Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Carry out installation tasks for sprinkler irrigation
Carry out installation tasks for sprinkler irrigation
Unit of competency
National Code
AHCIRG210A
AHCIRG210A
State Code
WE007
WE007
TGA Status
Deleted
Deleted
DTWD Status
Deleted
Deleted
State Implementation and Classification
Approved Date
11/04/2013
Field of Education
059999 - Agriculture, Environmental And Related Studies, N.e.c.
Original Release Date
11/04/2013
Nominal Hours
35
Description
This Unit covers the process of assisting with the installation of sprinkler irrigation systems under supervision and defines the standard required to: assemble equipment and materials for installation work; assemble components; and identify faults and fix or report.
Notes
Elements and Performance Criteria
1 Prepare for work on installing sprinkler irrigation systems
- 1.1 The required materials,tools and equipment are identified according to lists provided and/or supervisor's instruction
- 1.2 Techniques used when loading and unloading materials demonstrate correct manual handling and minimise damage to the load and the vehicle
- 1.3 Suitable personal protective equipment(PPE) is selected and checked prior to use
- 1.4OHS hazards are identified and reported to the supervisor
2 Assemble and lay out components
- 2.1 Equipment is checked to confirm readiness for use
- 2.2 Materials are selected according to instructions
- 2.3 Irrigation components are laid out in accordance with instructions
- 2.4 Trenches are dug or tidied up in accordance with instructions where required
3 Install irrigation components
- 3.1 Pipeline is joined or finished according to instructions
- 3.2System components are added or inserted according to instructions
- 3.3 Lines are positioned and secured according to instructions
- 3.4 Pumps and valves are fitted according to instructions
4 Complete installation activities
- 4.1 The irrigation system is commissioned and observed
- 4.2 Problems and anomalies are recognised and reported
- 4.3 Equipment is cleaned and stored according to instructions
- 4.4 Materials are stored according to instructions
- 4.5 Waste is collected and disposed of or recycled according to workplace procedures
- 4.6 Workplace information is recorded in the appropriate format
The range statement relates to the Unit of Competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Sprinkler irrigation systems may include:
systems that use spray or rotor type sprinklers to distribute irrigation water at higher volume including pop-up sprinklers, fixed, and movable sprinklers (e.g. K Line and Ezy Shift).
Personal protective clothing and equipment (PPE) may include:
PPE may include steel capped boots/shoes, overalls, gloves, sun hat, sunscreen lotion, safety goggles, face mask and hearing protection, and any protection required for the use of equipment.
OHS should be identified through site risk assessment and organisational procedures and hazards may include:
solar radiation, dust, noise, air- and soil-borne micro-organisms, chemicals and hazardous substances, sharp hand tools and equipment, manual handling, holes, and slippery and uneven surfaces.
System components may include:
sprinklers
lines
filters and valves
pumps
delivery equipment
system controllers.
Sprinkler irrigation systems may include:
systems that use spray or rotor type sprinklers to distribute irrigation water at higher volume including pop-up sprinklers, fixed, and movable sprinklers (e.g. K Line and Ezy Shift).
Personal protective clothing and equipment (PPE) may include:
PPE may include steel capped boots/shoes, overalls, gloves, sun hat, sunscreen lotion, safety goggles, face mask and hearing protection, and any protection required for the use of equipment.
OHS should be identified through site risk assessment and organisational procedures and hazards may include:
solar radiation, dust, noise, air- and soil-borne micro-organisms, chemicals and hazardous substances, sharp hand tools and equipment, manual handling, holes, and slippery and uneven surfaces.
System components may include:
sprinklers
lines
filters and valves
pumps
delivery equipment
system controllers.
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
Critical aspects for assessment and evidence required to demonstrate competency in this Unit
The evidence required to demonstrate competency in this Unit must be relevant to workplace operations and satisfy holistically all of the requirements of the performance criteria and required skills and knowledge and include achievement of the following:
assemble equipment and materials for installation work
assemble components
identify faults and fix or report.
Context of and specific resources for assessment
Competency requires the application of work practices under work conditions. Selection and use of resources for some worksites may differ due to the regional or enterprise circumstances.
Overview of assessment
Critical aspects for assessment and evidence required to demonstrate competency in this Unit
The evidence required to demonstrate competency in this Unit must be relevant to workplace operations and satisfy holistically all of the requirements of the performance criteria and required skills and knowledge and include achievement of the following:
assemble equipment and materials for installation work
assemble components
identify faults and fix or report.
Context of and specific resources for assessment
Competency requires the application of work practices under work conditions. Selection and use of resources for some worksites may differ due to the regional or enterprise circumstances.
No information
| State Code | National Code | Title | Type |
|---|---|---|---|
| J155 | AHC21112 | Certificate II in Irrigation | Qualification |
| D453 | AHC20310 | Certificate II in Production Horticulture | Qualification |