Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Carry out basic levelling
Carry out basic levelling
Unit of competency
National Code
RIICCM208A
RIICCM208A
State Code
WB071
WB071
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
03/09/2012
Field of Education
040301 - Building Science And Technology
Original Release Date
03/09/2012
Nominal Hours
8
Description
This unit covers the carrying out of basic levelling in the civil construction industry. It includes planning and preparing, establishing offsets for civil works, setting up and using levelling device, and cleaning up. Licensing, legislative, regulatory and certification requirements that apply to this unit can vary between states, territories, and industry sectors. Relevant information must be sourced prior to application of the unit.
Notes
Elements and Performance Criteria
1. Plan and prepare
- 1.1. Access, interpret and apply compliance documentation relevant to the work activity
- 1.2. Obtain and confirm safety requirements from the site safety plan and organisational policies and procedures, and apply to the allotted task
- 1.3. Identify, obtain and implement signage requirements from the project traffic management plan
- 1.4. Select plant, tools and equipment to carry out levelling tasks consistent with the requirements of the job, check for serviceability and rectify or report any faults
- 1.5. Check levelling equipment for serviceability within specified tolerances, and report any faults
- 1.6. Identify environmental protection requirements from the project environmental management plan, and confirm and apply to the allotted task
2. Establish offsets for civil works
- 2.1. Establish offset and recovery pegs from survey controls to specified plans and drawings to meet project requirements
- 2.2. Re-establish earthwork and pavement control lines from offsets and/or recovery pegs in accordance with plans, drawings and specifications
- 2.3. Establish drainage offsets from survey control
3. Set up and use levelling device
- 3.1. Identify heights to be transferred/established from project plans or instructions
- 3.2. Set up and use levelling instruments correctly in accordance with standard operating procedures and manufacturer's guidelines
- 3.3. Transfer heights from the known to the required
- 3.4. Document results of levelling procedure and close them out to organisational requirements
4. Clean up
- 4.1. Clear work area and dispose of or recycle materials in accordance with project environmental management plan
- 4.2. Clean, check, maintain and store tools and equipment t
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Relevant compliance documentation may include:
legislative, organisational and site requirements and procedures
manufacturer's guidelines and specifications
Australian standards
Employment and workplace relations legislation
Equal Employment Opportunity and Disability Discrimination legislation
Safety requirements may include:
OHS requirements in accordance with state or territory legislation and regulations, organisational safety policies and procedures, and project safety plan including: protective clothing and equipment, use of tools and equipment, workplace environment and safety, handling of materials, use of fire fighting equipment, use of First Aid equipment, hazard control and hazardous materials and substances
safe operating procedures including recognising and preventing hazards associated with high voltage power lines, uneven/unstable terrain, trees, overhead service lines, bridges, surrounding buildings, obstructions, structures, facilities, dangerous materials, recently filled trenches, other machines, personnel, traffic control, working at heights, working in proximity to others, worksite visitors and the public
safe parking practices including ensuring access ways are clear, equipment/machinery is away from overhangs and refuelling sites, safe distance from excavations, and secured from unauthorised access or movement
recognising hazards and risks including uneven/unstable terrain, trees, fires, overhead and underground services, bridges, buildings, excavations, traffic, embankments, cuttings, structures and hazardous materials
emergency procedures related to equipment operation including emergency shutdown and stopping, extinguishing equipment fires, organisational First Aid requirements and evacuation
Tools and equipment may include:
levelling devices including:
spirit levels
laser levels
string lines
tape measures
automatic levels
survey pegs
levelling staffs
plumb bobs
optical square
inclinometers
batter pegs/boards
wooded/steel pegs
straight edges
hammers
chalk line
Levelling tasks may include:
transferring levels/heights for formwork
earthwork
roadwork
pipework
drainage works
positioning offsets
recovery pegs
Check levelling equipment may include:
tolerance checks including:
two peg test for automatic level
reverse readings for spirit level
Environmental protection requirements may include:
organisational/project environmental management plan
waste management
water quality protection
noise
vibration
dust and clean-up management
Heights may be indicated by:
drawing/sketch
verbal or written instructions
datum/survey peg
chalk or nail mark
mark on vertical surface
Levelling procedure may include:
open or closed traverse utilising height of instrument
rise and fall methods of reduction
Relevant compliance documentation may include:
legislative, organisational and site requirements and procedures
manufacturer's guidelines and specifications
Australian standards
Employment and workplace relations legislation
Equal Employment Opportunity and Disability Discrimination legislation
Safety requirements may include:
OHS requirements in accordance with state or territory legislation and regulations, organisational safety policies and procedures, and project safety plan including: protective clothing and equipment, use of tools and equipment, workplace environment and safety, handling of materials, use of fire fighting equipment, use of First Aid equipment, hazard control and hazardous materials and substances
safe operating procedures including recognising and preventing hazards associated with high voltage power lines, uneven/unstable terrain, trees, overhead service lines, bridges, surrounding buildings, obstructions, structures, facilities, dangerous materials, recently filled trenches, other machines, personnel, traffic control, working at heights, working in proximity to others, worksite visitors and the public
safe parking practices including ensuring access ways are clear, equipment/machinery is away from overhangs and refuelling sites, safe distance from excavations, and secured from unauthorised access or movement
recognising hazards and risks including uneven/unstable terrain, trees, fires, overhead and underground services, bridges, buildings, excavations, traffic, embankments, cuttings, structures and hazardous materials
emergency procedures related to equipment operation including emergency shutdown and stopping, extinguishing equipment fires, organisational First Aid requirements and evacuation
Tools and equipment may include:
levelling devices including:
spirit levels
laser levels
string lines
tape measures
automatic levels
survey pegs
levelling staffs
plumb bobs
optical square
inclinometers
batter pegs/boards
wooded/steel pegs
straight edges
hammers
chalk line
Levelling tasks may include:
transferring levels/heights for formwork
earthwork
roadwork
pipework
drainage works
positioning offsets
recovery pegs
Check levelling equipment may include:
tolerance checks including:
two peg test for automatic level
reverse readings for spirit level
Environmental protection requirements may include:
organisational/project environmental management plan
waste management
water quality protection
noise
vibration
dust and clean-up management
Heights may be indicated by:
drawing/sketch
verbal or written instructions
datum/survey peg
chalk or nail mark
mark on vertical surface
Levelling procedure may include:
open or closed traverse utilising height of instrument
rise and fall methods of reduction
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The evidence required to demonstrate competency in this unit must be relevant to worksite operations and satisfy all of the requirements of the performance criteria, required skills and knowledge and the range statement of this unit and include evidence of the following:
knowledge of the requirements, procedures and instructions for carrying out basic levelling
implementation of requirements, procedures and techniques for the safe, effective and efficient completion of basic levelling
working with others to undertake and complete the basic levelling in a way that meets all of the required outcomes
consistent timely completion of basic levelling that safely, effectively and efficiently meets the required outcomes
the conduct of a minimum of three different levelling tasks, at least one utilising an automatic level. One of the tasks must include closed traverse utilising either the height of instrument or rise and fall method of reduction
the conduct of a two peg test with an automatic level, to confirm instrument meets manufacturer's tolerances
the accurate recording of the results of each levelling procedure to organisational requirements
Context of and specific resources for assessment
This unit must be assessed in the context of the work environment. Where personal safety or environmental damage are limiting factors, assessment may occur in a simulated environment provided it is realistic and sufficiently rigorous to cover all aspects of workplace performance, including task skills, task management skills, contingency management skills and job role environment skills.
Assessment of this competency requires typical resources normally used in a resources and infrastructure sector environment. Selection and use of resources for particular worksites may differ due to the site circumstances.
The assessment environment should not disadvantage the participant. For example, language, literacy and numeracy demands of assessment should not be greater than those required on the job.
Customisation of assessment and delivery environment to sensitively accommodate cultural diversity.
Aboriginal people and other people from a non English speaking background may have second language issues.
Where applicable, physical resources should include equipment modified for people with disabilities. Access must be provided to appropriate learning and/or assessment support when required
Method of assessment
This unit may be assessed in a holistic way with other units of competency. The assessment strategy for this unit must verify required knowledge and skill and practical application using more than one of the following assessment methods:
written and/or oral assessment of the candidate's required knowledge
observed, documented and/or first hand testimonial evidence of the candidate's:
implementation of appropriate requirement, procedures and techniques for the safe, effective and efficient achievement of required outcomes
consistent achievement of required outcomes
first hand testimonial evidence of the candidate's:
working with others to undertake and complete the basic levelling
Guidance information for assessment
Consult the SkillsDMC User Guide for further information on assessment including access and equity issues.
Overview of assessment
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The evidence required to demonstrate competency in this unit must be relevant to worksite operations and satisfy all of the requirements of the performance criteria, required skills and knowledge and the range statement of this unit and include evidence of the following:
knowledge of the requirements, procedures and instructions for carrying out basic levelling
implementation of requirements, procedures and techniques for the safe, effective and efficient completion of basic levelling
working with others to undertake and complete the basic levelling in a way that meets all of the required outcomes
consistent timely completion of basic levelling that safely, effectively and efficiently meets the required outcomes
the conduct of a minimum of three different levelling tasks, at least one utilising an automatic level. One of the tasks must include closed traverse utilising either the height of instrument or rise and fall method of reduction
the conduct of a two peg test with an automatic level, to confirm instrument meets manufacturer's tolerances
the accurate recording of the results of each levelling procedure to organisational requirements
Context of and specific resources for assessment
This unit must be assessed in the context of the work environment. Where personal safety or environmental damage are limiting factors, assessment may occur in a simulated environment provided it is realistic and sufficiently rigorous to cover all aspects of workplace performance, including task skills, task management skills, contingency management skills and job role environment skills.
Assessment of this competency requires typical resources normally used in a resources and infrastructure sector environment. Selection and use of resources for particular worksites may differ due to the site circumstances.
The assessment environment should not disadvantage the participant. For example, language, literacy and numeracy demands of assessment should not be greater than those required on the job.
Customisation of assessment and delivery environment to sensitively accommodate cultural diversity.
Aboriginal people and other people from a non English speaking background may have second language issues.
Where applicable, physical resources should include equipment modified for people with disabilities. Access must be provided to appropriate learning and/or assessment support when required
Method of assessment
This unit may be assessed in a holistic way with other units of competency. The assessment strategy for this unit must verify required knowledge and skill and practical application using more than one of the following assessment methods:
written and/or oral assessment of the candidate's required knowledge
observed, documented and/or first hand testimonial evidence of the candidate's:
implementation of appropriate requirement, procedures and techniques for the safe, effective and efficient achievement of required outcomes
consistent achievement of required outcomes
first hand testimonial evidence of the candidate's:
working with others to undertake and complete the basic levelling
Guidance information for assessment
Consult the SkillsDMC User Guide for further information on assessment including access and equity issues.
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| W2072 | BCCCM2008B | Carry out basic levelling | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| WH084 | RIICCM208D | Carry out basic levelling | Unit of competency |