Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Install metal structures and features

Install metal structures and features

Unit of competency
National Code
AHCLSC308A
State Code
D6922
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
10/06/2011
State Implementation and Classification
Approved Date
15/10/2014
Field of Education
040301 - Building Science And Technology
Original Release Date
15/10/2014
Nominal Hours
30
Description
This unit covers the process of installing metal structures and features as a component of landscape project works and defines the standard required to: plan and set out a site for the installation; prepare and cut metal components; assemble and erect structure; check quality of work and clean up site.
Notes
Elements and Performance Criteria
1. Plan and prepare work
  • 1.1. Plans and specifications are interpreted and clarified with the supervisor.
  • 1.2. The quantity and quality of materials are checked to ensure they conform to design drawings and specifications.
  • 1.3. Tools and equipment are selected and checked for serviceability according to enterprise guidelines.
  • 1.4. Occupational Health and Safety (OHS) hazards are identified, risks assessed and controls implemented.
  • 1.5. Environmental implications of installing metal structures are identified and reported to the supervisor.
2. Set out the site for the structure
  • 2.1. Services are determined and located from site plans.
  • 2.2. The position of the structure or feature is marked out according to design drawings and specifications.
  • 2.3. Profiles are established to conform to the tolerances nominated within the design drawings and specifications.
  • 2.4. Footings are excavated and prepared according to the type of structure or feature to be installed.
3. Prepare and cut metal components
  • 3.1. Components are laid out ready for assembly to the requirements contained in the design drawings and specifications.
  • 3.2. The length of components and the positions of joins are marked out according to designated specifications in design drawings.
  • 3.3. Cutting tools are selected, used and maintained according to manufacturer's recommendations and OHS specifications.
  • 3.4. Components are cut and joined in preparation for assembly.
4. Assemble and erect structure
  • 4.1. Metal components are assembled into position and fixed into place according to design drawings and specifications.
  • 4.2. Remaining components are installed and fixed into position according to design drawings and specifications.
  • 4.3. Structure is finished off to ensure all components are secure and complete.
  • 4.4. Coatings are applied according to specifications, manufacturer's recommendations and OHS guidelines.
5. Check quality of work and clean up site
  • 5.1. Quality of finished work is inspected to ensure the standard of the finished structure or feature is in accordance with design drawings and specifications.
  • 5.2. Debris is cleaned from structure and site according to enterprise guidelines.
  • 5.3. Waste material is disposed of in an environmentally aware and sensitive manner.
  • 5.4. Unused metal components are stored for future re-use according to enterprise guidelines.
  • 5.5. Tools and equipment are cleaned and stored according to enterprise guidelines.
RANGE STATEMENT
The range statement relates to the unit of competency as a whole.
Installation may include:
fences
handrails
screens
seats
bollards
playground equipment
rubbish bins
plant surrounds
sculptures
other ornamental features.
EVIDENCE GUIDE
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment

Critical aspects for assessment and evidence required to demonstrate competency in this unit
The evidence required to demonstrate competency in this unit must be relevant to workplace operations and satisfy holistically all of the requirements of the performance criteria and required skills and knowledge and include achievement of the following:
plan and set out a site for the installation
prepare and cut metal components
assemble and erect structure
check quality of work and clean up site.
Context of and specific resources for assessment
Competency requires the application of work practices under work conditions. Selection and use of resources for some worksites may differ due to the regional or enterprise circumstances.
Replaces
State Code National Code Title Type
S3330 RTF3208A Install metal structures and features Unit of competency
Replaced By
State Code National Code Title Type
BAO56 AHCLSC308 Install metal structures and features Unit of competency