requirements.
Resource implications for assessment include:
an induction procedure and requirement
realistic tasks or simulated tasks covering the mandatory task requirements
relevant specifications and work instructions
tools and equipment appropriate to applying safe work practices
support materials appropriate to activity
workplace instructions relating to safe work practices and addressing hazards and emergencies
material safety data sheets
research resources, including industry related systems information.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Method of assessment
Assessment methods must:
satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package
include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
reinforce the integration of employability skills with workplace tasks and job roles
confirm that competency is verified and able to be transferred to other circumstances and environments.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice, with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.
Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| W1795 | BCGCA3010B | Install and replace windows and doors | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| OCQ55 | CPCCCA3010 | Install windows and doors | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BFC0 | MSF30919 | Certificate III in Blinds, Awnings, Security Screens and Grilles | Qualification |
| W578 | CPC30208 | Certificate III in Carpentry | Qualification |
| D391 | CPC30211 | Certificate III in Carpentry | Qualification |
| 3722 | 52662WA | Certificate III in Carpentry (Housing) | Accredited course |
| W596 | CPC32008 | Certificate III in Carpentry and Joinery | Qualification |
| D409 | CPC32011 | Certificate III in Carpentry and Joinery | Qualification |
| D408 | CPC31911 | Certificate III in Joinery | Qualification |
| W595 | CPC31908 | Certificate III in Joinery | Qualification |
| J490 | CPC31912 | Certificate III in Joinery | Qualification |
| J489 | CPC31812 | Certificate III in Shopfitting | Qualification |
| D407 | CPC31811 | Certificate III in Shopfitting | Qualification |
| 1476 | 52212 | Certificate III in Steel Framing (Housing) | Accredited course |
| 3723 | 52663WA | Certificate III in Steel Framing (Housing) | Accredited course |