Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Install sprung timber flooring
Install sprung timber flooring
Unit of competency
National Code
MSFFL3037
MSFFL3037
State Code
WI394
WI394
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
19/06/2014
Field of Education
040321 - Floor Coverings
Original Release Date
19/06/2014
Nominal Hours
46
Description
This unit of competency covers installing a special purpose sprung platform-based timber floor for use in sporting or leisure facilities.Licensing, legislative or certification requirements may apply to this unit and relevant state/territory and local government agencies should be consulted to determine any necessary certification or licensing for undertaking flooring work. Access to construction sites requires certification of general induction training specified by the National Code of Practice for Induction for Construction Work (ASCC 2007).
Notes
Elements and Performance Criteria
1 Prepare for work
- 1.1 Applicable work health and safety (WHS), legislative and organisational requirements relevant to the installing sprung timber flooring are verified and complied with
- 1.2 Instructions and/or plans are read and interpreted to identify process required to complete work tasks
- 1.3 Sub-floor condition is assessed for suitability for installation of sprung timber flooring consistent with Australian Standards, industry standards and manufacturer recommendations
- 1.4 Suitable underlays, adhesives, trims and accessories are selected if required
- 1.5 Tools, equipment and materials are selected and checked prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition
- 1.6 Sequence of work is planned to identify the starting point and to ensure efficiency and quality of the work
2 Set out materials
- 2.1 Timber flooring to be installed is checked against order
- 2.2 Timber flooring is acclimatised according to manufacturer recommendations
- 2.3 Skirting boards or cover trims are removed or undercut, if required, and stored for re-fitting or sent for machining
- 2.4 Timber flooring for fixing is organised and used in accordance with relevant safety management requirements
- 2.5 Adhesives and edge strips are prepared for use as required
- 2.6 Area to be covered is measured, working lines and starting point are established
3 Cut timber flooring
- 3.1 Instructions and sequence for laying and fixing are followed
- 3.2 Underfloor pads are laid according to manufacturer recommendations
- 3.3 Timber flooring is laid out to meet directional sequence, pattern match, specification requirements, and to minimise waste and joins as appropriate
- 3.4 The aesthetics of the materials are maximised, including matching grains and colours
- 3.5 Timber flooring is accurately and clearly marked for cutting
- 3.6 Timber flooring is cut to length and size for final laying to provide appropriate size and shape ensuring minimum waste
- 3.7 Materials for fixing are organised and used in accordance with relevant safety management requirements
4 Lay sprung timber flooring
- 4.1 Instructions and sequence for laying and fixing are followed
- 4.2 Materials for fixing are organised and used in accordance with relevant safety management requirements
- 4.3 Fixing methods and equipment are used following manufacturer recommendations
- 4.4 Appropriate field and perimeter expansion joints are allowed
- 4.5 Skirting boards or cover trims are fitted/re-fitted and finished
- 4.6 Finished job is inspected and any imperfections are rectified following workplace procedures
5 Complete housekeeping
- 5.1 Unused materials are stored or recycled as required
- 5.2 Tools and equipment are cleaned and stored appropriately
- 5.3 Work area is cleaned and rubbish disposed of appropriately
- 5.4 Workplace documentation is completed
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| W8587 | LMFFL3509A | Install sprung timber flooring | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| OAJ44 | MSFFL3084 | Install sprung timber flooring | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| J736 | MSF30813 | Certificate III in Flooring Technology | Qualification |