Unit of competency Outline

Date retreived
22/07/2026 9:16 PM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Manage bump in and bump out of shows

Manage bump in and bump out of shows

Unit of competency
National Code
CUAPPM514
State Code
ODD52
TGA Status
Current
DTWD Status
Approved
Current Release Number
1.00
Current Release Date
16/04/2021
State Implementation and Classification
Approved Date
26/11/2021
Field of Education
080399 - Business And Management, N.e.c.
Original Release Date
26/11/2021
Nominal Hours
150
Description
This unit describes the skills and knowledge required to manage the movement, transportation, installation and removal of equipment and physical elements for productions in the screen, media, entertainment and events industries. It involves organising equipment and people according to production and crewing requirements. The unit applies to those who display a high level of initiative, judgement and responsibility as they supervise the bump in and bump out of production areas, such as lighting, sound, staging, sets, props, scenic art or vision systems.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1. Organise equipment and human resources
  • 1.1 Determine crewing requirements and scope of work required
  • 1.2 Identify and obtain equipment and materials required according to budgetary guidelines
  • 1.3 Complete inventory checks to confirm physical elements are available and ready for use
  • 1.4 Assess risks and develop and implement hazard management plans
  • 1.5 Roster staff to meet production schedules according to production budget
2. Plan movement of physical elements
  • 2.1 Identify transport requirements and organise transport accordingly
  • 2.2 Estimate the number of people required to move equipment and advise required colleagues accordingly
  • 2.3 Develop contingency plans to minimise the impact of unexpected events on the bump in and bump out process
  • 2.4 Document plans for moving and installing equipment according to organisational procedures
3. Manage installation and removal of physical elements
  • 3.1 Supervise the safe installation and removal of physical elements according to production requirements
  • 3.2 Monitor progress of bump in and bump out of shows against production schedules and implement contingency plans as required
  • 3.3 Identify and respond to problems promptly in consultation with required personnel
  • 3.4 Organise storage and security of physical elements as required, including valuable items and hazardous materials
  • 3.5 Evaluate the bump in and bump out process with required personnel and note areas for improvement in future productions
No information
No information
Replaces
State Code National Code Title Type
WI144 CUAPPM504 Manage bump in and bump out of shows Unit of competency